Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹40,478
Closing Date
12 Feb 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard Naval Base Karwar 581308
UNDERTAKING OVERHAULING OF AFT MAIN VENT SYSTEM ONBOARD IN SUBMARINE
2024_NAVY_640992_1
REG/KALVARI/AFT MAIN VENT SYSTEM
Limited
Marine Services
Item Rate
90 days
NAVAL SHIP REPAIR YARD, NAVAL BASE, KARWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,478
Yes
13 Feb 2024
6 Feb 2024
13 Feb 2024
6 Feb 2024
12 Feb 2024
7 Feb 2024
Amount
Removal of jack. Job involves following:-
Removal of screws
Discard the washers
Retrieve the stop plate
Drift the axis
Retrieve the stop washers, the rings will be disassembled according to the result of the parts survey, Dimensional inspection
Removal of nuts
Removal of jack from the frame
Jack disassembly. Job involves following:-
Removal of nuts
Discard the lock washers
Fit 02 M8 screws in the 02 M8 holes machined on the jack cylinder
Removal of jack cylinders
Removal of piston ring & piston
Remove the jack base by means of 02 M6 screws in the 02 M6 holes
Remove aft bearing by means of 02 M5 screws in the 02 M5 holes
Extract the screws and remove the cover by means of 02 M8 screws screwed in the 02 M8 holes
Move the piston rod out by means of the jack eye
Undo the jack eye fitted out with the ring. The ring will be disassembled as per the result of the parts survey
Removal of valves. Job involves following:-
Set the blanking device to open position
Loosen the nut
Separate the ball joint from the operating arm
Removal of screws
Removal of valve seat
Removal of cover
Extract the half seats
Removal of valve boxes. Job involves following:-
Fit shims bearing under the valve box
Removal of nuts
Extract the screws
Extract the big positioning axis
Extract the small positioning axis
Remove the valve box
Retrieve the adjusting shim
Removal of arm connecting rods, internal piston connecting rod and external piston connecting rod. Job involves following:-
Remove the screws
Retrieve the stop plates
Drift the axis
Removal of levers. Job involves following:-
Undo the nuts
Removal of screws
Removal of operating arms and spring holding arms. Job involves following:-
By means of threaded rod of 10 mm in diameter, 02 M10 plain washers and 02 HM 10 nuts, load slightly the spring
Removal of screws
Retrieve the stop plate and grounding connection
Drift the arm driving axis
Undo progressively HM 10 nuts to unload the spring
Loosen the nuts
Removal of screws
Retrieve the stop plate and the spacers
Drift the valve axis
Remove the operating arm and the spring-holder arm fitted out with rings. The rings will be disassembled as per the result of the parts survey
Retrieve the stop washers
Jack test up to 250 bar. Job involves following: -
Apply pressure through A1 port
Check the leakage rate through A2 port (max. leakage rate permitted 100cm3/min)
Apply pressure through A2 port
Check the leakage rate through A1 and U ports (max. leakage rate permitted 100cm3/min for each port)
Apply pressure through U port
Check there is no leakage to the jack outside
Leak test on the chambers of the hydraulic dashpot. Job involves following: -
Blank one of the two orifices on the dashpot
Connect the second orifice to the pressurizing device
Check there is no pressure drop
Operation test on chambers of the hydraulic dashpot. Job involves following: -
Set A1 port to pressure
Check that the piston rod extends
Set A2 port to pressure
Check the piston rod retracts
Double valve test. Job involves following: -
Set the valves to closed position, the blanking devices resting on the valve seats
Fit out the flanges of the valve boxes with a test plug fitted out with an adapter for connection to the pressurizing device
Set the valve boxes to pressure
Isolate the pressurizing circuit
Check tightness of blanking devices, make sure there is no pressure drop or leakage at the level gasket.
Check the arm setting by means of a rod
M/s shiva Marine Service
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .