Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹5.9 CrAccepted-AOC | ₹5.9 Cr | H1 | Accepted-AOC H1 bidder |
| 2 | H2₹6.3 Cr+₹39.1 L (6.60%)Rejected-Finance | ₹6.3 Cr+₹39.1 L (6.60%) | H2 | Rejected-Finance Combined evaluation of Technical and Financial score |
| 3 | H3₹6.2 Cr+₹25.2 L (4.26%)Rejected-Finance | ₹6.2 Cr+₹25.2 L (4.26%) | H3 | Rejected-Finance Combined evaluation of Technical and Financial score |
| 4 | H4₹8.3 Cr+₹2.4 Cr (39.6%)Rejected-Finance | ₹8.3 Cr+₹2.4 Cr (39.6%) | H4 | Rejected-Finance Combined evaluation of Technical and Financial score |
Tender Value
₹398.9 Cr
Closing Date
17 Sept 2021, 5:00 pmClosed
CE -RO
Room N0. 508 and 509 Konkan Bhawan Navi Mumbai
Consultancy services for Authoritys Engineer for Supervision of Construction of 4 Lane Flyover at Nagpur RTO Chowk To Nagpur University Campus and 4 lane flyover at Wadi/MIDC junction from on NH 53 In State Of Maharashtra On EPC Mode.
2021_MoRTH_638121_1
RW/NH-12014/72/2020-21
Open Tender
Consultancy
Item Rate
288 days
Nagpur
RFP document from the website will be required to pay the non- refundable fee of Rs. 5,000 towards cost of RFP at the time of the submission, through the portal bharatkosh.gov.in) (receipt-document of online payment to be submitted online on eprocure
7 documents required · 7 mandatory
₹0
Exempted
Room N0. 508 and 509 Konkan Bhawan Navi Mumbai
26 Apr 2022
13 Jul 2021
20 Sept 2021
13 Jul 2021
17 Sept 2021
13 Jul 2021
6 Aug 2021
Amount
Key Personnel
Team Leader Cum Senior Bridge Engineer
Resident cum Pavement Specialist
Bridge/Structural Engineer (2 nos)
Senior Contract Specialist
Senior Quality cum Material Expert
Road Safety Expert
Sub Professional Staff
Survey Engineer
Assistant Highway Engineer(1 nos)
CAD Expert
Bridge Design Engineer
Assistant Bridge Engineer (2nos)
Assistant Quality cum Material Engineer (2 nos)
Electrical Engineer
Quantity Surveyor
Support Staff
Office Manager
Accountant cum cashier
Steno cum Computer Operator
Office Boy
Transportation (Fixed Costs) The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
Innova / Scorpio or equivalent (not more than 3 years old)
Ambassador / Indica or equivalent (not more than 3 years old)
Duty Travel to Site (Fixed Costs)
Site to MORTH HQ
Site to Regional Office for Key professionals 20 round trips (By air economy class/train first AC/ Delux AC Bus)
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
Office Rent
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)
The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Reports and Document Printing
Monthly Reports (Design and Construction)
Half yearly Reports
Various other reports as provided in the EPC Agreement such as Completion Report
Survey and Investigation A. Topographical Survey (Fixed Rate)
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Contingency (A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval form the Competent Authority in RO Mumbai / MORTH.)
SA Infrastructure Consutants Pvt. Ltd.
TPF Engineering Pvt Ltd
Bloom Companies LLC
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_671648.xls
BOQ Document • 0.30 MB
80120710.pdf
Tender Document • 0.33 MB
RTO_AE.rar
Tender Document • 13.04 MB
80120713.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .