EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
Construction of Public Toilet near Masjid Sharif Latipora under ADP (PRI) for year 2026-27, Panchyat HalqaMamoosa B, Block Lalpora
2026_RDPR_315542_15
96/Xen/Rew/Bla/2026-27 Dated 11/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,280
11 Jul 2026
11 Jul 2026
28 Jul 2026
11 Jul 2026
27 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechenical means in trenches for foundation (Not exceeding 1.5m in width), depth upto 1.5m incl. disposal of excavated earth upto 1m from cutting edge. (All Kinds of Soil) | 13.95 | cum | - | - |
| 2 | Providing & Laying of Dry stone soling hand packed and plum in concrete | 1.84 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2 | cum | 1 | ₹2 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand) upto plinth lvl | 7.25 | cum | - | - |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 5.57 | cum | - | - |
| 6 | P/F of mild steel door/window frame and shutter complete job incl. Prime coat and painting | 60 | kg | 1 | ₹59.94 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | 23.99 | sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases of columns etc. for mass concrete. | 6.27 | sqm | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.8 | cum | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 180 | kg | 1 | ₹179.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1024267.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].