| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance M2ZX4 OPP DUKES PEPSI COMPANY WAMAN TUKARAM PATIL MARG AMAR NAGAR CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 Cr+₹28.7 L (13.6%)Admitted-Finance A 27 NAVBHARAT APARTMENT R C MARG CHEMBUR MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | ₹2.4 Cr+₹28.7 L (13.6%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Continent Engineers L1 | Jyotsna Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Old STP Plant: Cleaning of fine bar mat screens (2 nos.) | 576 | per Frequency | 182 ₹1,04,832 Lowest | 195 ₹1,12,320 |
| 2.00 | Old STP Plant: Ferrying of chemicals from chemical godown to chemical house | 720 | per Frequency | 182 ₹1,31,040 Lowest | 195 ₹1,40,400 |
| 3.00 | Old STP Plant: Preparation of alum solution from alum lumps and SMBS solution from SMBS powder | 720 | per Frequency | 182 ₹1,31,040 Lowest | 195 ₹1,40,400 |
| 4.00 | Old STP Plant: Cleaning of aerator impellers (12 nos.) | 576 | per Frequency | 182 ₹1,04,832 Lowest | 195 ₹1,12,320 |
| 5.00 | Old STP Plant: Cleaning of detritors (2 nos.) | 192 | per Frequency | 495 ₹95,040 Lowest | 550 ₹1,05,600 |
| 6.00 | Old STP Plant: Cleaning of secondary clarifier recycle pumps (4 nos.) | 1,440 | per Frequency | 182 ₹2,62,080 Lowest | 195 ₹2,80,800 |
| 7.00 | Old STP Plant: Cleaning of screens at inlet to high rate clarifiers (2 nos.) | 720 | per Frequency | 182 ₹1,31,040 Lowest | 195 ₹1,40,400 |
| 8.00 | Old STP Plant: Cleaning of suction strainers on backwash recycle pumps (2 nos.) | 288 | per Frequency | 280 ₹80,640 Lowest | 310 ₹89,280 |
| 9.00 | Old STP Plant: Cleaning of thickener drain line and distribution channels in sludge drying beds | 96 | per Frequency | 1,480 ₹1,42,080 Lowest | 1,640 ₹1,57,440 |
| 10.00 | Old STP Plant: Removal of dead biomass from 2 nos. of secondary clarifier feed buckets and algae from launders | 576 | per Frequency | 226 ₹1,30,176 Lowest | 250 ₹1,44,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
14 Jul 2022, 10:00 amClosed
DGM CC AND PHS
ROOM NO.37 ADMIN BUILDING
Biennial rate contract for carrying out periodic cleaning of various equipment, shutdown related cleaning and other miscellaneous jobs in STP-1, STP-2 and Ghatkopar Pumping Station.
2022_RCFL_696530_1
ET-CC/TS/STPGP/197/L/2223/509
Open Tender
Miscellaneous Services
Lump-sum
730 days
RCF TROMBAY
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹1 L
Yes
1 Aug 2022
23 Jun 2022
14 Jul 2022
23 Jun 2022
14 Jul 2022
23 Jun 2022
Amount
Old STP Plant: Cleaning of fine bar mat screens (2 nos.)
Old STP Plant: Ferrying of chemicals from chemical godown to chemical house
Old STP Plant: Preparation of alum solution from alum lumps and SMBS solution from SMBS powder
Old STP Plant: Cleaning of aerator impellers (12 nos.)
Old STP Plant: Cleaning of detritors (2 nos.)
Old STP Plant: Cleaning of secondary clarifier recycle pumps (4 nos.)
Old STP Plant: Cleaning of screens at inlet to high rate clarifiers (2 nos.)
Old STP Plant: Cleaning of suction strainers on backwash recycle pumps (2 nos.)
Old STP Plant: Cleaning of thickener drain line and distribution channels in sludge drying beds
Old STP Plant: Removal of dead biomass from 2 nos. of secondary clarifier feed buckets and algae from launders
Old STP Plant: Cleaning of all bar screens installed in old and new wet well at Ghatkopar pumping station
GPS/New GPS: Cleaning of toilet, MCC room, Control Rooms and front enclosure at Old and New GPS and other miscellaneous jobs
GPS/New GPS: Cleaning of wet well at Ghatkopar Old and New Pumping Station
GPS/New GPS:Removing of sewage transfer pump from old and new wet well and cleaning of pump/impeller and placing back in old & new wet well
Old STP Plant & GPS/NEW GPS:Cleaning of Stilling chamber
Old STP Plant & GPS/NEW GPS:Cleaning of Bar screen and cleaning of detriator area(South/North)
Old STP Plant & GPS/NEW GPS:Cleaning of Aeration tank launder
Old STP Plant & GPS/NEW GPS:Cleaning of secondary clarifier
Old STP Plant & GPS/NEW GPS:Cleaning of HRC
Old STP Plant & GPS/NEW GPS:Cleaning of Dual media sand filter
Old STP Plant & GPS/NEW GPS:Cleaning of intermediate storage tank.
Old STP Plant & GPS/NEW GPS:Cleaning of dirty backwash tank.
Old STP Plant & GPS/NEW GPS:Cleaning of final storage tank of capacity 9,300 m3.
Old STP Plant & GPS/NEW GPS:Cleaning of Rapid Gravity Sand Filter
Old STP Plant & GPS/NEW GPS:Cleaning of sludge beds
Old STP Plant & GPS/NEW GPS:Supply of diesel operated de-watering pump (on 8 hrs shift basis)
Old STP Plant & GPS/NEW GPS:Cleaning of Chemical preparation tanks
Old STP Plant & GPS/NEW GPS:Cleaning of Solar Panel
STP-1-Drain/Channel Cleaning: a) Road to aeration tank inlet chamber and from east side of aeration tank to east side of FST.
STP-1-Drain/Channel Cleaning: b) Secondary clarifier (W) to thickener.
STP-1-Drain/Channel Cleaning: c) Mechanical workshop via instrument welfare to parking shed.
STP-1-Drain/Channel Cleaning: d) Transformer to chemical house west side
STP-1-Drain/Channel Cleaning: e) Chemical house east side drain going to RGSF blower.
STP-1-Drain/Channel Cleaning: f) Aeration tank (W) side to chemical house
STP-1-Drain/Channel Cleaning: g) Chemical house west side to STP office building backside up to DMF area
STP-1-Drain/Channel Cleaning: h) STP Office Building east and front side along FST West side up to ETP
New STP Plant:Cleaning of Stilling Chamber
New STP Plant:*Greasing/Oiling of Grit Classifier (East) & (West) and Grease Nipple replacement, if required.
New STP Plant:New STP:Detritors (East) & (West) Oil make up & greasing to chain
New STP:Cleaning of Detritors Chamber (East) & (West)
New STP Plant:Cleaning of 6 mm Bar Screen (East) & (West)
New STP Plant:Cleaning of 2 mm Bar Screen (East) & (West)
New STP Plant:Cleaning of Pre-anoxic Splitter Box
New STP Plant:Cleaning of Post-anoxic Splitter Box
New STP Plant:Cleaning of Membrane Tank Splitter Box
New STP Plant:Pre-anoxic open Tank 1500 m3 (East) & (West) (Each) cleaning
New STP Plant:Cleaning of open Aeration Tank (East) & (West) 2500 m3 (Each)
New STP Plant:**Cleaning of Air Diffusers in Aeration Tank (East) & (West) along with replacement of Air Diffusers if required.
New STP Plant:Post-anoxic open Tank 375 m3 (East) & (West) (Each) cleaning
New STP Plant:Oil make up/replacement from oil drum to Process Air Blowers 6 Nos. on ground floor, Membrane Blowers 7 Nos. on upstairs & Mixing Blowers 2 Nos. on ground floor. Total 15 Nos of Blowers.
New STP Plant:Lubrication (oiling/greasing) of all pumps including RO & MBR section 38 Nos.
New STP Plant:Floating scum/foam removal from Splitter box of Pre-anoxic tank to MBR tank.
New STP Plant:Candle replacement of Cartridge Filter Vessels 6 Nos.
New STP Plant:Lubrication of Centrifuge Decanters 2 Nos.
New STP Plant:Suction filter cleaning of Degasser Blowers 3 Nos.
New STP Plant:Lubrication/greasing of Degasser Blowers 3 Nos.
New STP Plant:Strainer cleaning & lubrication of all dosing pumps 20 Nos.
New STP Plant:Greasing to all valves including Sluice Gate, MOV etc. of 44 Nos.
New STP Plant:Greasing to all pump related valves including RAS pumps, WAS pumps, Drain pumps etc. of 49 Nos.
New STP Plant:Bearing Greasing of Absorption Tower Blowers 2Nos.
New STP Plant:Cleaning of Intermediate Storage Tank (IST) 1750 m3 (East) & (West)
New STP Plant:Cleaning of Final Storage Tank (FST) 7500 m3 (East) & (West)
New STP Plant:Transportation of SMBS (Sodium meta bi- sulphide) Solid in 25 kg Bag from Chemical Godown to RO Chemical house (Ground floor) and preparation of SMBS solution in tank of 500 litres.
New STP Plant:Transportation of Antiscalant (Liquid) in 25 kg Barrel from Chemical Godown to RO Chemical house (Ground floor) and preparation of Antiscalant solution in tank of 500 litres.
New STP Plant:Transportation of Citric Acid (Solid) in 25 kg Bag from Chemical Godown to MBR Chemical house (Upstairs) and preparation of Citric Acid solution in tank of 500 litres.
New STP Plant:Transportation of Sodium Hypochlorite (Liquid) in 50 kg Barrel from Chemical Godown to MBR Chemical house (Upstairs) and preparation of Sodium Hypochlorite solution in tank of 1000 litres.
New STP Plant:Transportation of Acrylic Polymer (Solid) in 25 kg Bag from Chemical Godown to Polymer Solution Tank (Ground Floor) and preparation of Polymer solution in tank of 1100 litres.
New STP Plant:Cleaning of Filter element/Screen 37 Nos. includes,Process Air Blowers – 12 Nos.MBR Air Blower - 14 Nos.Mixing blower – 4 Nos.Degasifier Blower – 3 Nos.Instrument Air Compressor – 4
New STP Plant:Lubrication/Greasing of Chains & Gear Boxes of Central Drive system of Thickener 2 Nos. chain & 3 Nos. Gear Boxes (Upstairs)
New STP Plant:Drain Channel Cleaning:Around Stilling chamber, Aeration, MBR, MBR House, MCC, Chemical House Thickener etc. (595 Running Meter)
New STP Plant:Drain Channel Cleaning:All the surrounding area around IST, FST & Admin Building etc (455 running meter)
New STP Plant:Complete cleaning of New Wet well At GPS
New STP Plant:Cleaning of MBR cassette
Jyotsna Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .