| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.5 LAccepted-AOC D NO 49 23 27 A FLAT NO 301 3RD FLOOR SRI SAI TIRUMAL ENCLAVE LALITHANAGAR VISAKHAPATNAM 530 016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | ₹72.5 L | L1 | Accepted-AOC Lowest Bid Accepted |
| 2 | L2₹76.5 L+₹4 L (5.52%)Rejected-Finance | ₹76.5 L+₹4 L (5.52%) | L2 | Rejected-Finance Not Being Lowest Bidder |
| 3 | L3₹84.9 L+₹12.4 L (17.2%)Rejected-Finance | ₹84.9 L+₹12.4 L (17.2%) | L3 | Rejected-Finance Not Being Lowest Bidder |
| 4 | L4₹86.0 L+₹13.5 L (18.7%)Rejected-Finance | ₹86.0 L+₹13.5 L (18.7%) | L4 | Rejected-Finance Not Being Lowest Bidder |
| 5 | L5₹86.2 L+₹13.7 L (18.8%)Rejected-Finance | ₹86.2 L+₹13.7 L (18.8%) | L5 | Rejected-Finance Not Being Lowest Bidder |
Tender Value
₹92 L
EMD Value
₹1.6 L
Closing Date
26 Jun 2023, 6:00 pmClosed
Col KK Srivastava, Commander Works Engineer
Commander Works Engineers, Station Road, Visakhapatnam - 530 004
GRASS CUTTING AROUND OPERATIONAL AREA AND ALLIED WORKS AT INS DEGA AIRFIELD UNDER GE ND, VISAKHAPATNAM
2023_MES_599245_1
82341/E8
Open Tender
Civil Works
Item Rate
270 days
Visakhapatnam
Class C
category a i
9 documents required · 9 mandatory
₹1,000
Garrison Engineer Naval Depot
₹1.6 L
Yes
26 Jul 2023
29 May 2023
28 Jun 2023
29 May 2023
26 Jun 2023
19 Jun 2023
29 May 2023 - 5 Jun 2023
Amount
Cutting Bushes like Kikar or other type thick bushes covered area and removing roots and making good the disturbed surface by filling along the sides of Runway shoulders by Mechanically using JCB and Operator and One Un-skilled labour along with Fuel, lubricants, spares and renewal of tyres/tubes as required for Eight Hours per Day including removing of bushes, roots, loose items to a distance exceeding 250m but not exceeding 500m from the site complete all as directed. Note: [a] Area shall be as decided by the Engineer-in-Charge and representative of users. [b] One JCB and Operator and One Un-skilled labour for Eight Hours per Day shall be treated as One Job. [c] Proper care shall be taken while removing the roots etc. to avoid any damage to the existing underground cables and pipelines etc. Damage if any occurs to the underground cables and pipelines, the same shall be made good immediately to match the existing and to restore the services and rate quoted is deemed to be including the same. [d] The work is required to be executed along Main/Secondary Runway. Therefore, the work shall be executed during non-flying hours either during Day or Night without causing any disturbance for flying. [e] The work is required to be executed in highly restricted area. [f] Proper safety arrangement, equipment shall be provided by the contractor for workmen. [g] The rate quoted shall be deemed to be considering all the above provisions and nothing shall be paid extra on this account.
Maintenance of Airfield Shoulders by deploying Tractor with suitable capacity Jungle Zim with Tractor Operator for cutting of grass and One Helper for sweeping grass after cutting of Grass, bushes, small plants of any type along the sides of Runway Shoulders and Airfield Areas including supply of Fuel, lubricants, spares and renewal of tyres/tubes as required for smooth operation of equipment deployed including maintenance of Tractor, Jungle Zim, insurance and license fees including removing of debris to a distance exceeding 250m but not exceeding 500m from the site complete all as directed. Note: [a] Area shall be as decided by the Engineer-in-Charge and representative of users. [b] Jungle Zim shall be made available at all times at site and the same may be increased to required numbers as per site requirement. [c] An area of 10000 Square Metres shall be treated as One Job for measurement and payment purpose irrespective of the Plant, Machinery and Manpower employed for each job. [d] The work is required to be executed along Main/Secondary Runway. Therefore, the work shall be executed during non-flying hours either during Day or Night without causing any disturbance for flying. [e] The work is required to be executed in highly restricted area. [f] Proper safety arrangement, equipment shall be provided by the contractor for workmen. [g] The rate quoted shall be deemed to be considering all the above provisions and nothing shall be paid extra on this account.
Periodic Supply of Hand held Grass cutting Machine of Make Honda or equivalent with Machine operator and one Helper for Cutting and Sweeping Grass after cutting of Grass, bushes, small plants of any type along the sides of Dispersal Area, Taxi Track, Runway, Shoulders and Airfield areas throughout the year, including supply of Fuel, lubricants, spares, renewal of blades as required including maintenance and repairs to Machine and trade insurance and license fees including removing of debris to a distance exceeding 250m but not exceeding 500m from the site complete all as directed. Note: [a] Area shall be as decided by the Engineer-in-Charge and representative of users. [b] One No. of Hand held Grass cutting Machine shall be made available at all times at site and the same may be increased to required numbers as per site requirement. [c] An area of 1000 Square Metres shall be treated as One Job for measurement and payment purpose irrespective of the Plant, Machinery and Manpower employed for each job. [d] The work is required to be executed along Main/Secondary Runway. Therefore, the work shall be executed during non-flying hours either during Day or Night without causing any disturbance for flying. [e] The work is required to be executed in highly restricted area. [f] Proper safety arrangement, equipment shall be provided by the contractor for workmen. [g] The rate quoted shall be deemed to be considering all the above provisions and nothing shall be paid extra on this account.
Removing silt, grit, mud and other materials from drains of any description in foul condition including removing materials / debris to a distance exceeding 250m but not exceeding 500m complete all as directed. Note: [a] Area shall be as decided by the Engineer-in-Charge and representative of users. [b] The work shall be carried out using Tata Hitachi EX 60 / 70 / 100 Excavator or any other Machinery as required at site. [c] Tata Hitachi EX 60 / 70 / 100 Excavator including Operator for Eight Hours per Day shall be treated as One Job. [d] Proper care shall be taken while removing the silt, grit, mud and other materials to avoid any damage to the existing underground cables and pipelines etc. Damage if any occurs to the underground cables and pipelines, the same shall be made good immediately to match the existing and to restore the services and rate quoted is deemed to be including the same. [e] The work is required to be executed along Main/Secondary Runway. Therefore, the work shall be executed during non-flying hours either during Day or Night without causing any disturbance for flying. [f] The work is required to be executed in highly restricted area. [g] Proper safety arrangement, equipment shall be provided by the contractor for workmen. [h] The rate quoted shall be deemed to be considering all the above provisions and nothing shall be paid extra on this account.
Grading and Levelling of the area around the Runways and Taxiways in the Airfield by deploying One Tractor Dozer with ploughing set and One chain saw cutting machine including Operators and One helper per Day including removing materials / debris to outside MD land complete all as directed. [a] Area shall be as decided by the Engineer-in-Charge and representative of users. [b] One Tractor Dozer with ploughing set and One chain saw cutting machine including Operators and One helper for Eight Hours per Day shall be treated as One Job. [c] Proper care shall be taken while removing the silt, grit, mud and other materials to avoid any damage to the existing underground cables and pipelines etc. Damage if any occurs to the underground cables and pipelines, the same shall be made good immediately to match the existing and to restore the services and rate quoted is deemed to be including the same. [d] The work is required to be executed along Main/Secondary Runway. Therefore, the work shall be executed during non-flying hours either during Day or Night without causing any disturbance for flying. [e] The work is required to be executed in highly restricted area. [f] Proper safety arrangement, equipment shall be provided by the contractor for workmen. [g] The rate quoted shall be deemed to be considering all the above provisions and nothing shall be paid extra on this account.
srisampathassociates
Sri Surya Enterprises
GAGANSRI INFRA
SOUTHERN BUILDERS
S A R CONSTRUCTIONS
M/S SRI VENKATA BHAVANI CONSTRUCTIONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .