| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.1 L+₹57,234.53 (8.74%)Admitted-Fee/PreQual/Technical/Finance | ₹7.1 L+₹57,234.53 (8.74%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Santha Kumar V L1 | Anil Jose L2 |
|---|---|---|---|---|---|
| 1.00 | 2.7.1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 6.36 | cum | 485 ₹3,084.6 Lowest | 506.67 ₹3,222.42 |
| 1.00 | OD294113/2025-2026 Laterite Masonry with nneatly dressed Laterite Stone of size 360x20x20 cm or nearest size in Cement Mortar 1 : 6 for foudation and basement including all cost of materials, labour charge etc. complete | 9.17 | cum | 6,100 ₹55,924.8 Lowest | 6,349.3 ₹58,210.38 |
| 1.00 | OD294112/2025-2026 Laterite Masonry with nneatly dressed Laterite Stone of size 30x20x20 cm or nearest size in Cement Mortar 1 : 6 for superstructure including all cost of materials, labour charge etc. complete | 10.82 | cum | 6,699 ₹72,509.98 Lowest | 7,203.12 ₹77,966.57 |
| 1.00 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 6.6 | cum | 800 ₹5,280 | 713.61 ₹4,709.83 Lowest |
| 1.00 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and einforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.99 | cum | 12,200.5 ₹85,244.89 Lowest | 13,151.39 ₹91,888.76 |
| 1.01 | 5.22A.1 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars | 768.57 | kg | 99.5 ₹76,472.72 Lowest | 109.13 ₹83,874.04 |
| 1.01 | 5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.64 | sqm | 629 ₹12,982.56 Lowest | 746.39 ₹15,405.49 |
| 1.01 | 5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 61.44 | sqm | 818 ₹50,257.92 Lowest | 940.45 ₹57,781.25 |
| 1.01 | 9.70.2 Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel
screws etc. complete:100x58x1.90 mm | 6 | no | 100 ₹600 Lowest | 105.66 ₹633.96 |
| 1.01 | 50.9.1.1 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid
for separately), using good quality Anjili wood /jack wood | 0.12 | cum | 1,01,500 ₹11,672.5 Lowest | 1,15,903.15 ₹13,328.86 |
Tender Value
₹8.1 L
EMD Value
₹21,000
Closing Date
14 May 2026, 5:00 pmClosed
DIVISIONAL FOREST OFFICER KASARAGOD
DIVISIONAL FOREST OFFICE KASARAGOD
Construction of ticket counter at Veeramalakunnu under kanhangad Range during 2025-26
2026_FD_832586_3
KFDDO/2719/2026-DFOKSGD/D
Open Tender
Civil Works - Buildings
Item Rate
RANIPURAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹21,000
Yes
15 Jun 2026
6 May 2026
16 May 2026
6 May 2026
14 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | 2.7.1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 6.36 | cum | 487.18 | ₹3,098.46 |
| 1.002 | OD294113/2025-2026 Laterite Masonry with nneatly dressed Laterite Stone of size 360x20x20 cm or nearest size in Cement Mortar 1 : 6 for foudation and basement including all cost of materials, labour charge etc. complete | 9.17 | cum | 6,105.1 | ₹55,971.56 |
| 1.003 | OD294112/2025-2026 Laterite Masonry with nneatly dressed Laterite Stone of size 30x20x20 cm or nearest size in Cement Mortar 1 : 6 for superstructure including all cost of materials, labour charge etc. complete | 10.82 | cum | 6,926.08 | ₹74,967.89 |
| 1.004 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 6.6 | cum | 686.16 | ₹4,528.66 |
| 1.005 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and einforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.99 | cum | 12,645.57 | ₹88,354.6 |
| 1.006 | 5.22A.1 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars | 768.57 | kg | 104.93 | ₹80,646.05 |
| 1.007 | 5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.64 | sqm | 717.68 | ₹14,812.92 |
| 1.008 | 5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 61.44 | sqm | 904.28 | ₹55,558.96 |
| 1.009 | 9.70.2 Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel
screws etc. complete:100x58x1.90 mm | 6 | no | 101.6 | ₹609.6 |
| 0.000 | 50.9.1.1 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid
for separately), using good quality Anjili wood /jack wood | 0.12 | cum | 1,11,445.34 | ₹12,816.21 |
stage.html
html • 0.02 MB
finance_1435131.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_1435131.xls
BOQ • 0.30 MB
agreement.pdf
Tender Documents • 0.10 MB
declaration.pdf
Tender Documents • 0.06 MB
payment.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .