Tender Value
₹5.7 Cr
EMD Value
₹5.7 L
Closing Date
1 Jul 2026, 6:00 pm
Superintending Engineer, Public Health Circle, GWSSB, Mehsana
Comprehensive Operation and Maintenance of Civil and Electromechanical assets such as elevated service reservoirs (E.S.R), HGLR, sump, chemical house, pump house, all transmission and distribution pipelines, valves, pumping machinery and electrical equipment etc. for the Satlasana Group, Dharoi Regional water supply scheme, including supply of 15 MLD potable water to all the 14 hamlets 71 villages for 60 months period. Ta. Satlasana, Kheralu Dist. Mahesana based on Dharoi Dam. Including supply of chlorine gas
310227
03 of 2026-27
Open
Civil Works - Water Works
Mehsana
6 documents required · 6 mandatory
₹12,000
Executive Engineer, Public Health Works Division, GWSSB, Mehsana
₹5.7 L
1 Jun 2026
1 Jun 2026
1 Jun 2026
1 Jul 2026
1 Jun 2026
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such
as <elevated service reservoirs (E.S.R), HGLR, sump, chemical house, pump house, all transmission
and distribution pipelines, valves, pumping machinery & electrical equipment etc.> for the
“Satlasana Group, Dharoi Regional water supply scheme, including supply of 15 MLD potable water
to all the 14 hamlets/ 71 villages for 60 months period. Ta. Satlasana/Kheralu Dist. Mahesana based
on Dharoi Dam. Including supply of chlorine gas.
Estimated Cost: Rs.
Gujarat Water Supply & Sewerage Board
SR. NO. PARTICULARS
Schedule showing approximate quantity of materials to be supplied to the contractor at the govt.
store for the work to be executed on contract and the rate which they are to be charged.
Sr. Particular Quantity Issue Rate Unit Place of Delivery
1 Pipes of Various As Free of cost Rmt. / No. @ Vav Headworks Ta.
diameters of various required whichever is Satlasana Dist.Mahesana &
type and class. (MS/ applicable Any Store of GWSSB in
PVC/DI etc) and all types Mehsana District
Note: above material will be given for Part-A of Schedule -B. Not for Part-C of the tender.
1. Materials not included in “Schedule – A” but required for the work shall be provided by the
contractor at his own cost.
2. Any materials required for items other than labour charges items mentioned in “Schedule – B”
and materials not included in “Schedule – A” but available with dept. will be issued on request of
the contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting the
materials issued by the dept. from store to site at his own cost. Contractor will be responsible
for damages whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the
department in good and acceptable condition by the contractors. Any such unused materials not
returned by the contractor in time or issued will be recovered at Double of (As per issue rate +
3% storage charge or Board RC + 3% storage charges) whichever is more.
5. All materials such as Specials, Fittings, Spares, PAC Solution and chlorine gas etc. shall be
brought by Agency / Contractor at site of work.
6. The material which requires to be procured by contractor and same as available with the
department the same can be issued to the contractor after prior approval from the competent
authority and charged for the same will be at the current market rate or issue rate fixed by the
department whichever is higher. The contractor shall have to deposit total cost of materials
issued or shall be recovered from the running account bill.
7. The materials issued for the above work shall be used in the above O&M work only. If any of
materials issued for this work and found used in other works shall be charged at the double rate.
8. As per the instructions of the competent authority and availability of materials, if needed
contractor have to transport the same from the other store to SATLASANA GROUP RWSS
Scheme for which no extra carting, loading, unloading will be paid.
9. The materials issued free of cost to the contractor is to be transported to the site of work in
good condition by the contractor for which no extra payment will be made.
10. The materials to be brought/purchase by the contractor shall be got approval from the EIC
before using in the work.
Signature of the contractor
Executive Engineer
P. H. Dharoi Project Division
LIST FOR EQUIPMENTS/INSTRUMENTS REQUIRED FOR SITE OFFICE WORK
Item Description
Agency Has to Procure and must supply at site free of cost and hand over to Engineer in charge
within one month from date of work order given as under.
1 Providing and supplying Canon image CLASS MF284dw Wireless Black & 2.0 Nos.
White Laser Printer – All-in-One (Print/Copy/Scan), 35 PPM, Auto Duplex
Printing, Auto Document Feeder, Mobile Device Compatible, with starter
toner included, or equivalent approved make and model as directed by the
Engineer-in-Charge, complete in all respects and delivered in the name of the
Deputy Executive Engineer, P.H. Dharoi Project Sub Division, Vav, Ta.
Satlasana, Dist. Mehsana.
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as
<elevated service reservoirs (E.S.R), HGLR, sump, chemical house, pump house, all transmission and
distribution pipelines, valves, pumping machinery & electrical equipment etc.> for the “Satlasana
Group, Dharoi Regional water supply scheme,including supply of 15 MLD potable water to all the
hamlets/ 71 villagesfor 60 months period. Ta. Satlasana/Kheralu Dist. Mahesana based on Dharoi
Dam. Including supply of chlorine gas.
Part Description 2decimals
Comprehensive Operation & Maintenance of Civil & Electromechanical
assets such as <elevated service reservoirs (E.S.R), HGLR, sump,
chemical house, pump house, all transmission and distribution
A pipelines, valves, pumping machinery & electrical equipment etc.> for ₹
the “Satlasana Group, Dharoi Regional water supply scheme,including
supply of 15 MLD potable water to all the 14 hamlets/ 71 villagesfor
months period. Ta. Satlasana/Kheralu Dist. Mahesana based on Dharoi
Dam. Including supply of chlorine gas.
Maintenance activities, measured and paid separately such as painting, ₹45,43,817.53
cleaning of reservoirs/tanks, procurement and chlorine gas etc
complete as per this tender document.
c Repair, upgradation of non-functional assets which are crucial for safe ₹59,38,156.38
and efficient functioning of RWSS
Total Amount(A+B+C) ₹
Total Amount(A+B+C) ₹
Total of Schedule B in Rupees. Rupees Five Crore Sixty Eight Lac Sixty Five Thousand One Hundred
Eighty Six & Paise Seventy Seven only.
I / We am / are willing to carry out the work at_________ % above / Below percent (should be
written in figure and words) of the estimated rates mentioned above amount of my / our tender
works out as under.
Estimated amount Put to tender: Rs. Estimated amount Put to tender: Rs.
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B & C are subject to completion of
activities and approval of the measurement.
Water supply of target quantity of water to all habitations (village, towns and
hamlets)on a daily basis. If due to breakdown, agency is not capable of supplying
water then such quantity should be supplied the next day to cope up with the
shortage. Such that the water supplied on the next day will be 2 times the regular per
Contractor should quote rate in words & figure both.
Insurance Policy should be procured in favour of Executive Engineer, PH Dharoi
Project Division, Mehsana, and contractor has to produce it before entering into
agreement with department, for the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be
given during the maintenance period.
The work should be carried out as per the terms and conditions laid down in the
tender specification.
The cost of raw water, electricity will be borne by GWSSB.
Contractor will supply necessary stock of Chlorine gas. All other required material for
O&M work shall be brought by the contractor at his own cost including loading,
unloading and carting.
The cost is including all type of taxes (other than GST), octroi, freight, loading,
unloading, carting labour charges payment to labour including insurance, P.F. and all
other liabilities for the staff engaged for the O&M work.
All replaced material (provided from the department’s store) shall be returned to
department store by the contractor at his own cost.
Painting of overall structures:Internal/external painting of civil structures,
machineries, manifolds, valves etc.
Interior Paint: Distemper paint to all civil assets
Exterior paint: shall be acrylic emulsion paint colour (like APEX): pump house,
treatment plants, treated water pumping stations, GSRs, ESRs, sump, stores, etc all.
Oil paint colour: All type of doors, windows, ventilation, shutter, pump, motor, all
valves & equipment inside pump house, transformer yard, D.P. structure, transformer
Black Japan colour: air valve, sluice valve, riser pipe of air valve, zero velocity valve,
butterfly valve (outdoor), bypass arrangement etc.
DEDIYASAN REGIONAL WATER SUPPLY SCHEME TA.MEHSANA/JOTANA &DI.MEHSANA
PART-A OPERATION & MAINTENANCE
Item Description Quantity Unit
No in Rs. Amount in Rs.
A1 Comprehensive Operation & Maintenance
of Civil & Electromechanical assets such as
<elevated service reservoirs (E.S.R), HGLR,
sump, chemical house, pump house, all
transmission and distribution pipelines,
valves, pumping machinery & electrical
equipment etc.> for the “Satlasana Group,
Dharoi Regionalwater supply 12 6,85,684.59 Month
scheme,including supply of 15 MLD potable
water to all the 14 hamlets/ 71 villagesfor
60 months period. Ta. Satlasana/Kheralu
Dist. Mahesana based on Dharoi Dam.
Including supply of chlorine gas.For 1st
A2 2nd Year Total Rs. 12 7,26,825.66 Month
A3 3rd Year Total Rs. 12 7,70,435.20 Month
A4 4th Year Total Rs. 12 8,16,661.31 Month
A5 5th Year Total Rs. 12 8,65,660.99 Month
Part-B, 1ST YEAR
Work of Cleaning of Storage, Colour Work& Refilling of Gas Cylinder for Different Head work
of Dharoi Regional Water Supply Scheme. Ta. Satlasana/Kheralu/VadanagarDist.:-
MAHESANA. Under M&R Programme of Satlasana Group Dharoi RWSS.
Sr. Rate Amount
Item Of Work (FIRST YEAR) Qty. Unit
Labour charges for Cleaning of ESR/Sump
/HGLR/GLCC with cleaning and removing algea
calcinations, sludge, dirt deposition from bottom
1 and as well as from wall of container, disinfection
by bleaching powder with all necessary tools and
plants, labour and cost of disinfectant etc
1.a Under Ground Sump 7 Lac. Lit at Kothasana SHW 2.00 No. 6829.00
1.b HGLR 5 Lac. Lit at Nani Bhalu 2.00 No. 5463.00
1.c ESR 3 Lac Lit/ 15 mt. Height at Talegadh SHW 2.00 No. 3187.00
1.d U/G Sump 8 Lacs Lit. at Talegadh SHW 2.00 No. 7511.00
1.e ESR 3 Lac Lit/18 mt. Height at Otalpur SHW 2.00 No. 3187.00
1.f U/G Sump 8 Lacs Lit. at Otalpur SHW 2.00 No. 7511.00
1.g ESR 3 Lac Lit. 15 Mt. Height at Shahupura SHW 2.00 No. 3187.00
1.h Under Ground Sump 5 Lac Lit. at Shahupura SHW 2.00 No. 5463.00
1.i ESR 5 Lac Lit. 15 Mt. Height at Varetha SHW 2.00 No. 4666.00
1.j Under Ground Sump 10 Lac Lt. at Varetha SHW 2.00 No. 9105.00
Refilling of Gas Cylinder: Refilling of Chlorine gas 109.00 No. 1,741.00
in Cylinder with Loading, Unloading including
2 transportation to and from factory and back.
Chlorine gas (100 Kg.)
Part-B, 2nd YEAR
Work of Cleaning of Storage, Colour Work & Refilling of Gas Cylinder for Different Head
work of Dharoi Regional Water Supply Scheme. Ta. Satlasana/Kheralu/VadanagarDist.:-
MAHESANA. Under M&R Programme of Satlasana Group Dharoi RWSS.
Sr. Rate Amount
Item of Work (SECOND YEAR) Qty. Unit
Providing and applying Epoxy paint of 11,500.00 Sq.Mt. 102.82
approved make to concrete surface for RCC
ESR of GSR or any other structure including
cleaning the surface by scrapping and air
blowers to the satisfaction of Engineer-in-
charge necessary scaffolding etc. complete
with all leads and lifts and giving satisfactory
hydraulic test for water tightness as per IS
For OLD Surface - Two Coats
Painting One Coat (Excluding Priming Coat) 820.00 Sq.Mt 122.30
on Previously Printed Steel and Other Metal
Surface with Synthetic Enamel Paint,
Brushing to Give an Even shade including
cleaning the surface of all dirt, dust and
Other foreign Matter.
Labour charges for Cleaning of ESR/Sump .
/HGLR/GLCC with cleaning and removing
algea calcinations, sludge, dirt deposition
3 from bottom and as well as from wall of
container, disinfection by bleaching powder
with all necessary tools and plants, labour
and cost of disinfectant etc complete.
3.a Under Ground Sump 7 Lac. Lit at Kothasana 2.00 No. 7,238.74
3.b HGLR 5 Lac. Lit at Nani Bhalu 2.00 No. 5,790.78
3.c ESR 3 Lac Lit/ 15 mt. Height at Talegadh SHW 2.00 No. 3,378.22
3.d U/G Sump 8 Lacs Lit. at Talegadh SHW 2.00 No. 7,961.66
3.e ESR 3 Lac Lit/18 mt. Height at Otalpur SHW 2.00 No. 3,378.22
3.f U/G Sump 8 Lacs Lit. at Otalpur SHW 2.00 No. 7,961.66
3.g ESR 3 Lac Lit. 15 Mt. Height at Shahupura 2.00 No. 3,378.22
3.h Under Ground Sump 5 Lac Lit. at Shahupura 2.00 No. 5,790.78
3.i ESR 5 Lac Lit. 15 Mt. Height at Varetha SHW 2.00 No. 4,945.96
3.j Under Ground Sump 10 Lac Lt. at Varetha 2.00 No. 9,651.30
Refilling of Gas Cylinder : Refilling of Chlorine 111.00 No. 1,845.46
gas in Cylinder with Loading, Unloading
4 including transportation to and from factory
Chlorine gas (100 Kg.)
Part-B, 3rd YEAR
Work of Cleaning of Storage, Colour Work& Refilling of Gas Cylinder for Different Head work
of Dharoi Regional Water Supply Scheme. Ta. Satlasana/Kheralu/VadanagarDist.:-
MAHESANA. Under M&R Programme of Satlasana Group Dharoi RWSS.
Sr. Rate Amount
Item Of Work (THIRD YEAR) Qty. Unit
Labour charges for Cleaning of ESR/Sump
/HGLR/GLCC with cleaning and removing algea
calcinations, sludge, dirt deposition from bottom
1 and as well as from wall of container, disinfection
by bleaching powder with all necessary tools and
plants, labour and cost of disinfectant etc
1.a Under Ground Sump 7 Lac. Lit at Kothasana SHW 2.00 No. 7,673.06
1.b HGLR 5 Lac. Lit at Nani Bhalu 2.00 No. 6,138.23
1.c ESR 3 Lac Lit/ 15 mt. Height at Talegadh SHW 2.00 No. 3,580.91
1.d U/G Sump 8 Lacs Lit. at Talegadh SHW 2.00 No. 8,439.36
1.e ESR 3 Lac Lit/18 mt. Height at Otalpur SHW 2.00 No. 3,580.91
1.f U/G Sump 8 Lacs Lit. at Otalpur SHW 2.00 No. 8,439.36
1.g ESR 3 Lac Lit. 15 Mt. Height at Shahupura SHW 2.00 No. 3,580.91
1.h Under Ground Sump 5 Lac Lit. at Shahupura SHW 2.00 No. 6,138.23
1.i ESR 5 Lac Lit. 15 Mt. Height at Varetha SHW 2.00 No. 5,242.72
1.j Under Ground Sump 10 Lac Lt. at Varetha SHW 2.00 No. 10,230.38
Refilling of Gas Cylinder: Refilling of Chlorine gas 109.00 No. 1,956.19
in Cylinder with Loading, Unloading including
2 transportation to and from factory and back.
Chlorine gas (100 Kg.)
Part-B, 4th YEAR
Work of Cleaning of Storage, Colour Work& Refilling of Gas Cylinder for Different Head work
of Dharoi Regional Water Supply Scheme. Ta. Satlasana/Kheralu/VadanagarDist.:-
MAHESANA. Under M&R Programme of Satlasana Group Dharoi RWSS.
Sr. Rate Amount
Item Of Work (FOURTH YEAR) Qty. Unit
Labour charges for Cleaning of ESR/Sump
/HGLR/GLCC with cleaning and removing algea
calcinations, sludge, dirt deposition from bottom
1 and as well as from wall of container, disinfection
by bleaching powder with all necessary tools and
plants, labour and cost of disinfectant etc
1.a Under Ground Sump 7 Lac. Lit at Kothasana SHW 2.00 No. 8,133.44
1.b HGLR 5 Lac. Lit at Nani Bhalu 2.00 No. 6,506.52
1.c ESR 3 Lac Lit/ 15 mt. Height at Talegadh SHW 2.00 No. 3,795.76
1.d U/G Sump 8 Lacs Lit. at Talegadh SHW 2.00 No. 8,945.72
1.e ESR 3 Lac Lit/18 mt. Height at Otalpur SHW 2.00 No. 3,795.76
1.f U/G Sump 8 Lacs Lit. at Otalpur SHW 2.00 No. 8,945.72
1.g ESR 3 Lac Lit. 15 Mt. Height at Shahupura SHW 2.00 No. 3,795.76
1.h Under Ground Sump 5 Lac Lit. at Shahupura SHW 2.00 No. 6,506.52
1.i ESR 5 Lac Lit. 15 Mt. Height at Varetha SHW 2.00 No. 5,557.28
1.j Under Ground Sump 10 Lac Lt. at Varetha SHW 2.00 No. 10,844.20
Refilling of Gas Cylinder: Refilling of Chlorine gas 109.00 No. 2,073.56
in Cylinder with Loading, Unloading including
2 transportation to and from factory and back.
Chlorine gas (100 Kg.)
Part-B, 5th YEAR
Work of Cleaning of Storage, Colour Work & Refilling of Gas Cylinder for Different Head
work of Dharoi Regional Water Supply Scheme. Ta. Satlasana/Kheralu/VadanagarDist.:-
MAHESANA. Under M&R Programme of Satlasana Group Dharoi RWSS.
Sr. Rate Amount
Item of Work (FIFTH YEAR) Qty. Unit
Providing and applying Epoxy paint of 11,500.00 Sq.Mt. 122.46
approved make to concrete surface for RCC
ESR of GSR or any other structure including
cleaning the surface by scrapping and air
blowers to the satisfaction of Engineer-in-
charge necessary scaffolding etc. complete
with all leads and lifts and giving satisfactory
hydraulic test for water tightness as per IS
For OLD Surface - Two Coats
Painting One Coat (Excluding Priming Coat) 820.00 Sq.Mt. 145.66
on Previously Printed Steel and Other Metal
Surface with Synthetic Enamel Paint,
Brushing to Give an Even shade including
cleaning the surface of all dirt, dust and
Other foreign Matter.
Labour charges for Cleaning of ESR/Sump
/HGLR/GLCC with cleaning and removing
algea calcinations, sludge, dirt deposition
3 from bottom and as well as from wall of
container, disinfection by bleaching powder
with all necessary tools and plants, labour
and cost of disinfectant etc complete.
3.a Under Ground Sump 7 Lac. Lit at Kothasana 2.00 No. 8,621.45
3.b HGLR 5 Lac. Lit at Nani Bhalu 2.00 No. 6,896.91
3.c ESR 3 Lac Lit/ 15 mt. Height at Talegadh SHW 2.00 No. 4,023.51
3.d U/G Sump 8 Lacs Lit. at Talegadh SHW 2.00 No. 9,482.46
3.e ESR 3 Lac Lit/18 mt. Height at Otalpur SHW 2.00 No. 4,023.51
3.f U/G Sump 8 Lacs Lit. at Otalpur SHW 2.00 No. 9,482.46
3.g ESR 3 Lac Lit. 15 Mt. Hetight at Shahupura 2.00 No. 4,023.51
3.h Under Ground Sump 5 Lac Lit. at Shahupura 2.00 No. 6,896.91
3.i ESR 5 Lac Lit. 15 Mt. Hetight at Varetha SHW 2.00 No. 5,890.72
3.j Under Ground Sump 10 Lac Lt. at Varetha 2.00 No. 11,494.85
Refilling of Gas Cylinder : Refilling of Chlorine 115.00 No. 2,197.97
gas in Cylinder with Loading, Unloading
4 including transportation to and from factory
Chlorine gas (100 Kg.)
Providing, Installing & Commissioning Chlorination plant and Construction of Chlorine
room at Kothasana SHW, Talegadh SHW, Otalpur SHW, Shahupura SHW, Varetha SHW &
Repairing of Compound Wall at Talegadh SHW in Satlasana Group of Dharoi RWSS.
Ta.Satlasana/KheraluDi.Mahesana.
Sr. Total Rate Amount
DESCRIPTION OF ITEM Unit
No. Qty in Rs. in Rs.
A CHLORINATION ROOM AND PLANT
1 Providing, Supplying & installing 7.00 No. 1,31,917.00
Vacuum Control Direct wall
mounted gas chlorinator including
necessary fittings, installation and
commissioning of plant incl. Clamp,
copper pipe, ferule filter & control
valve with injector D 2 kg capacity
at (Talegath 2 (1W+1S), Kothasana
2 (1W+1S), Otalpur 1 (1S),
Shahupura 1(1S), Varetha 1(1S)
2 Providing, Supplying & Safety Kit 5.00 No. 40,418.00
for 100 Kg Capacity Tonner
3 Providing, Supplying Digital 5.00 No. 62,551.00
Chlorine Detector Monitor meter-
to 20 ppm Capacity
4 Providing and supplying Air 5.00 No. 41,380.00
breathing appratus as per IS:10245
Part-II with 45 minutes duration
Chloroscope 0.5 ppm including
testing materials
6 Providing laying and jointing in true 250.00 Rmt 91.84
line and level 25mm dia. U.P.V.C.
Pipe ( SCH- 40) for cold water
including fittings as approved by
Engineer In Charge. Pipe shall be
fixed on the wall with the help of
clamp at every two metre C/C or
shall be concealed as directed
including necessary fittings etc.
including testing of pipe and joints
and fixing the same with adhesive
solvent, including cost of all
7 Designing (aesthetically) and 120.00 Sq.Mt. 15,301.72
constructing R.C.C frame structure
for constructing Chlorination Room
Size With (6.00 Length x
Breadh) Sq.Mt. No.5 at various
(Kothasana, Talegadh, Otalpur,
Varetha & Shahupura) SHW
Ta.Satlasana/ Kheralu Dist.
Mehsana With Gantry structure
including chlorine neutralization pit
8 Providing and supplying Chlorine 10.00 No. 26,945.00
gas cylinder empty of required
capacity with necessary explosive
certificates including all taxes
9 Providing and fixing Gun metal 10.00 No. 420.63
check or non-return fullway wheel
valve. (C) 25mm dia.
10 Single Girder EOT Crane 5.00 No. 3,68,250.00
Supply, installation, testing &
commissioning single girder type
fully electrically operated EOT
crane with electrically operated
hoist, class II duty, geared travelling
trolley with seven meter lift
complete with long travel rail track
(40 mm sq. bar), moving or cross
girder, all three motions electrically
operated by suitable rating motor
IP 54, control panel & down
pendant control block, brake,
safety device, cables form motor to
starter panel & other required
accessories & tested as per IS
Specifications.Capacity :1T Span:0-
6 M. Long Travel: 12M. Lift: 6-10M.
11 Supplying & erecting approved 5.00 No. 1703.87
make low noise decorative exhaust
fan having square frame ABS body
with inbuilt lowers & square frame.
200mm with 1350 RPM Cat.II
12 Supply, laying, testing & 200.00 Meter 78.00
commissioning 1.1 kV grade, XLPE
insulated, stranded Aluminium
conductor, galvanised steel flat
strip / round wire armoured,
extruded PVC type ST2 sheathed,
heavy duty cable (to be laid on wall
surface with necessary clamps / in
existing cable trench / cable trays /
conduit / pipe sleeves at road
crossing or floor as per site
requirement) conforming to IS:
7098 (Part-1) & IEC: 60502 (Part-1)
of following sizes: C. 4 Core x
13 Providing and supplying caustic 700.00 KG 50.00
soda flakes to different location as
directed by Engineer incharge.
B COMPOUND WALL
14 Excavation for foundation up to 1.5 M. 18.00 Cmt. 122.99
depth including sorting out and
stacking of useful materials and
disposing off the excavated stuff up to
50 M. lead.in Loose or Soft soil
15 Providing and casting in situ mass 1.80 Cmt. 3698.62
cement concrete in grade M-10
(approx. corresp. to prop. 1:3:6) using
granite quartzite trap metal of size
mm to 25 mm incl. consolidation
curing etc. complete. Without forms
16 Brick work using common burnt clay 12.04 Cmt. 3424.52
building bricks having crushing
strength not less than 35 kg/cm2 in
foundation & plinth in cement mortar
1:6 (1 cement : 6 fine sand)(a)
Conventional (More than 10 ton) Wall
17 Supplying cutting, bending, binding 0.17 MT 73,940.08
and placing in position steel as per
plan and design and as per ISS
including cost of steel and binding wire
for reservoirs/structures only including
lift up to 6 meter height or depth
below G.L. for all diameters.
-Do- Thermo mechanically treaed
(TMT) bars Fe 415 grade for all
18 Providing and casting in situ C.C. in 23.90 Cmt. 5575.20
grade M-20 (proportions as per mix
design or as per table9 of IS456
in masses by weigh batching ) using
granite, quartzite trap metal of size
mm to 20 mm for RCC work, including
scaffolding centering, formwork,
needle vibrated consolidation, curing
complete up to 6 meter depth or
height (excluding cost of
reinforcement and neat finishing) with
centering and shuttering/deshuttering
etc. complete for structure other than
water retaining (Below G.L).
Footing (with formwork)
19 Brick work using common burnt clay 7.40 Cmt. 3706.17
building bricks having crushing
strenght not less than 35 kg/cm2 in
super Strucuture above plinth level
upto floor two level in cement mortar
1:6 (1 cement:6 fine sand) (b)
conventional (More than 10 ton)
20 Providing 15 mm thick cement plaster 108.13 Sq.Mt. 184.78
in single coat on Rough (Similar)side of
single or half brick walls for interior
plastering upto floor two level finished
even & smooth in (1) cement Mortar
21 Finishing wall with water proofing 108.13 Sq.Mt. 65.25
cement paint on walls surfaces (two
coats) to give an approved brand &
manufacture & of required shape even
shade after thoroughly brushing the
surface to remove all dirt & remains of
loose powdered materials. As Per
mm Thick Plaster
22 Filling available excavated earth 5.56 Cmt. 136.92
(excluding rock) in trenches, plinth
sides of foundation etc. in layers not
exceeding 20 cm. in depth
consolidating each deposited layer by
ramming and watering.
Total Estimated Cost of Part C: Rupees Fifty Nine Lac Thirty EightThousand One Hundred Fifty
Six& Paise Thirty Eight only (in figures and words)
Total time limit for completion of Part C scope of work: 12(months) (shall not be more than
months from start date of contract.)
1.1. BREAK UP FOR INTERIM PAYMENTS
(CHLORINATION ROOM)
Percentage Payment to
Item Description of Items
1 CHLORINATION ROOM/ PUMPING STATION/
STAFF QUARTERS / PANEL ROOM
a. On approval of Designs 2.0 % of Quoted rate
b. On completion of Excavation & base slab 18.0 % of Quoted rate
c. On completion of vertical wall up to plinth
20.0 % of Quoted rate
(incl. Screen chamber)
d. Full supporting structure incl. ring beam and
15.0 % of Quoted rate
e. On completion of pump house incl. fixing
doors 10.0 % of Quoted rate
f. Plastering inside & outside with epoxy paint
etc 10.0 % of Quoted rate
(completed with all respects)
g. Painting of letters, MS ladder pipe, railing and
all miscellaneous items such as snowcem
15 % of Quoted rate
paints in three coats etc. (completed with all
h. After Completion 10 % of Quoted rate
DATA SHEET FOR CHLORINATION ROOM
Sr. DETAILS Data for Chlorination Room
1 Location/ No. 1. Kothasana SHW
Different SHW of Satlasana & 2. Talegadh SHW
Kheralu Taluka Villages.
4. Shahupura SHW
2 Carpet area of the 24 Sq.mt. Each
Chlorination Room (Sq. mt)
3 Plinth level of Staff Qtrs. Avg. G.L. + 1 Mt. Ht. Minimum or as per Design
4 Live Load on the Pump Floor
Level (kg/sqm.)
5 Live load for non accessible 75 kg/m2
pump house roof (kg/sqm)
6 Thickness of Masonry
As Per Design Approved
7 Flooring Anti-skid ceramic tiles/Kota stone
Acid resistant flooring near chlorination area
complete with base preparation and curing or As Per
Instruction of Engineer In Charge.
8 Door M. S. Angel Frame & 35 mm thick Flush Shutter
or As Per Instruction of Engineer In Charge
9 Window Aluminum glazed Three Track sliding window
with MS grill for Protection Purpose or As Per
Instruction of Engineer In Charge
10 Type of structure RCC frame work with brick masonry wall
11 Neutralization pit As per design and standard requirement with
White Glazed Tiles
12 Inside Plaster 15 mm thick Double Coat Mala Plaster CM 1:4 or
As Per Approve Design & Instruction of Engineer
13 Outside plaster 20 mm thick Sand Faced Cement Plaster CM 1:3
or As Per Approve Design & Instruction of
Engineer In Charge.
14 Colour 2 Coat Weather Proof Exterior (Apex) paint with
Primer should be applied.(Approved Brand) &
Internal – Distemper of approved brand and
15 Grade of Concrete RCC –M250 or As Per Approve Design
16 Steel TMT Steel Fe-500 Confirming to Relevant IS or As
Per Approve Design.
17 Electrification Internal as per requirement or As Per Instruction
of Engineer In Charge.
18 Plumbing Internal UPVC with CP brass sanitary ware
19 Other Requirement All other Requirement as per Price bid &
specifications Including all obligatory
requirement of department. With water proofing
Treatment & as per EIC.
20 Tender / Structural Design "The structure shall be designed for Seismic
Wording Zone-III conditions in accordance with IS
(Part-1): 2016 and relevant provisions of IS
456, IS 13920, and other applicable Indian
Standard Codes."
Design Parameters for Mehsana
Seismic Zone: Zone III
Zone Factor (Z):
Risk Level: Moderate seismic risk
Design Code: IS 1893 (Part 1):
Ductile Detailing: IS 13920 should be followed
for RCC structures wherever applicable.
Signature of Bidder Executive Engineer
Public Health Dharoi Project Division
GWSSB, Mahesana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Techbid.pdf
02 Pricebid.pdf
03 Part B and C Specification.pdf
04 Gen. Tech. Civil Spec.pdf
05 Ele. Gen. Spec.pdf
06 RWSS Map.pdf
Ann 3 shramyogi GR.pdf
Ann 4 Royalty GR .pdf
Ann 5 DOC-20230131-WA0039 240625 162832.pdf
Ann 8 Letter for nCode Mobile App.pdf
Annexure 2 Purchase Policy.pdf
Annexure 7 Min labour wages.pdf
Annexure_1 DMO 2941 01- Apr-2026_744.pdf
Download all tender documents and submit your bid