| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹33.1 LAccepted-Finance | ₹33.1 L | H1 | Accepted-Finance Responsive |
| 2 | H2₹28.6 L−₹4.5 L (13.6%)Rejected-Finance 14 C ARAWALI ENCLAVE GMS ROAD GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹28.6 L−₹4.5 L (13.6%) | H2 | Rejected-Finance Non Responsive |
| 3 | H3₹1.5 Cr+₹1.2 Cr (367.1%)Rejected-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | ₹1.5 Cr+₹1.2 Cr (367.1%) | H3 | Rejected-Finance Non Responsive |
| 4 | H4₹1.3 Cr+₹92.9 L (280.8%)Rejected-Finance 501 5TH FLOOR PLOT NO 67 PUJIT PLAZA PALM BEACH ROAD SECTOR 11 CBD BELAPUR NAVI MUMBAI 400614 MAHARASHTRA | NAVI MUMBAI | THANE | MAHARASHTRA | 400614 | ₹1.3 Cr+₹92.9 L (280.8%) | H4 | Rejected-Finance Non Responsive |
| 5 | H5₹2.0 Cr+₹1.6 Cr (497.9%)Rejected-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹2.0 Cr+₹1.6 Cr (497.9%) | H5 | Rejected-Finance Non Responsive |
Tender Value
Refer Docs
Closing Date
19 Feb 2020, 11:00 amClosed
Chief Engineer (NH) Shimla
Chief Engineer NH HP PWD Shimla
Consultancy services for feasibility study and preparation of Detailed Project Report for Construction of R.O.B. in lieu of existing Railway crossing at Km 20.690 on NH-503A (near Una Town) in the State of Himachal Pradesh
2020_MoRTH_536652_1
PW-CE-NH-CTR-Tender Notice/Consultancy/19-7031-38
Open Tender
Consultancy
Item Rate
300 days
UNA
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
RPAO Chandigarh
Exempted
Chief Engineer NH HP PWD Shimla
13 Apr 2020
16 Jan 2020
20 Feb 2020
16 Jan 2020
19 Feb 2020
27 Jan 2020
16 Jan 2020 - 27 Jan 2020
27 Jan 2020
Amount
Remuneration for Local Staff (inclusive of per diem allowance)
Team Leader cum Senior Bridge Engineer
Bridge Structural Engineer
Highway cum Pavement Engineer
Material cum GeoTechnical Engineer cum Geologist
Senior Survey Engineer
Senior Geologist
Environment Specialist
Quantity Surveyor/Documentation Expert
Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Position
Position
Position
Position
Position
Position
Position
Support Staff (inclusive of per diem allowance) Note: To be assessed by consultant as per requirement of assignment
Office Manager
Typist
Office Boy
Night Watchman
Transportation (Fixed Costs)
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
Duty Travel to Site (Fixed Costs)
Trips
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
Office Rent
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (3 copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report& RAP
Final Environmental Assessment report& RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Document
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)
LA & Clearances II Report
Survey and Investigation A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Investigation (Fixed cost)(lumpsum)
Road and Bridge Inventory
FWD Test And Pavement Evaluation
Roughness Survey
Axle load Survey
Material Survey and Investigation
Sub grade Investuigation
Traffic Survey
Socio economic and Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Sub-Soil Investigation (Boring) (Rate/m)
a) In soil other than hard rock
b) In hard rock
Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval
Land Acquisition Team including support staff and logistics/transportation
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist (2 nos.)
Logistics for Land acquisition Team
Computer including necessary peripherals (2 nos.)
Printers (2 nos.)
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Position (Value= 0)
Moblization and Demoblization-Inland Travel in Home country (Fixed Costs)
Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)
Jindals Consortium
Dhruv Consultancy Services Limited
Geo Designs and Reserch Pvt. Ltd.
RITES Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .