Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹49,000
Closing Date
4 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Vadnagar Nagarpalika
Construction of Shed work at Sulipur vermicomposting at Vadnagar nagarpalika area, Vadnagar Dist:- Mehsana( Second Attempt)
289740
24/Vad/2025-26/2 Second Attempt
Open
Civil Works - Others
Mehsana
1 document required · 0 mandatory · 1 optional
₹1,500
Yes
Chief Officer , Vadnagar Nagarpalika , Vadnagr
₹49,000
Yes
24 Mar 2026
24 Mar 2026
24 Mar 2026
4 Apr 2026
24 Mar 2026
PLATFORM SHED WORK AT VADNAGAR
Platform & Shed
It. No. Quantity Discription Rate Total Rate with 1% Labour cess Unit Amount Rs
1 100.00 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. { R&B MEHSANA SOR Item No.04001A } 121.770 122.99 Cum 12,298.77
2 200.00 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth { R&B MEHSANA SOR Item No.05004A } 2617.180 2643.35 Cum 528,670.36
3 500.00 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA } 4398.140 4442.12 Cum 2,221,060.70
4 88.00 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. { R&B MEHSANA SOR Item No.04001A } 121.770 122.99 Cum 10,822.92
5 5.63 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth { R&B MEHSANA SOR Item No.05004A } 2617.180 2643.35 Cum 14,887.36
6 33.46 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA } 4398.140 4442.12 Cum 148,642.27
7 1.34 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA } 4398.140 4442.12 Cum 5,936.90
8 105.30 Steel work, welded in built up sections framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. (D) In trussses and trussed purlins, upto 25 M. span and 15 M. ovarall height. (R&B MEHSANA SOR Item No. 1102DA) 9974.950 10074.70 Q 1,060,865.86
9 1200.00 Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and nuts 8mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead complete excluding the cost of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet. { R&B MEHSANA SOR Item No.15001A } 726.920 734.19 Sqm 881,027.04
Total Rs. 4,884,212.16
2% Contigency 97,684.24
TOTAL AMOUNT 5,861,054.60
Prepared By Municipal Engineer Chief Engineer
Vadnagar nagarpalika Vadnagar Nagarpalika
MEASUREMENT SHEET
PLATFORM SHED WORK AT VADNAGAR
PLATFORM AND SHED
Item No. Discription No L B H Total Qty. Unit
1 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. { R&B MEHSANA SOR Item No.04001A }
For Platform 1 20 50 0.1 100 Cum
2 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth { R&B MEHSANA SOR Item No.05004A } 20
For Platform 1 20 50 0.2 200 Cum
3 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA }
For Platform 1 20 50 0.5 500 Cum
4 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. { R&B MEHSANA SOR Item No.04001A } 50
For Shed Footing (11 Nos.) 11 2 2 2 88 Cum
5 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth { R&B MEHSANA SOR Item No.05004A }
For Shed Footing (11 Nos.) below footing 11 1.6 1.6 0.2 5.632 Cum
6 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA }
For Shed Footing (11 Nos.) 11 1.3 1.3 1.8 33.462 Cum
7 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA }
RCC Pedestal / Column 11 0.45 0.45 0.6 1.3365 Cum
8 Steel work, welded in built up sections framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. (D) In trussses and trussed purlins, upto 25 M. span and 15 M. ovarall height. (R&B MEHSANA SOR Item No. 1102DA)
MS Colomun LS 12x11=132RM 3.2 MT
Roof Trusses / Rafters LS 20x5 =45 RM 2.9 MT
MS Purlins LS 20x6 =54 RM 2.4 MT
Bracings, Cleats, Base Plates LS 2.03 MT
In Quintle 105.30 Q
9 Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and nuts 8mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead complete excluding the cost of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet. { R&B MEHSANA SOR Item No.15001A }
GI SHEET 20 x 50 1000 Sqm
Slope Factor 1000 x 1.2 1200 Sqm
BILL OF QUANTITY
Construction of shed work at Sulipur vermicompost at Vadnagar nagarpalika area vadnagar Dist - Mehsana
It. No. Quantity Discription Rate Rate Rate in Words Unit Amount Rs
1 100.00 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. { R&B MEHSANA SOR Item No.04001A } 121.770 122.99 One hundred twenty two Cum 12,298.77
2 200.00 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth { R&B MEHSANA SOR Item No.05004A } 2617.180 2643.35 two thousand six hundred fourty three Cum 528,670.36
3 500.00 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA } 4398.140 4442.12 four thousand four hundred fourty two Cum 2,221,060.70
4 88.00 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. { R&B MEHSANA SOR Item No.04001A } 121.770 122.99 one hundred twenty two Cum 10,822.92
5 5.63 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth { R&B MEHSANA SOR Item No.05004A } 2617.180 2643.35 two thousand six hundred fourty three Cum 14,887.36
6 33.46 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA } 4398.140 4442.12 four thousand four hundred fourty two Cum 148,642.27
7 1.34 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level { R&B MEHSANA SOR Item No.05024BA } 4398.140 4442.12 four thousand four hundred fourty two Cum 5,936.90
8 105.30 Steel work, welded in built up sections framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. (D) In trussses and trussed purlins, upto 25 M. span and 15 M. ovarall height. (R&B MEHSANA SOR Item No. 1102DA) 9974.950 10074.70 ten thousand seventy four Q 1,060,865.86
9 1200.00 Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and nuts 8mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead complete excluding the cost of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet. { R&B MEHSANA SOR Item No.15001A } 726.920 734.19 seven hundred thirty four Sqm 881,027.04
Total Rs. 4,884,212.16
2% Contigency 97,684.24
TOTAL AMOUNT 5,861,054.60
I / We am / are willing to carry out the work at …………….% below / above ( Should be written in figure and words ) of the tender rates mentined above Amount of my / our tender works out as under.
Tender amount Rs…………………. +
Add…….% above Rs…………………. Less…….% below Rs………………….
Net in words Rs……………….... Net in words Rs………………....
Credit for Dismental material and Recovery (Fix Deduction) Rs0 (RA BILL)
1 The Contractor Shall Exhibit a board with detailed Specification and details of work as directed by the Engineer-in-Charge for which no extra payment shall be made.
2 The Labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted as a source while making payments of bills.
4 In all R.C.C.Items in Rate Analysis Standard Cement Consumption has been taken as per GOVT.G.R.PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R.therefore in R.C.C. items where there is a changes as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor
Vadnagar Nagarpalika
VADNAGAR NAGARPALIKA,VADNAGAR
Name of Work :-Bid Documents for Construction of Shed work at Sulipur vermicompost at Vadnagar nagarpalika area, Vadnagar Dist:- Mehsana
SCHEDULE - ABSTRACT
Sr. No. Description Estimated Cost Tender Cost
Construction of Shed work at Sulipur vermicompost at Vadnagar nagarpalika area, Vadnagar Dist:- Mehsana 4884212.16
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under Estimated amount put to tender Estimated amount put to tender Deduct………% below Add… % Above
In words In words five seventy four laks eighty four thousand three hundred thirty eight
The 18% GST will be Paid Separately for the tender rate shown in the Schedule B
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer‐In‐ Charge for which no extra payment shall be made.
The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
GST and Income tax TDS will be deducted at a source while making payments of bills
Signature of Contractor. Vadnagar Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender shed sbd.docx
DOCX
2. Material spesification.pdf
2. Specification for road works.pdf
3. ROAD WORK SPECIFICATIONS.pdf
4. GR.pdf
5.G R2.pdf
6.G.R.pdf
7.G.R.pdf
8.G.R.pdf
9.G.R.pdf
shed 55lkh boq.xlsx
XLSX
shed Musurement.pdf
Price bid shed.xls
XLS
Download all tender documents and submit your bid