Loading…
Loading…
Tender Value
₹3.7 L
EMD Value
₹4,000
Closing Date
29 Jul 2026, 6:00 pm
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
Providing manpower supply (i.e. Sweeper,Mali) for Sanand Irrigation Sub Division office & Colony Compound under S. I. Sub Division, Sanand
323674
08 of 2026-27
Open
Miscellaneous Works
Service
Ahmedabad
6 documents required · 5 mandatory · 1 optional
₹600
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
₹4,000
15 Jul 2026
15 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
BILL OF QUANTITY
Name of Providing manpower supply (i.e. Sweeper,Mali) for Sanand Irrigation Sub Division office &
work: Colony Compound under S. I. Sub Division, Sanand
Item NO. DESCRIPTION QTY. UNIT RATE in AMOUNT
1 Providing Sweeper (Unskilled) 18.00 Month 16600.48
Engaging Mali for gardening and plantation works
In words Three Lakh Seventy Three Thousands five hundred ten Rupees and Eighty paisa Only
I/We am/are willing to carry out the work at…… % above/below percent(Should be written in figures and words) of the
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
The Rate of Service Charges (Contractor profit and overhead charges) shall be between 3.85 % to 7 %
(including 3.85% & 7%).
The tender having the quoted rate for service charges (Contractor profit and overhead charges) beyond
this(3.85%-7.00%) shall be rejected.
7 Above mentioned amount per unit is including EPF, ESI, Miscellaneous provision and & all taxes except GST.
8 Service charges means the C.P. & O.H. charges.
Deputy Executive Engineer Executive Engineer
Sanand Irrigation Sub Division Ahmedabad Irrigation Division
Sanand Ahmedabad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book sweeper.pdf
BOQ sweeper.pdf
Tender notice 08 of 2026-27 - For CD and Publish.pdf
Download all tender documents and submit your bid