| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC HPSEBL THALOUT | KANGRA | HIMACHAL PRADESH | 176201 | L1 | Accepted-AOC AOC | |
| 2 | L2₹8.4 L+₹90,751.24 (12.1%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹7.0 L
EMD Value
₹14,100
Closing Date
21 Oct 2020, 5:00 pmClosed
Executive Engineer, HPPWD Division Sangrah
Executive Engineer, HPPWD Division Sangrah
C/O PCC Road Side drain in Km. 3/00 to 6/00)
2020_PWD_41412_8
6059-6109
Open Tender
Civil Works
Item Rate
90 days
Sangrah
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
Executive Engineer, HPPWD Division Sangrah
₹14,100
26 Nov 2020
9 Oct 2020
22 Oct 2020
9 Oct 2020
21 Oct 2020
9 Oct 2020
Amount
Excavation in earth work in in hilly area all height and depths and in all kinds of soils including saturated soil comprising of mixed soil ordinary rock and hard rock. All works road rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc, and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock( where blasting is prohibited).All earth work in cutting/ excavation, including rock excavation shall be carried out true to lines grades sides slopes, width, camber, super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge in conformity with the requirement of technical specification of Rural road August 2004 and clause 16.2 of general conditions for contract to achieve designed formation width including hauling and stacking of materials useful for construction at suitable sites and safe disposal of unserviceable cut material and specified manner, including arrangement of dumping site trimming, filling of unevenness blind age and finishing of the road to specified dimensions including disposal of surplus materials with all leads, and lifts at the location specified in the tender document or as directed by the Engineer-in-Charge for smooth riding. The recovery for stones where useful or not 2.07 (Two point zero seven)cubic metre @ 170/- (Rs. one hundred Seventy) @ 170/- (Rs. one hundred Seventy) only per cubic metre shall be effected on pro-rata basis. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him at his on cost in all cases including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.
Earth work in excavation for structures in all depths as per drawing and Technical specification of Ministery of Rural Development for rural roads August 2004 (Two thousand four) C-305-1(Clause-three hundred five point one) including setting out construction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and botttom and back filling in tranches with excavated suitable materials all work of rock cutting by blasting shall be carried out by taking all necessary precaution against soil erosion damages to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiesling and wedging out rock (where blasting is prohibited) all earth work in cutting.excavation including rock excavation shall be carried out true to lines grades,side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places, in specified manner systemathically with due consideration to avoiding adverse effects on environment, trimming filling of unevenness blind age and finishing of the road to specified dimension to the entire satisfaction as directedby the Engineer-in-charge. If the foundatioin of the structure is in an area with stangnat water or water is met with in the excavation due to spring seepage rain and other courses it shall be remove by suitable diversion boilingout or pumping as directed and the area of foudation or embankment shall be kept dry any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 PCC.Grade M-10(Ten) nominal mix including all leads,lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge.
sukhpal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .