Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.9 LAccepted-AOC | ₹61.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹66.3 L+₹4.3 L (7.00%)Rejected-AOC BANARPAL KULAD NALCO NAGAR NALCO NAGAR ANGUL ODISHA 759145 | ANUGUL | ODISHA | 759145 | ₹66.3 L+₹4.3 L (7.00%) | L2 | Rejected-AOC L2 |
| 3 | L3₹97.2 L+₹35.2 L (56.9%)Rejected-AOC | ₹97.2 L+₹35.2 L (56.9%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno-Commercially not Accepted |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
31 Dec 2020, 3:00 pmClosed
MrsL.MARIA
MANAGER (MECH.) CONTRACTS, CPP, NALCO, ANGUL
OVERHAULING AND MAINTENANCE OF 220KV AND 33KV SWITCHYARD AND TRANSMISSION LINE OF CPP-SMELTER, INTAKE PUMP HOUSE AND ASH POND
2020_NALCO_599627_1
MC-4972
Open Tender
Miscellaneous Services
Item Rate
730 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
₹80,000
Yes
23 Mar 2021
27 Nov 2020
7 Jan 2021
27 Nov 2020
31 Dec 2020
27 Nov 2020
Amount
1A) 220KV ISOLATOR MAINTENANCE AS PER SCOPE OF WORK
1B) 220KV BREAKER MAINTENANCE AS PER SCOPE OF WORK
1C(i) TIGHTENING OF LIGHTNING SPIKE STRU, AS PER SCOPE OF WORK
1C(ii)TIGHTNING OF STRUCTURE 22.5MTR HT, AS PER SCOPE OF WORK
1C(iii)TIGHTNING OF STRUCTURE 17.5MTR HT, AS PER SCOPE OF WORK
1C(iv)TIGHTNING OF STRUCTURE 13.0MTR HT, AS PER SCOPE OF WORK
1C(v)TIGHTNING OF STRUCTURE BEAM10,13,17, AS PER SCOPE OF WORK
1C(vi)TIGHTENING OF ISOLATOR STRUCTURE7.,AS PER SCOPE OF WORK
1C(vii)TIGHTENING OF CT STRUCTURE7.1MTR AS PER SCOPE OF WORK
1C(viii)TIGHTNING OF BUS SUPPORT INSULAT,AS PER SCOPE OF WORK
1C(ix)TIGHTENING OF PT,CVT,LA,BKR STRUCT, AS PER SCOPE OF WORK
1C(x)TIGHTENING OF LA STRUCTURE 10MTR HT, AS PER SCOPE OF WORK
1D(i) TIGHTNESS CHECKING OF DBL TEN CLMP, AS PER SCOPE OF WORK
1D(ii)TIGHTNESS CHECKING OF SIN TEN CLMP, AS PER SCOPE OF WORK
1D(iii)TIGHTNESS CHECKING OF DBL SUSP CL, AS PER SCOPE OF WORK
1D(iv)TIGHTNESS CHECKING OF SING SUSP CL,AS PER SCOPE OF WORK
1D(v)TIGHTNESS CHECKING OF PG CLMP, AS PER SCOPE OF WORK
1D(vi)TIGHTNESS CHECKING OF EAR WIRE TEN, AS PER SCOPE OF WORK
1D(vii)TIGHTNESS CHECKING OF BUS DRPR CL, AS PER SCOPE OF WORK
1D(viii)TIGHTNESS CHECKING OF BUS DRPR C, AS PER SCOPE OF WORK
1D(ix)TIGHTNESS CHECKING OF BKR CLAMP, AS PER SCOPE OF WORK
1D(x)TIGHTNESS CHECKING OF CT,PT,CVT,LA, AS PER SCOPE OF WORK
1D(xi)TIGHTNESS CHECKING OF WAVE TRAP CL, AS PER SCOPE OF WORK
1D(xii)TIGHTNESS CHECKING OF SPACER CLMP,AS PER SCOPE OF WORK
1D(xiii)TIGHTNESS CHECKING OF BUS SUP CL,AS PER SCOPE OF WORK
1D(xiv)TIGHTNESS CHECKING OF AL TUBE ST,AS PER SCOPE OF WORK
1D(xv)220KV 3PH SHORTING & NORMALISATION,AS PER SCOPE OF WORK
2(i)ALIGNMENT OF 220KV ISOLATOR,AS PER SCOPE OF WORK
2(ii)REPLACEMENT OF 220KV ISOL POLYCON,AS PER SCOPE OF WORK
2(iii)REPLACEMENT OF 70-80 OD AL BUS,AS PER SCOPE OF WORK
2(iv)REPLACEMENT OF EQUIP CLMP CT,PT,LA,AS PER SCOPE OF WORK
2(v)REPLACEMENT OF TENSION CLAMP,AS PER SCOPE OF WORK
2(vi)REPLACEMENT OF SUSPENSION CLAMP,AS PER SCOPE OF WORK
2(vii)STRINGING & RESTRINGING OF MOOSE C,AS PER SCOPE OF WORK
2(viii)REPLACEMENT OF 220KV PG CLAMP,AS PER SCOPE OF WORK
2(ix)REPLACEMENT OF GI NUTS & BOLTS,AS PER SCOPE OF WORK
2(x)REPLACEMENT OF WAVE TRAP,AS PER SCOPE OF WORK
2(xi)INSTALLATION OF GI STRIPS 50X6MM OR,AS PER SCOPE OF WORK
2(xii)INSTALLATION OF GI STRIPS ABOVE 50 ,AS PER SCOPE OF WORK
2(xiii)REPAIRING OF GI STRIPS 50X6MM OR ,AS PER SCOPE OF WORK
2(xiv)PAINTING OF PNL WITH ENML PAINT ,AS PER SCOPE OF WORK
2(xv)REFILLING OF SF-6 GAS ,AS PER SCOPE OF WORK
2(xvi)DCRM TESTING OF 220KV BKR ,AS PER SCOPE OF WORK
2(xvii)TAN-DELTA TESTING OF 220KV CT,BUS ,AS PER SCOPE OF WORK
2(xviii)CRM & TIMING MEAS OF 220KV BKR ,AS PER SCOPE OF WORK
2(xix)O/H OF 220KV BREAKER ,AS PER SCOPE OF WORK
2(xx)O/H OF ABB BREAKER VENTILE ,AS PER SCOPE OF WORK
2(xxi)REPLACEMENT OF ABB BKR VENTILE ,AS PER SCOPE OF WORK
2(xxii)O/H OF ABB BREAKER ACTUATOR ,AS PER SCOPE OF WORK
2(xxiii)O/H OF 220KV ISO MECH G.BOX,AS PER SCOPE OF WORK
2(xxiv)THERMOGRAPHY OF SWRD CLAMP & CONN,AS PER SCOPE OF WORK
2(xxv)EARTH RESISTANS MEAS OF EARTH PIT,AS PER SCOPE OF WORK
2(xxvi)HEALTHINESS CHECKING OF LA,AS PER SCOPE OF WORK
2(xxvii)STRINGING/RESTRINGING OF SHLD WI,AS PER SCOPE OF WORK
2(xxviii)STRING/RESTRINGING OF EARTH WIR,AS PER SCOPE OF WORK
3(i)MAINT. OF 220KV TENSION TOWER,AS PER SCOPE OF WORK
3(ii)MAINT. OF 220KV NORMAL TOWER,AS PER SCOPE OF WORK
4(i)REPLACEMENT OF 220KV TENS INSULATOR,AS PER SCOPE OF WORK
4(ii)REPLACEMENT OF 220KV SUSP INSULATOR,AS PER SCOPE OF WORK
4(iii)REPLACEMENT OF 220KV TR ROD.,AS PER SCOPE OF WORK
4(iv)REPLACEMENT OF 220KV TENSION CLAMP,AS PER SCOPE OF WORK
4(v)REPLACEMENT OF 220KV SUSP CLAMP,AS PER SCOPE OF WORK
5(i)PAINTING OF SINGLE POLE INCL SUPPLY,AS PER SCOPE OF WORK
5(ii)PAINTING OF SINGLE POLE EXCL SUPPLY,AS PER SCOPE OF WORK
5(iii)PAINTING OF DP INCLUDING SUPPLY,AS PER SCOPE OF WORK
5(iv)PAINTING OF DP EXCLUDING SUPPLY,AS PER SCOPE OF WORK
5(v)PAINTING OF FOUR POLE EXC SUPPLY,AS PER SCOPE OF WORK
5(vi)MAINT. OF SINGL POLE WITH CUT POINT,AS PER SCOPE OF WORK
5(vii)MAINT OF SINGL POLE WITHOUT CUT PO,AS PER SCOPE OF WORK
5(viii)MAINT OF 33KV DP STRUCTURE,AS PER SCOPE OF WORK
5(ix)MAINT OF TOWER IN ASH POND LINE,AS PER SCOPE OF WORK
6(i)REPLACEMENT OF 33KV DISC INSULATOR,AS PER SCOPE OF WORK
6(ii)REPLACEMENT OF 33KV PIN INSULATOR,AS PER SCOPE OF WORK
6(iii)STRINGING OF O/H LINE WITH RACOON,AS PER SCOPE OF WORK
6(iv) 33KV MID SPAN JOINTING OF RACOON,AS PER SCOPE OF WORK
6(v)ERECTION OF 200X100MM RS JOIST POLE ,AS PER SCOPE OF WORK
6(vi)ERECTION OF DP FOR 33KV LINE,AS PER SCOPE OF WORK
6(vii)DISMANTLING OF 200X100MM RS JOIST,AS PER SCOPE OF WORK
6(viii)INSTALLATION OF STAY INCL SUPPLY,AS PER SCOPE OF WORK
6(ix)REPAIRING OF STAY INCL REPLACEMENT,AS PER SCOPE OF WORK
6(x)DISMANTLING OF EXISTING STAY SET,AS PER SCOPE OF WORK
6(xi)STRINGING/RESTRINGING OF GUARD WIRE,AS PER SCOPE OF WORK
6(xii)INSTALLATION & COMMIS OF EARTH PIT,AS PER SCOPE OF WORK
6(xiii)REPAIRING OF PIPE EARTHING,AS PER SCOPE OF WORK
6(xiv)ERECTION OF COIL EARTHING,AS PER SCOPE OF WORK
6(xv)REPAIRING OF COIL EARTHING,AS PER SCOPE OF WORK
6(xvi)FABRICATION OF MS ANGL/CHNL/FLAT,AS PER SCOPE OF WORK
7(i)REPLACEMENT OF V/STRAIGHT C ARM AT C,AS PER SCOPE OF WORK
7(ii)REPLACEMENT OF V/STRAIGHT C ARM ST,AS PER SCOPE OF WORK
7(iii)REPLACEMENT OF TOP CHNL AT C POINT,AS PER SCOPE OF WORK
7(iv)REPLACEMENT OF TOP CHNL ST R POINT,AS PER SCOPE OF WORK
7(v)REPLACEMENT OF CROSS ARM IN DP,AS PER SCOPE OF WORK
7(vi)DISMANTLING & RESTRINGING WITH RACO,AS PER SCOPE OF WORK
8)MAINT. OF 33KV SWRD AT CPP/IPH/AP,AS PER SCOPE OF WORK
9(i)REPLACEMENT OF 33KV POST INSULATOR,AS PER SCOPE OF WORK
9(ii)REPLACEMENT OF 33KV ISOL M CONTACT,AS PER SCOPE OF WORK
9(iii)REPLACEMENT OF 33KV ISOL F CONTACT,AS PER SCOPE OF WORK
9(iv)ALIGNMENT OF 33KV ISOLATOR,AS PER SCOPE OF WORK
9(v)REPLACEMENT OF 33KV DISC INSULATOR,AS PER SCOPE OF WORK
9(vi)REPLACEMENT OF 33KV PIN INSULATOR,AS PER SCOPE OF WORK
9(vii)REPLACEMENT OF 33KV ST INSL HARDWA,AS PER SCOPE OF WORK
9(viii)DISMANTLING OF DOG/RACOON CONDUCT,AS PER SCOPE OF WORK
9(ix)REPLACEMENT OF 33KV CLAMP/CONNECTOR,AS PER SCOPE OF WORK
9(x)REPLACEMENT OF CT/PT/LA JN BOX,AS PER SCOPE OF WORK
9(xi)REPLACEMENT OF SURGE COUNTER,AS PER SCOPE OF WORK
9(xii)REPLACEMENT OF 33KV DROP OUT FUSE,AS PER SCOPE OF WORK
10)MAINT. OF 6.6KV VCB AT CPP & IPH,AS PER SCOPE OF WORK
11)MAINT. OF 6.6KV BOARD(SECTION WISE),AS PER SCOPE OF WORK
12(A)MAINT OF 6.6KV CAP BANK,AS PER SCOPE OF WORK
12(B1)REPLACEMENT OF CAPACITOR UNIT,AS PER SCOPE OF WORK
12(B2)REPLACEMENT OF 6.6 KV LA,AS PER SCOPE OF WORK
12(B3)REPLACEMENT OF 6.6KV NEUTRAL CT,AS PER SCOPE OF WORK
12(B4)REPLACEMENT OF 6.6KV CLAMP/CONNECT,AS PER SCOPE OF WORK
12(B5)REPLACEMENT OF 6.6KV ISOLATOR,AS PER SCOPE OF WORK
12(B6)ALIGNMENT OF 6.6KV ISOLATOR,AS PER SCOPE OF WORK
12(B7)REPLACEMENT OF 6.6 KV PT,AS PER SCOPE OF WORK
12(B8)REPLACEMENT OF 6.6KV INDUCTOR COIL,AS PER SCOPE OF WORK
13)MAINT. OF 415V LT BREAKER,AS PER SCOPE OF WORK
14)MAINT. OF 415V LT BOARD,AS PER SCOPE OF WORK
15)MISC. JOBS(BRANCHING/TRIMMING),AS PER SCOPE OF WORK
16(A)MANPOWER SUPPLIES(SW),AS PER SCOPE OF WORK
16(B)MANPOWER SUPPLIES(SSW),AS PER SCOPE OF WORK
16(C)MANPOWER SUPPLIES(USW),AS PER SCOPE OF WORK
17(A)RETROFITTING OF 220KV BREAKER,AS PER SCOPE OF WORK
17(B)REPLACEMENT OF 220KV BREAKER POLE,AS PER SCOPE OF WORK
17(C)REPLACEMENT OF ACTUATOR/SPRING MECH,AS PER SCOPE OF WORK
17(D)REPLACEMENT OF 220KV CT/PT/CVT/LA,AS PER SCOPE OF WORK
17(E)REPLACEMENT OF 220KV ISOLATOR JOB,AS PER SCOPE OF WORK
17(F)REPLACEMENT OF 220KV ISOL MECH G/B,AS PER SCOPE OF WORK
17(G)REPLACEMENT OF 33KV VCB,AS PER SCOPE OF WORK
17(H)REPLACEMENT OF 33KV OIL FILLED CT,AS PER SCOPE OF WORK
17(I)REPLACEMENT OF 33KV OIL FILLED PT,AS PER SCOPE OF WORK
17(J)REPLACEMENT OF 30KV,10KA LA,AS PER SCOPE OF WORK
17(K)RETROFITTING OF 33KV ISOLATOR, ,AS PER SCOPE OF WORK
17(L)RETROFITTING OF 33KV AB SWITCH,AS PER SCOPE OF WORK
18(A)LAYING OF CABLE UPTO 1.1KV,AS PER SCOPE OF WORK
18(B)CABLE END TERMINATION UPTO 1.1KV,AS PER SCOPE OF WORK
M/s. Unitech Power Engineering & Co.
M/S. BHARAT KUMAR SAHOO
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .