| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC HIMAHIRANS POCHAKONAM EZHUKONE PO KOLLAM | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.6 L+₹55,588.59 (11.1%)Rejected-AOC LSGD SECTION SOORANAD NORTH | KOTTAYAM | KERALA | 686001 | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Bid documents is not signed properly |
Tender Value
₹5.9 L
EMD Value
₹14,800
Closing Date
26 Dec 2024, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer KIP(RB) Sub division no 26
GENERAL KIP RB Urgent rectification works from Ch 700m of Muthupilakkad Minor Distributary General Civil Work
2024_Irrig_717109_1
RR/PII/TR/1562/2024_5_11_10/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Karunagappally
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,305
Yes
₹14,800
Yes
4 Feb 2025
17 Dec 2024
28 Dec 2024
17 Dec 2024
26 Dec 2024
17 Dec 2024
Amount
Rectification work on canal
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.28:Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound in expansion joints.
M FAIZAL (BID ID -2035035)
Bidder Name
M FAIZAL
Hiran mohan
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1131971.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .