Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC CHITTATTUVADAKKEL THIRUVAMBADY | THIRUVAMBADY | KERALA | ₹1.7 L | L1 | Accepted-AOC Accepted Vide Resolution No.2/1 dtd.25/02/2026 of THIRUVAMBADY GP |
| 2 | L2₹1.7 LRejected-AOC | ₹1.7 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| 3 | L3₹1.8 LRejected-AOC AJITH BHAVAN KANNANALLOOR KOLLAM KERALA | PATHANAMTHITTA | KERALA | 689694 | ₹1.8 L | L3 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | SARATH SEBASTIAN L1 | SHINIL L2 | SAJITH L3 |
|---|---|---|---|---|---|---|
| 1.00Road Retarring | ||||||
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 98.27 | sqm | 382 ₹37,539.14 | 382.8 ₹37,617.76 | 402 ₹39,504.54 |
| 1.00 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 447 | sqm | 18 ₹8,046 | 18.72 ₹8,367.84 | 19.7 ₹8,805.90 |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 447 | sqm | 275 ₹1.2 L | 276 ₹1.2 L | 289.8 ₹1.3 L |
Tender Value
₹1.7 L
EMD Value
₹4,234
Closing Date
23 Feb 2026, 6:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF ASSISTANT ENGINEER , THIRUVAMBADY GP
THIRUVAMBADY GP 297/26 THIRUVAMBADY MUNDAMALA ROAD RETARRING
2026_LSGD_836449_1
10/2025-26/AE/LID EW/TDY
Open Tender
Civil Works - Roads
THIRUVAMBADY GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹4,234
Yes
8 May 2026
16 Feb 2026
25 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
Road Retarring
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.2pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1408037.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1408037.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid