Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹56,524Accepted-AOC | ₹56,524 Quoted ₹56,525 | 1 | Accepted-AOC Less than estimate |
| 2 | 2₹59,541Rejected-AOC | ₹59,541 | 2 | Rejected-AOC Above estimate |
| Sl No | Description | Qty | Unit | G BALAJI L2 | C AZHAGESAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in all classes of soils as per 20B foundation Etc., Complete | 4 | m3 | 200 ₹800 | 184.5 ₹738 |
| 2.00 | Plain Cement concrete 1:4:8 (one cement, four M.sand,eight aggregate) using 40mm gauge hand broken granite stone jelly rrom approved quarry including cost of materials conveyance charges and all labour charges etc., complete | 1 | m3 | 5,650 ₹5,650 | 5,340 ₹5,340 |
| 3.00Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | |||||
| 3.01 | Sides | 9 | m2 | 465 ₹4,185 | 459 ₹4,131 |
| 3.02 | Slab Bottom | 9 | m2 | 1,350 ₹12,150 | 1,020 ₹9,180 |
| 4.00 | Plain Cement concrete 1:2:4 (one cement, Two M.sand, four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 3 | m2 | 6,850 ₹20,550 | 6,790 ₹20,370 |
| 5.00 | Supply and fabricating and placing in position MS (Or) R.T.S bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors | 120 | Kg | 89.88 ₹10,785.60 | 89.88 ₹10,785.60 |
| 6.00 | Reinforced cement concrete 1:11/2 :3 Mix (one part cement, one and half part sand and three part of aggregate ) Using 20 mm sizw ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing. laying and curing but excluding cost of reinforment etc., complete with std specifications. (TNDSS Bi:30V, VI (S3)VII-3 | 1.2 | m3 | 9,850 ₹11,820 | 8,960 ₹10,752 |
| 7.00 | Fininshing the top of flooring with granothatic flooring with cement concrete 1:2:4 (One Cement, Two M.Sand and Four Aggregate) Using 10 to 12 mm stone chips - 25 nn thick etc., complete | 2 | m2 | 175 ₹350 | 164 ₹328 |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
12 Jan 2026, 3:00 pmClosed
Executive Officer
Ambalakara street, S.Kannanur, Samayapuram, Trichy Dt.
Repair and Maintanance 2 Nos of Bathing Ghats at Ward No.12 Indhira colony Peruvalai Channel in S.Kannanur Town Panchayat
2026_DTP_639646_1
General Fund 932-9/2025 A1
Open Tender
Civil Works - Others
15 days
S.Kannanur Town Panchayat
Please refer Tender documents.
1 document required · 1 mandatory
₹708
₹3,500
9 Feb 2026
6 Jan 2026
12 Jan 2026
6 Jan 2026
12 Jan 2026
6 Jan 2026
Amount
Earth work excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in all classes of soils as per 20B foundation Etc., Complete
Plain Cement concrete 1:4:8 (one cement, four M.sand,eight aggregate) using 40mm gauge hand broken granite stone jelly rrom approved quarry including cost of materials conveyance charges and all labour charges etc., complete
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Sides
Slab Bottom
Plain Cement concrete 1:2:4 (one cement, Two M.sand, four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication.
Supply and fabricating and placing in position MS (Or) R.T.S bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors
Reinforced cement concrete 1:11/2 :3 Mix (one part cement, one and half part sand and three part of aggregate ) Using 20 mm sizw ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing. laying and curing but excluding cost of reinforment etc., complete with std specifications. (TNDSS Bi:30V, VI (S3)VII-3
Fininshing the top of flooring with granothatic flooring with cement concrete 1:2:4 (One Cement, Two M.Sand and Four Aggregate) Using 10 to 12 mm stone chips - 25 nn thick etc., complete
G BALAJI (BID ID -1557954)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_765792.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_765792.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid