Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.5 CrAdmitted-Finance 04 3 | PRATAPGARH | RAJASTHAN | 312604 | -7.86% | ₹17.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.2 CrAdmitted-Finance | -3.78% | ₹18.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹18.8 CrAdmitted-Finance | -0.77% | ₹18.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹20.0 CrAdmitted-Finance | +5.51% | ₹20.0 Cr | L4 | Admitted-Finance |
Tender Value
₹19.0 Cr
EMD Value
₹37.9 L
Closing Date
24 May 2026, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Construction work of High Level Bridge on Mej River on Uniyara-Bijoliya Via Indergarh-Lakheri-Bundi Road in District Bundi.
2026_CEPWD_555806_1
ACE PWD ZONE KOTA NITNO-02/2026-27
Open Tender
Civil Works
450 days
BUNDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
20000 EE PWD DIV. BUNDI
₹37.9 L
Yes
ACE PWD ZONE KOTA
3 Jun 2026
4 May 2026
26 May 2026
4 May 2026
24 May 2026
4 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle | 1.71 | Hectare | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 2,778.3 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge For 10 Km. | 7,408.8 | Cum | 1 | ₹7,401.39 | BI01010001010000000000000515BI0100001113 |
| 4 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 4,630.5 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 5 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means with a lead of 1 Km. For Grading-II Material | 1,389.15 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 6 | Dry Lean Cement Concrete Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 1,183.35 | Cum. | - | - | BI01010001010000000000000515BI0100001113 |
| 7 | Cement Concrete Pavement with Slip Form Paver Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic computerised compatible with Printer and Pen Drive Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Slip Form Paver (laying and fixing of 150 micron thick polythene film) and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 should have minimum flexural strengthen of 4.5 MPa, with all required equipments. (Dowel Bars and Tie Bars will be paid seprately). | 2,160.9 | Cum. | - | - | BI01010001010000000000000515BI0100001113 |
| 8 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth upto 3 metre | 1,959.46 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 9 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In hard soil Depth upto 3 metre | 1,001.6 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 10 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. By blasting including blasting material in hard rock | 2,504 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.55 MB
Tendernotice_2.pdf
PDF • 1.39 MB
Tendernotice_3.pdf
PDF • 11.56 MB
CERTIFICATE-02.pdf
Tender Documents • 0.54 MB
RATE-ANALYSIS-02.rar
Tender Documents • 0.45 MB
TENDER-DOCUMENT-02.pdf
Tender Documents • 1.33 MB
POST-QUALIFICATION-02.pdf
Tender Documents • 4.69 MB
BOQ_989833.xls
BOQ • 0.31 MB