| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed with sufficient security deposit successfully | |
| 2 | Rejected-Technical ARADHANA KOLAM PANMANA P O KOLLAM | KOLLAM | KERALA | 689694 | - | Rejected-Technical L3- quoted rate is higher than L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4- quoted rate is higher than L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical L2- quoted rate is higher than L1 |
Tender Value
₹12.7 L
EMD Value
₹31,737
Closing Date
21 Nov 2022, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Minor Irrigation Sub Division Opp Museum Oservatory Hills Thiruvananthapuram 695033
Improvements of existing thodu ramp and construction of shutter system across Mudavanmugal RBI quarters thodu in Nemom LA Constituency
2022_Irrig_528047_1
02/AEE-MI/TVM/2022-2023
Open Tender
Civil Works - Water Works
Item Rate
150 days
near Mudavanmugal RBI quarters
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹31,737
Yes
3 May 2023
11 Nov 2022
25 Nov 2022
12 Nov 2022
21 Nov 2022
12 Nov 2022
12 Nov 2022 - 21 Nov 2022
Amount
Improvements to thodu
OD20983/2022-2023:Earth work excavation/ removal of accumulated or deposited silt ,clay, mud, night soil etc in or under water from the thodu by mechanical means/ over areas exceeding 30 cm in depth, 1.50 mtr in width as well as 10 sqm in plan including disposal of the removed earth in contractors own risk and place of choice without causing hazard to environment with all lead and lift lead and lift as per the direction of engineer in charge- For all kind of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD14494/2022-2023:Engaging labour for removing solid wastes, clearing waste and silt/clay from under side of slabs and for conveying waste from thodu to nearby road and labour for capping of unauthorized drainage lines to thodu etc
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
OD14712/2022-2023:Fabricating and supplying and erecting screw gear shutter of size 2.1*2.70*0.075 with Mild steel plate 6 mm thick 2nos 2.1* 2.70 m2 = 11.34 m2 and add 5% wastages = 0.567 m2 = Total - 11.907 m2 @ 47.10kg/ m2 = 560.82 kg. framed with MS angles and flats duly welded together as channel and bracing with necessary screw gear shaft threaded for lifting arrangement and painting with anticorrosive paint etc complete as per the direction of departmental officers at site
13.55.2:Painting (two or more coats) on rain water, soil, waste and vent pipes and fittings with black anticorrosive bitumastic paint of approved brand and manufacture, over and including a priming of ready mixed zinc chromate yellow primer on new work:150 mm diameter pipes
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
sasidharan.t
P.T.JAYARAJ
S.R.SATHYASEELAN
Bidder Name
S.R.SATHYASEELAN
sasidharan.t
P.T.JAYARAJ
KRISHNAN KUTTY S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .