Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.5 L+₹50,283.50 (16.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.5 L+₹53,280.14 (17.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.6 L+₹57,535.35 (19.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.6 L+₹58,734.01 (19.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹11,980
Closing Date
20 Jul 2026, 4:00 pmClosed
EXECUTIVE ENGINEER RNB DIVISION URI
EXECUTIVE ENGINEER RNB DIVISION URI
Protection work on Salamabad link road near H/o Naseer Ah Moon.
2026_PWDJK_315511_6
enit No 30 of 2026-27
Open Tender
Civil Works
Percentage
30 days
URI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
EXECUTIVE ENGINEER RNB DIVISION URI
₹11,980
Yes
23 Jul 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | Cum | 187.3 | ₹187.11 |
| 2 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry | - | Cum | 7,677.35 | - |
| 3 | Labour forRandom Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry stone available at Site | - | Cum | 4,606.4 | - |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 1 | Cum | 416.5 | ₹416.08 |
| 5 | Providing and filling of stone soling hand packed, including ramming, dressing and watering all complete job as per direction of Engineer Incharge at Site. | - | Cum | 1,000 | - |
| 6 | Taking of Geo Tag Photographs of size 125mmx250mm before execution, during execution and after execution of work (04 No. Each Pre, Post, After execution) to be submitted with the bill complete job. (Geo Tag Photographs showing Name of Work, Location and Longitude/ Latitude).(Pre, Post, After execution). | - | No | 100 | - |
stage.html
html • 0.05 MB
finance_1023872.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1023872.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .