| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC | ₹21.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.9 LRejected-Finance | ₹21.9 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S VEDANT CONSTRUCTION L1 | SHRI KRISHNA SHUKLA L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in foundation of masonry work in all type of soil including all lead and lift with disposal of earth including cost of all material labour and T& P etc. | 659.87 | Cum. | 90 ₹59,387.85 | 90 ₹59,387.85 |
| 2.00 | Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including cost of all material, labour, T & P etc. complete work. | 1 | No. | 7,700 ₹7,700 | 7,700 ₹7,700 |
| 3.00 | Earth work in making bypass channel Section & strengthning including all lead & lift; all cost of labour, T & P with manual compaction required for proper completion of work. | 2,171.78 | Cum. | 143 ₹3.1 L | 143 ₹3.1 L |
| 4.00 | Laying C.C. M-10 (1:3:6) mix. in foundation with Kabrai crused stone grit 4.75 to 40 mm size & coarse sand of F.M. not less than 2.0, including cost of all material, labour, T & P etc.required for proper completion of work. | 50.57 | Cum. | 11,600 ₹5.9 L | 11,600 ₹5.9 L |
| 5.00 | Supply & laying & fixing in position and alignment of 1200 m m dia Np-3 hume pipe, as per direction engineer-in-charge; including cost of all material, labour, T & P etc, required for proper completion of work. | 12.5 | R.M | 12,060 ₹1.5 L | 12,075 ₹1.5 L |
| 6.00 | First class brick work in 1:4 C:M with coarse sand, of F.M. not less than 2.0 including all cost of material, labour, T & P etc. required for proper complete work. | 115.48 | Cum. | 7,380 ₹8.5 L | 7,380 ₹8.5 L |
| 7.00 | First class brick work in 1:3 C:M with coarse sand of F.M. not less then 2.0, including cost of all material, labour, T & P etc. required for proper completion of work. | 7.46 | Cum. | 7,600 ₹56,658 | 7,600 ₹56,658 |
| 8.00 | Earth work in back filling in foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. complete with manual compaction of work. | 192.59 | Cum. | 74 ₹14,251.29 | 74 ₹14,251.29 |
| 9.00 | Laying C.C. M-15 (1:2:4) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0, in collar joint including all cost of material, labour T & P etc. required for proper completion of work. | 3.08 | Cum | 12,301 ₹37,923.98 | 12,301 ₹37,923.98 |
| 10.00 | Deep struck pointing in 1:2 C:M with coarse sand F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. | 119.11 | Sqm. | 180 ₹21,440.16 | 180 ₹21,440.16 |
Tender Value
₹21.9 L
EMD Value
₹43,900
Closing Date
28 Feb 2026, 3:00 pmClosed
EE Saryu Nahar Khand-1 Balrampur
EE Saryu Nahar Khand-1 Balrampur
Construction of drainage syphon at Km 5.800 of Ekauna Mr.
2026_UPIDC_1107737_23
03/EE/2025-26
Open Tender
Civil Works
180 days
Shrawasti
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹43,900
Yes
19 Mar 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
Earth work excavation in foundation of masonry work in all type of soil including all lead and lift with disposal of earth including cost of all material labour and T& P etc.
Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including cost of all material, labour, T & P etc. complete work.
Earth work in making bypass channel Section & strengthning including all lead & lift; all cost of labour, T & P with manual compaction required for proper completion of work.
Laying C.C. M-10 (1:3:6) mix. in foundation with Kabrai crused stone grit 4.75 to 40 mm size & coarse sand of F.M. not less than 2.0, including cost of all material, labour, T & P etc.required for proper completion of work.
Supply & laying & fixing in position and alignment of 1200 m m dia Np-3 hume pipe, as per direction engineer-in-charge; including cost of all material, labour, T & P etc, required for proper completion of work.
First class brick work in 1:4 C:M with coarse sand, of F.M. not less than 2.0 including all cost of material, labour, T & P etc. required for proper complete work.
First class brick work in 1:3 C:M with coarse sand of F.M. not less then 2.0, including cost of all material, labour, T & P etc. required for proper completion of work.
Earth work in back filling in foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. complete with manual compaction of work.
Laying C.C. M-15 (1:2:4) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0, in collar joint including all cost of material, labour T & P etc. required for proper completion of work.
Deep struck pointing in 1:2 C:M with coarse sand F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work.
Earth work for removing of bypass channel channel; including all lead & lift; all cost of labour, T & P with manual compaction and dressing for proper completion of work.
Dewatering with all cost of power & P.O.L . machine, pump, well point systm and operator etc with assembling and dismentling of machine etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2080478.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid