Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹330.8 CrAccepted-Finance | ₹330.8 Cr | L-1 | Accepted-Finance Accepted |
| 2 | L-2₹341.5 CrAccepted-Finance 19 PARKDRIVE MALIBU TOWN SECTOR 47 SOHNA ROAD GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | ₹341.5 Cr | L-2 | Accepted-Finance Accepted |
Tender Value
₹256.5 Cr
EMD Value
₹2.7 Cr
Closing Date
14 May 2026, 3:00 pmClosed
Executive Engineer, PWD, SER-1, New Delhi
O/o Executive Engineer, PWD, SER-1, New Delhi-110065
Strengthening and other works of various roads under South Maintenance Zone, PWD during 2026-27
2026_PWD_289374_1
110/EE/PWD/SER-1/2025-26
Open Tender
Civil Works
183 days
Executive Engineer, SER-1
Asd per NIT
17 documents required · 17 mandatory
₹0
₹2.7 Cr
O/o Chief Engineer, South (M), Zone, MSO Building,
29 Jun 2026
28 Mar 2026
14 May 2026
28 Mar 2026
14 May 2026
28 Mar 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and all lifts, as directed by Engineer-in- Charge:
All kinds of soil | - | Sqm | - | - |
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | - | Cum | - | - |
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | - | Cum | - | - |
| 0.0 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil | - | Sqm | - | - |
| 0.0 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth | - | - | - | - |
| 0.9 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 0.0 | 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 gradedstone aggregate40 mm nominal size derived from natural sources) | - | Cum | - | - |
| 0.0 | Providing and laving in position ready mixed or site batched design mix cement concrete for plain cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, to improve durability and workability without impairing strength and durability, including laying at site, curing, carriage for all leads, but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.: | - | - | - | - |
| 0.9 | All works upto plinth level: M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Note: Cement content considered in this item is minimum @220 kg/cum. Nothing extra shall be payable on account of design mix specify more than @220 kg/cum | - | Cum | - | - |
| 0.0 | All works upto plinth level: M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Note: Cement content considered in this item is minimum @240 kg/cum. Nothing extra shall be payable on account of design mix specify more than @240 kg/cum | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.41 MB
BOQ_384302.xls
BOQ • 0.41 MB
Corrigendum4.pdf
PDF • 0.59 MB
Corrigendum3.pdf
PDF • 0.32 MB
MinutesofMeeting.pdf
PDF • 1.53 MB
Corrigendum1.pdf
PDF • 2.97 MB
Corrigendum1.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid