Tender Value
₹68.8 L
EMD Value
₹1.4 L
Closing Date
2 Mar 2026, 3:30 pmClosed
Protection of OHE Mast foundation in high embankment area between stations New Makarpura (Km 425.000) - New Bhestan (Km 286.867) under the Jurisdiction of GM(Co.)/DFCCIL/Surat.
ST-EN-OHE-MPRN-BHETN-334~WDFC
ST-EN-OHE-MPRN-BHETN-334
Open
Works - General
12 Months
Surat, Gujarat
₹0
₹1.4 L
2 Mar 2026
8 Feb 2026
16 Feb 2026
Item Breakup - A-DSR 2021 Item No
2.6 Earth work in excavation by mechanical means cum (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1:All kinds of soils
2.28: Surface dressing of the ground including Sqm removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 2.28.1:All kinds of soil
4.7:Providing and fixing up to floor five level cum precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 4.7.1:1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Cement, stone blocks, tonne G.I.. C.I., A.C., & Tonne C.C.pipes below 100 mm dia and other heavy materials Lead 5 Km
1.1.10 Cement, stone blocks,G.I.. C.I., A.C., & C.C. Tonne pipes below 100 mm dia and other heavy materials Lead Beyond 05 Km up to 10 Km
1.1.10: Cement, stone blocks,G.I.. C.I., A.C., & C.C. Tonne pipes below 100 mm dia and other heavy materials Lead Beyond 10 Km up to 20 Km per Km
1.1O:Cement, stone blocks,G.I.. C.I., A.C., & C.C. Tonne pipes below 100 mm dia and other heavy materials Lead Beyond 20 Km per additional Km Total 5060834.45
Item Breakup - B-USSOR 2021 Item
Providing and laying Filter Material as per RDSO cum Specifications underneath pitching in slopes complete as per drawing and Technical Specification Total 1037423.20
Item Breakup - C-NS ITEM
Side Slope Compaction of Earth & blanket on the cum existing formation, with contractors own roller, machinery, equipment, labours, fuels tools & plants etc complete. Total 33210.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].