Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | -14.99% | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L1₹2.8 CrAdmitted-Finance GROUND FLOOR SURAJ APPARTMENT STATION ROAD PARMANANDPUR PO BHAWANIPATNA DIST KALAHANDI ODISHA 766001 | BHAWANIPATNA | KALAHANDI | ODISHA | 766001 | -14.99% | ₹2.8 Cr | L1 | Admitted-Finance |
| 3 | L1₹2.8 CrAdmitted-Finance | -14.99% | ₹2.8 Cr | L1 | Admitted-Finance |
| 4 | L1₹2.8 CrAdmitted-Finance AT PO BANGOMURDA DIST BALANGIR ODISHA | BANGOMURDA | BALANGIR | ODISHA | -14.99% | ₹2.8 Cr | L1 | Admitted-Finance |
| 5 | L1₹2.8 CrAdmitted-Finance | -14.99% | ₹2.8 Cr | L1 | Admitted-Finance |
Tender Value
₹3.3 Cr
Closing Date
25 May 2022, 5:00 pmClosed
Chief Construction Engineer
O/O THE C.C.E.R.W.CIRCLE, BHAWANIPATNA
Construction of bridge over Sukuri Nallah at 1st Km. on Mota Nuapada to Powertola road in the District of Nuapada under Biju Setu Yojana
2022_CERWI_77521_1
BPT/ONLINE-04/2022-23
National Competitive Bid
Civil Works - Bridges
Percentage
540 days
Nuapada/Nuapada
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Exempted
17 Jun 2022
9 May 2022
26 May 2022
9 May 2022
25 May 2022
9 May 2022
9 May 2022 - 24 May 2022
eProcurement System Government of Odisha Created By: K. VARA PRASAD RAO Created Date/Time: 17-Jun-2022 12:22 PM Tender Title: Construction of bridge over Sukuri Nallah at 1st Km. on Mota Nuapada to Powertola road in the District of Nuapada under Biju Setu Yojana Tender ID: 2022_CERWI_77521_1
Tender Inviting Authority: Chief Construction Engineer, Rural Works Circle,Bhawanipatna
Name of Work: Construction of prposed Bridge over Sukari Nallah at 1st Km on Mota Nuapada to Powertola Road in the district of Nuapada.
Contract No: BPT/Online-04/2022-23
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Sachin Agarwal(GSTN-21ARRPA3226G1Z9) 33012579.11 -14.99 28063993.50 Two Crore Eighty Lakh Sixty Three Thousand Nine Hundred and Ninty Three
2.00 GOPAL CHANDRA SAHU(GSTN-21AHUPS3979D1ZV) 33012579.11 -14.99 28063993.50 Two Crore Eighty Lakh Sixty Three Thousand Nine Hundred and Ninty Three
3.00 DEMANTI AGRAWAL(GSTN-21AGQPA3468C1ZT) 33012579.11 -14.99 28063993.50 Two Crore Eighty Lakh Sixty Three Thousand Nine Hundred and Ninty Three
4.00 UMA SHANKAR SAHU(GSTN-21AHUPS4017J1Z3) 33012579.11 -14.99 28063993.50 Two Crore Eighty Lakh Sixty Three Thousand Nine Hundred and Ninty Three
5.00 SUDHIR KUMAR PANDA(GSTN-21AEKPP4480R1ZV) 33012579.11 -14.99 28063993.50 Two Crore Eighty Lakh Sixty Three Thousand Nine Hundred and Ninty Three
6.00 SHREE GANESHJEE CONSTRUCTION(GSTN-NA) 33012579.11 -10.50 29546258.30 Two Crore Ninty Five Lakh Fourty Six Thousand Two Hundred and Fifty Eight
7.00 BIJAY KUMAR SAHU(GSTN-NA) 33012579.11 -14.99 28063993.50 Two Crore Eighty Lakh Sixty Three Thousand Nine Hundred and Ninty Three
Lowest Amount Quoted BY: Sachin Agarwal,BIJAY KUMAR SAHU,GOPAL CHANDRA SAHU,SUDHIR KUMAR PANDA,UMA SHANKAR SAHU,DEMANTI AGRAWAL(28063993.50)
BOQ Summary Details Tender Title: Construction of bridge over Sukuri Nallah at 1st Km. on Mota Nuapada to Powertola road in the District of Nuapada under Biju Setu Yojana Tender ID: 2022_CERWI_77521_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 DEMANTI AGRAWAL 28063993.50 L1
2 BIJAY KUMAR SAHU 28063993.50 L1
3 GOPAL CHANDRA SAHU 28063993.50 L1
4 Sachin Agarwal 28063993.50 L1
5 SUDHIR KUMAR PANDA 28063993.50 L1
6 UMA SHANKAR SAHU 28063993.50 L1
7 SHREE GANESHJEE CONSTRUCTION 29546258.30 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .