| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.7 Cr+₹41.8 L (9.78%)Rejected-Finance | ₹4.7 Cr+₹41.8 L (9.78%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical JABALPUR | - | - | Rejected-Technical Tecnically Disqualified |
Tender Value
₹4.3 Cr
EMD Value
₹8.6 L
Closing Date
6 Sept 2023, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Construction Circle, Uttarakhand PeyJal Nigam, Almora.
Civil Work-water works
2023_MDPEY_62306_1
2521/NIVIDA QUOTATION/149, DATE 24/08/2023
Open Tender
Civil Works - Water Works
Item Rate
180 days
Block- Bhikiyasain district- Almora
Please Refer to Tender Documents
3 documents required · 3 mandatory
₹5,900
EE, Construction Division, UKPJN, Bhikiyasain.
₹8.6 L
Construction Circle, UKPJN, Almora
20 Jan 2024
26 Aug 2023
8 Sept 2023
26 Aug 2023
6 Sept 2023
28 Aug 2023
28 Aug 2023
Amount
Design Drawing and Construction of Intake Well (6 m internal dia., 15.0m height) with pump house (made up of brick masonry, 4 m height) on top of well including supply of all materials, labour, T&P etc. required for proper completion of work
Construction of R.C.C. approach bridge of 2.5 m wide and 15 m long is also to be constructed to reach over the well. including supply of all materials, labour, T&P etc. required for proper completion of work
Design, Drawing and Construction Of rapid sand gravity filtration plant of 1.90 MLD with baffled type basin and back wash water tank inc. supply of material, labour etc. Required for Proper Completion of Work
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of API-5L, Jointing by electric welding process with proper grade of eletrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.
API X-42 From Intake Well to MPS API Pipe 150 mm Dia 3.2 mm Thickness
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete
Soil mixed with boulder and bajri
Supply & fixing of following sizes of valves including carting the same up to side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect
150 mm dia sluice valve WP-30Kg /cm2
150 mm dia Check/Reflux valve WP-30Kg /cm2
C.I. Air valve (Double Acting) 80mm
Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(1.2x1.2x1.2)
Supply of all materials, labour, T & P etc. and Construction of R.C.C Anchor Block @ 50 m interval as per type design complete
Makig 2 M wide Briddle path for rising main including hill side cutting and coolie walling of all materials, labour, T & P etc.
Painting of API Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm)
150 mm dia
Protection Work
Excavation for foundation in Soil mixed with boulders
Cement concrete 1:2:4 including supply of all materials, labour, T&P etc. Complete
Random Rubble Stone Masonry in 1:6 cement and sand mortar including supply of all materials, labour, T&P etc. complete.
Random Rubble Stone Masonry laid dry including supply of all materials, labour, T&P etc. complete.
Pumping Plant for stage-I Raw water Centrifugal Raw Water Pump (1300 LPM, 40 M Head)
Electric Motor
Base Plate
Starter
125 Amps Change Over Switch
Control Panel
Power Wiring & Earthing Material
Main Piping & Valves
Gauges
Chain Pulley Block (3 Tonne capacity)
Stage-II (MPS): Centrifugal Pump Clear Water (1200 LPM, 440 M Head)
Electric Motor
Base Plate
Fully Auotomatic Auto Transformer Starter
Control Panel
Power Wiring & Earthing Material
Main Piping & Valves
Gauges
H.O.T. Crane (4 Tonne Capacity)
Tools for all stages
150 mm dia Electro Magnetic Flow water meter
Grease premium quality (High Temprature)
Heavy duty crimping tool
Rubber Resistance Sheet (1×2×0.025 M)
Transformer oil (1 Drum=209 Ltrs)
Installation & commissioning of Pumping Plants & related acceessories for all stages.
Testing (all stages) : At Works
At Site
Painting (all stages)
Carting for all stages
Maintenance (one year) (all stages)
S.I.T.C. of Transformer
(i) MPS (400 KVA)-2 Nos.
S.I.T.C. of HT Panel for MPS- 1 No.
SHIVRAJ BANAULA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .