Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC AT PO BHUBANESWAR LANE 4 NAYAPALLI NUASAHI WARD NO 34 DIST KHURDA ODISHA | BHUBANESWAR | KHURDA | ODISHA | L1 | Accepted-AOC Succeeded in lottery | |
| 2 | L1₹1.3 CrRejected-Finance | L1 | Rejected-Finance Not succeed in lottery | |
| 3 | Rejected-Technical | - | Rejected-Technical The work mentioned in the submitted experience certificate is not of a similar nature to the work specified in the present contract. Therefore, the bidder is not eligible as per Clause 122(b) on page 21 of the DTCN. |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
3 Oct 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PA ITDA Phulbani
ITDA Phulbani
Construction of 50 seated Primary School Hostel at Pirikudi UGHS under Khajuripada Block.
2025_STSCD_118093_1
PA ITDA PLB_03 of 2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
ITDA Phulbani
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
Yes
21 Feb 2026
17 Sept 2025
4 Oct 2025
17 Sept 2025
3 Oct 2025
17 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. | 596.43 | One Cum | 276.89 | ₹1,65,145.5 |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. | 225.14 | One Cum | 598.55 | ₹1,34,757.55 |
| 3 | CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. | 179.28 | One Cum | 5,810.54 | ₹10,41,713.61 |
| 4 | Rigid smooth centering and shuttering for Mass concrete including dismantling them after csting including all cost, conveyance, taxes of materials and labour with T&P required for the work etc. | 140.59 | One Sqm | 251.75 | ₹35,393.53 |
| 5 | Fly ash Brick Masonry in C.M. (1:6) in Superstructure using 23cm x 11cm x 8cm size fly ash Brick including watering and curing, cost, conveyance,taxes and royalties and labour require for the work etc complete.
(A) GROUND FLOOR | 145.06 | One Cum | 5,961.11 | ₹8,64,718.62 |
| 5.01 | (B) FIRST FLOOR | 129.2 | One Cum | 6,349.75 | ₹8,20,387.7 |
| 6 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. (A) GROUND FLOOR
i) Column base & Footing | 100.04 | One Cum | 7,484.41 | ₹7,48,740.38 |
| 6.01 | ii) Plinth Bend | 24.37 | One Cum | 8,365.54 | ₹2,03,868.21 |
| 6.02 | iii) Column & Beam | 44.32 | One Cum | 16,742.7 | ₹7,42,036.46 |
| 6.03 | iv) Lintel Bend | 6.72 | One Cum | 15,187.18 | ₹1,02,057.85 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
FinalDTCN03of202526Copy.pdf
Tender Document • 1.27 MB
Tendernotice_1.pdf
Tender Document • 2.17 MB
Tendernotice_2.pdf
Tender Document • 1.29 MB
BOQ_552761.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .