| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC L1 1st lowest | |
| 2 | L2₹9.2 L+₹55,460.84 (6.44%)Rejected-AOC KAVIKKUNNEL H KUNNACKAL P O MUVATTUPUZHA | MUVATTUPUZHA | KERALA | L2 | Rejected-AOC L2 2nd lowest | |
| 3 | L3₹9.5 L+₹87,300.25 (10.1%)Rejected-AOC | L3 | Rejected-AOC L3 3rd lowest | |
| 4 | L4₹11.2 L+₹2.5 L (29.6%)Rejected-AOC | L4 | Rejected-AOC L4 4th lowest |
Tender Value
₹11.8 L
EMD Value
₹29,650
Closing Date
1 Nov 2019, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Additional Irrigation Subdivision, Aluva
Rectification works
2019_Irrig_279836_2
AEE/AISD/25/ET/2019-20/S Tender
Open Tender
Civil Works - Others
Item Rate
120 days
Pallipuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,100
online
₹29,650
Yes
17 Feb 2020
25 Oct 2019
6 Nov 2019
25 Oct 2019
1 Nov 2019
25 Oct 2019
Amount
Scheme 1 from Ch:1080 to 1200m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc. complete as per the direction of the departmental officer at site.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
Scheme 2 from Ch: 1200m to1 1320m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
Scheme 3 from Ch: 1320m to 1400m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
Scheme 4 from Ch: 1400m to 1490m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
scheme 5 from Ch: 1490m to 1610m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
scheme 6 from Ch: 1610m to 1720m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
scheme 7 from Ch:1720m to 1870m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc. complete as per the direction of the departmental officer at site.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
scheme 8 from Ch:1870m to 2000m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
scheme 9 from ch:2000m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site.
George Kutty
T A JOSEPH
Lothaire Enterprises Private Limited
Bidder Name
T A JOSEPH
George Kutty
P.C TOMY
Lothaire Enterprises Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_430843.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .