Tender Value
₹15.7 L
EMD Value
₹16,000
Closing Date
13 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Shedhi Irrigation Division Nadiad
Constructing Protection Wall On Motiya Vahero Near Vadala Village.
290873
15 of 2025-26
Open
Civil Works - Canal
Nadiad
6 documents required · 4 mandatory · 2 optional
₹900
Yes
Executive Engineer Shedhi Irrigation Division Nadiad
₹16,000
Yes
27 Mar 2026
27 Mar 2026
27 Mar 2026
13 Apr 2026
27 Mar 2026
Bill of Quantity
Name of Constructing Protection Wall On Motiya Vahero Near Vadala Village.
Item No. Item of work Unit Qty Amount (Rs.)
Figure In Words
Earth work in embankment using selected soil,
soft & hard murrum excavated from approved
borrow area / village tanks etc. Including
conveying, spreading in uniform layers, breaking
clods and dressing to the designed canal section
1 Cum 813.00 91.75 Seventy
etc. with lead upto 500m and all lift. Five Paise
(For canals having capacity beyond 300 Cusec) ( Only
By Machinery watering.
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft & hard Rs. One
murrum etc. in dry condition including
depositing the excavated stuff in uniform layers
in banks or as and where directed etc. complete Only
for lead upto 500 m and all lift. (BY
MACHINERY)Excluding
Compaction for makingdewatering.
embankment for canal by
laying in regular layers of 15 cm in thickness
including breaking clods to 25 mm size incl. light
rolling by suitable rollers with slight watering to Seven &
3 facilate rolling and dressing the side slopes etc. Cum 813.00 27.70
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks Rs. Three
centering, scaffolding, compaction by vibrator, Thousand
curing as directed with all lead & lift etc complete Seven
Without Dewatering and excluding cost of steel Hundred
reinforcement.(d) C. C. Nominal Mix, M-15 and Fifty Four
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for Rs. Three
C.C./R.C.C work incl. necessary formworks Thousand
centering, scaffolding, compaction by vibrator, Nine
curing as directed with all lead & lift etc complete Hundred
Without Dewatering and excluding cost of steel Thirty Five
reinforcement.(c) C. C. Nominal Mix, M-15 and Only
Bill of Quantity
Name of Constructing Protection Wall On Motiya Vahero Near Vadala Village.
Item No. Item of work Unit Qty Amount (Rs.)
Providing & Placing in position reinforcement Rs. Eighty
bars including cutting, bending, welding joints Two
5 where necessary, hooking etc. complete as per MT 1.80 82019.00 Thousand
drawing for all lead and lifts. TMT / CRS Ninteen
Back filling the foundation trenches around the
structures etc with selected excavated stuff
including watering, ramming, compacting etc.
complete. (By Machinery)
Providing and laying in position 110 mm dia (6
kgf/sqcm) P.V.C. Pipe for weep holes with non Rs. Two
corroding jali in abutments, wing walls, retaining Hundred
7 walls etc. complete. Meter 75.00 262.50 Sixty Two &
Dewatering the foundation trenches during
excavation, laying foundation concrete, Rs. Fifty
8 masonary etc. till completion and diversion of Hp-hr 125.00 52.50 Two & Fifty
surface and sub surface water etc. complete as Paise Only
Rs. Fifteen Lac Seventy Four Thousand Six Hundred Fourteen & Thirty Five Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs. ______
Net Tender amount Rs. ______________ Net Tender amount Rs.
1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 - GST and Income tax TDS will be deducted at a source while making payments of bills
4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC
10/2017CementConsumption /16/CDate:11/05/2017as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Bill of Quantity
Name of Constructing Protection Wall On Motiya Vahero Near Vadala Village.
Item No. Item of work Unit Qty Amount (Rs.)
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as directed
by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in
inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold good
for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt = Running
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs. 5483.37/M.T. (Rate as per CGWRD SOR 2023-
Signature of agency
Tedner Clerk Deputy Executive Engineer
Shedhi Irrigation Division Meshwo Irrigation Sub Division
Divisional Accoutant Executive Engineer
Shedhi Irrigation Division Shedhi irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD Vadala Village.pdf
2. Sch-B Vadala Village.pdf
3. Itemwise Specification.pdf
4. General Technical Specification.pdf
5. Wing Wall Drawing.pdf
Tender Notice No.15 of 2025-26.pdf
Download all tender documents and submit your bid