Tender Value
₹29 L
EMD Value
₹29,000
Closing Date
16 May 2023, 3:00 pmClosed
Block Development Officer VP
Panchayat Union Office Thiruverumbur
Construction of 1,00,000 Litres Capacity OHT at Thiruvengada Nagar in Krishnasamuthiram Panchayat in Thiruverumbur Block under JJM 2022-2023
2023_RDTN_309936_5
B/4074/2022 Dated 24.04.2023
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruverumbur
Please Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹29,000
Yes
19 May 2023
11 May 2023
16 May 2023
11 May 2023
16 May 2023
11 May 2023
Amount
Construction of 1,00,000 Litre Capacity OHT at Thiruvengada Nagar in Krishnasamuthiram Panchayat. Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., above 2.00m Depth
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL
Square Column from Below GL to up to 3.30m Ht
Square Column from 3.30m to 4.30m Ht
Brace Beam at 3.55m Ht
Square Column from 4.30m to 5.30m Ht
Square Column from 5.30m to 6.30m Ht
Square Column from 6.30m to 7.30m Ht
Square Column from 7.30m to 8.30m Ht
Brace Beam at 7.35m Ht
Square Column from 8.30m to 9.30m Ht
Square Column from 9.30m to 10.30m Ht
Square Column from 10.30m to 10.90m Ht
Circular Column from Below GL to up to 3.30m Ht
Circular Column from 3.30m to 4.30m Ht
Circular Column from 4.30m to 5.30m Ht
Circular Column from 5.30m to 6.30m Ht
Circular Column from 6.30m to 7.30m Ht
Circular Column from 7.30m to 8.30m Ht
Circular Column from 8.30m to 9.30m Ht
Circular Column from 9.30m to 10.30m Ht
Circular Column from 10.30m to 10.90m Ht
Curved Surface for Floor Slab at 11.30m Ht
Curved Surface for Cover Slab at 11.30m Ht
Curved Surface for Side Wall
Floor beam sides at 10.90-11.30m
Floor beam sides at 11.30-11.60m
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for FOOTING
Column upto GL
Brace Beam at GL
Column above GL to 4.50m Ht
Brace Beam at 3.55m Ht
Column from 4.50m to 7.32m Ht
Brace Beam at 7.35m Ht
Column from 7.32m to 10.98m Ht
Column, Beam and Floor Slab at 10.98m Ht
Side Wall and Roof Slab at 14.80m Ht
Center Column at 14.15m Ht
Distempering the wall with one coat using primer over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete.
Refilling the foundation with excavated earth including watering and consolidation etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A MANIKANDAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .