Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.0 LAccepted-AOC | ₹72.0 L | L1 | Accepted-AOC Being L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Qualified Being L3 it is cancelled |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Qualified Being L2 it is cancelled |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technially Qualified Being L4 it is cancelled |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Qualified Being L5 it is cancelled |
| Sl No | Description | Qty | Unit | SURESH KUMAR.M L5 | S PRADEEP L3 | SANGEETH L4 | CONCORD STRUCTURES PRIVATE LIMITED L1 | SAJI P L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00APPENDIX-A | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 145.78 | cum | 350 ₹51,023.70 | 325 ₹47,379.15 | 320 ₹46,650.24 | 264.33 ₹38,534.56 | 320 ₹46,650.24 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 145.69 | cum | 300 ₹43,707.90 | 283 ₹41,231.12 | 270 ₹39,337.11 | 230.51 ₹33,583.69 | 279 ₹40,648.35 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 28.91 | cum | 7,840 ₹2.3 L | 7,461 ₹2.2 L | 8,000 ₹2.3 L | 6,065.35 ₹1.8 L | 7,360 ₹2.1 L |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 62.46 | sqm | 385 ₹24,047.10 | 367 ₹22,922.82 | 369 ₹23,047.74 | 298.15 ₹18,622.45 | 362 ₹22,610.52 |
| 1.00 | OD75928/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work up to plinth level. (Note: Excess/Less cement is not payable or recoverable separately) | 46.05 | cum | 10,920 ₹5.0 L | 10,400 ₹4.8 L | 11,500 ₹5.3 L | 8,451.44 ₹3.9 L | 10,255 ₹4.7 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,669.07 | kilogram | 115 ₹6.5 L | 108 ₹6.1 L | 110 ₹6.2 L | 87.49 ₹5.0 L | 106 ₹6.0 L |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 312.16 | sqm | 995 ₹3.1 L | 945 ₹2.9 L | 1,000 ₹3.1 L | 768.61 ₹2.4 L | 932 ₹2.9 L |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 407.09 | sqm | 747 ₹3.0 L | 711 ₹2.9 L | 900 ₹3.7 L | 578.5 ₹2.4 L | 701 ₹2.9 L |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 363.78 | sqm | 940 ₹3.4 L | 893 ₹3.2 L | 800 ₹2.9 L | 726.24 ₹2.6 L | 881 ₹3.2 L |
Tender Value
₹80.9 L
EMD Value
₹50,000
Closing Date
28 Apr 2025, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-General Education Department Government UP School Kulasekharam- Construction of School building for Government UP School Kulasekharam Thiruvananthapuram
2025_PWD_760716_1
TR/2145/2024_5_1_1/1
Open Tender
Civil Works - Buildings
300 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
27 Apr 2026
19 Apr 2025
2 May 2025
19 Apr 2025
28 Apr 2025
19 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1237019.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.75 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
BOQ_1237019.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid