Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹44.6 L
EMD Value
₹89,198
Closing Date
25 May 2026, 3:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction of a concrete road in Ward-26, Partapur Jeevan Sahay, from Faizan Chicken Shop/Babu Khan, via Gausia Mosque and Shakirs house, to Hasnain and Misriyars houses.
2026_DOLBU_1148538_1
213/PA/NCAP/NN/2026-27 (1 to 13) Sr. No. 10 Date-13.05.2026
Open Tender
Civil Works
Percentage
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,263
Bareillye-tender.com
₹89,198
18 Jun 2026
15 May 2026
25 May 2026
15 May 2026
25 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697) | 119.39 | CUM | 70 | ₹8,357.3 |
| 1.02 | Dismantling of old damaged B.O.E. soling and Interlocking tiles stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1) | 994.91 | SQM | 12 | ₹11,938.92 |
| 1.03 | Disposal of surplus earth upto 5 km | 0.8 | CUM | 183.5 | ₹146.62 |
| 1.04 | First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work. | 45.44 | CUM | 5,350 | ₹2,43,104 |
| 1.05 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in lighter beam excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. | 0.6 | CUM | 8,685 | ₹5,210.13 |
| 1.06 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as directed by E/I. | - | qtl | 8,870 | - |
| 1.07 | Earth work for filling or embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge. (Excluding Royalty) Analysis rate | 65.29 | CUM | 346.27 | ₹22,607.97 |
| 1.08 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i) | 395.16 | SQM | 210 | ₹82,983.6 |
| 1.09 | Construction of Granular sub (G.S.B.) by providing, laying, spreding and compacting speciffied graded crushed stone in sub base coarse including premixing the materials at O.M.C. in mechanical mixer (Plug Mill) including carriage of mixed msterials, laying in uniform layers with power roller to achieve the desired density including all materials, labour, machinery, lighting gaurding, barricading and maintance of diversion complete of as per MoRT & HT technical specification clause No. 404B. | 198.98 | CUM | 4,059 | ₹8,07,659.82 |
| 1.1 | P/L of 125 micron Plastic Sheet | 1,989.82 | SQM | 20 | ₹39,796.4 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 27.27 MB
BOQ_2149875.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .