Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC ERATTUPETTA BLOCK PANCHAYATH KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.6 L+₹81,696.22 (6.94%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.7 L+₹1.9 L (16.3%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹14.4 L
EMD Value
₹35,999
Closing Date
11 Jul 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o Executive Engineer, Irrigation Division Kottayam
GENERAL-Side protection-Protecting the eroded left bank of Meenachil river near Kadappattoor temple in Ward no 6 in Mutholy Panchayath and right bank d/s of Kalariamakkal checkdam-General Civil Work
2023_Irrig_585444_1
IRR/IA/TR/7361/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Mutholy Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹35,999
Yes
26 Oct 2023
3 Jul 2023
14 Jul 2023
3 Jul 2023
11 Jul 2023
3 Jul 2023
3 Jul 2023 - 11 Jul 2023
Amount
Side protection works
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
OD7240/2023-2024:Conveyance and dumping of deptl granite stone conveyance of deptl granite stone 20 to 45 dm3 sie from stack at site and dumping in position ( 60% 45dm3, 30% 30 to 40 dm3 and 10% 20 t0 30 dm3 stone) to lines and levels as per approved design including all leads and lifts etc. complete as per the directions of the deptl. officers at site .( 60.7.7 modified only specifications)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Desilting of River
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
OD31700/2022-2023:Conveyance and dumping of deptl granite stone conveyance of deptl granite stone 20 to 45 dm3 sie from stack at site and dumping in position ( 60% 45dm3, 30% 30 to 40 dm3 and 10% 20 t0 30 dm3 stone) to lines and levels as per approved design including all leads and lifts etc. complete as per the directions of the deptl. officers at site .( 60.7.7 modified only specifications)
Sinthol Thomas
SUNNY JOSEPH
Bidder Name
SUNNY JOSEPH
Sinthol Thomas
Denny Jose
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_865133.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .