| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC LOWEST ACCEPTED |
| 2 | L2₹2.5 Cr+₹15.5 L (6.57%)Rejected-Finance THRISSUR CORPORATION THRISSUR | THRISSUR | KERALA | 679105 | ₹2.5 Cr+₹15.5 L (6.57%) | L2 | Rejected-Finance 2nd lowest |
| 3 | L3₹2.6 Cr+₹24.8 L (10.5%)Rejected-Finance | ₹2.6 Cr+₹24.8 L (10.5%) | L3 | Rejected-Finance 3rd lowest |
| 4 | L4₹2.6 Cr+₹24.9 L (10.6%)Rejected-Finance | ₹2.6 Cr+₹24.9 L (10.6%) | L4 | Rejected-Finance 4th lowest |
| 5 | L5₹2.7 Cr+₹35.6 L (15.1%)Rejected-Finance | ₹2.7 Cr+₹35.6 L (15.1%) | L5 | Rejected-Finance 5th lowest |
Tender Value
₹2.4 Cr
EMD Value
₹1 L
Closing Date
19 Jul 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, KWA, P H Circle, Thrissur
Jal Jeevan Mission (JJM) - Jal Jeevan Mission - Phase II - 2022 - 2023 - WSS to Kadangode Panchayath - Construction of 14.50 LL GLSR - General Civil Work
2023_KWA_586687_1
60/SE/PHC/TSR/2023-24
Open Tender
Civil Works - Water Works
Item Rate
300 days
Kadangode Panchayath
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,850
₹1 L
1 Nov 2023
7 Jul 2023
20 Jul 2023
7 Jul 2023
19 Jul 2023
7 Jul 2023
Amount
Construction of 14.50 LL GLSR at Kadangode Grama Panchayath-Cost of materials
OD27811/2022-2023:Supplying 600 mm DI - K9 flanged pipe
OD27967/2022-2023:Supplying 300 mm DI K9 Flanged pipe
OD256981/2022-2023:Supplying 200 mm DI double flanged pipe
100.98.124:Supply of DI K9 Pipe Conforming to IS 8329/2000, 600mm Dia.
100.98.468:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 600mm.
100.98.487:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Hand Wheel PN 1.6, Size 300mm.
100.98.485:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Hand Wheel PN 1.6, Size 200mm.
OD28368/2022-2023:Supply of Ductile iron specials suitable for mechanical jointing as per IS 9523 upto 600mm dia
OD257168/2022-2023:"Supplying an electro- magnetic fiow meter conforming to protection level of IP-68 far Flow Sensor and<br>IP- 67 for transmitter, and having an<br>accuracy level of 0.5% with LED/LCD Display unit. The flow meter should have the housing (flow sensor)<br>to be made of SS 304/ carbon Steel with anti -corrosive protection and inside liner to be made up of Hard<br>Rubber / neoprene all confirming to drinking water standards. The.flow meter should be coupled with<br>HART for data acquisition and transfer, with provision.for wireless transfer through GSM . The<br>manufacturers should have the calibration standards as per ISO 17025 and the product shall have<br>sufficient warranty provisions.',<br>Note- The rate provided is Exclusive of Taxes,Transportation, Insurance etc. A provision of 15% extra for the same may be provided in estimate.<br>The technical specification of Electro- Magnetic Flow meter is as given below. For flow meters upto<br>250mm size( size of pumping main in cornmon header) mechanical Flow meter certified by FCRI-Palakkad shall be used. As the rates are local market rates, no CP is allowed as per rules.<br>Size of Electro-Magnetic Flow Meter - 600mm
Construction of 14.50LL GLSR -Working charges
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.11.1:Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
OD29038/2022-2023:12 mm cement plaster finished with a floating coat of cement of mix 1:3 (1 cement : 3 sand) for inside of OH tank -adding 2% water proofing compound
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
OD8455/2023-2024:Providing suitable sizeventilating arrangements by using 100mm GI vent cowls as per the direction of departmental officers.
OD29314/2022-2023:Conveying and fixing wall casting pipe in the RCC slab of tank and sump as per the direction of<br>departmental officers
100.41.34:Supplying and fixing Rectangular C.I. manhole cover 455mm x 610mm with frame (low duty) charges including all cost, labour charges etc., complete.
100.15.10:Conveying and laying Double Flanged (Screwed / Welded) Centrifugally (Spun) Ductile Iron Pipes of Class K-9 conforming to IS: 8329, excluding cost of pipe and specials: 600mm diameter Ductile Iron Double Flanged pipes.
100.15.5:Conveying and laying Double Flanged (Screwed / Welded) Centrifugally (Spun) Ductile Iron Pipes of Class K-9 conforming to IS: 8329, excluding cost of pipe and specials: 300mm diameter Ductile Iron Double Flanged pipes.
100.15.3:Conveying and laying Double Flanged (Screwed / Welded) Centrifugally (Spun) Ductile Iron Pipes of Class K-9 conforming to IS: 8329, excluding cost of pipe and specials: 200mm diameter Ductile Iron Double Flanged pipes.
100.14.10:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 600mm diameter Ductile Iron Class K-9 Pipes.
18.24:Laying in position S & S or flanged C.I. special such as tees, bends, collars, tapers and caps etc. ( excluding cost of specials).
18.30.5:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:200 mm diameter pipe
18.30.7:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:300 mm diameter pipe
18.30.12:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:600 mm diameter pipe
18.70.10:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:600 mm dia pipes
100.31.2.12:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 600mm diameter, Class II.
100.31.2.5:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 200mm diameter, Class II.
100.31.2.7:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 300mm diameter, Class II.
5.9.15:Centering and shuttering including strutting, etc. and removal of form for:Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
100.36.1:Filling water with 5000 litre tankers fited in lorry and conveying water from a distance of 5 km (average) to the reservoir site and pumping the water into the reservoir of height not less than 3 m using 5 HP diesel engine pump set , hire for tanker lorry, tools and other appliences and cost of water etc. complete.
13.71:Lettering with black Japan pint of approved brand and manufacture
OD29435/2022-2023:Supplying and fixing Mechanical water level indicators- Fabricating and fixing water level indicator with MS angle iron outer board frame and using 8mm steel sheet for indicating scale straightening ,cutting, welding with outer frame and hosting including applying a coat of iron primer and painting the letters marking the scale indicating measurements maintain proportional height of water level in tank with paints and fixing on the outer side of the side wall /piller with necessary nut and bolt and arranging the indicating scale with plastic rope and pully with PVC /Rubber floating arrangements in required boyancy weight indicating the water level of the the tank upwards or downwards without any displacement and changing of level etc. complete asper the direction of the departmental officers.
OD257927/2022-2023:Providing lightening arrester as per ISI standards
OD29608/2022-2023:Installation of flow meter in the existing water supply system including conveying, Laying, Jointing oof 5D,3D pipe fittings, Dismantling joint etc complete including cost of jointing materials.
OD29607/2022-2023:Supply of errection of stainless steel metal box for housing the transmitter and battery of electro Magnetic flow meter of size 500x500x1000 mm with adjustable partition. locking arrangements for fixing it in the platform.
Construction of Valve chamber of 14.50LL GLSR
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Construction of R.C.C Retaining Wall
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Construction of Compound wall at GLSR site
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
OD258329/2022-2023:Dry Rubble Masonry with Hardstone in foundation and superstructre including levelling up with cement concrete 1:6:12 (1 Cement :6 Coarse sand :12 graded stone aggregate 20mm Nominal size) including cost of materials and Labour charges
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
DONSON N.A
Horizia Construction(india)pvt ltd
SANTHOSH JACK
SHAFEEL KP
Bidder Name
SANTHOSH JACK
jmj constructions
DONSON N.A
Horizia Construction(india)pvt ltd
SHAFEEL KP
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_867264.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .