| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LAccepted-AOC | ₹27.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.4 LRejected-AOC | ₹30.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹31.6 LRejected-AOC | ₹31.6 L | L3 | Rejected-AOC L3 |
| 4 | L4₹31.6 LRejected-AOC | ₹31.6 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Sudeep Mathew L4 | Sinthol Thomas L1 | JOSEPH K K PWD CONTRACTOR L3 | TOJU JOSEPH L2 |
|---|---|---|---|---|---|---|---|
| 1.00Side protection works | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 245 | sqm | 17.53 ₹4,294.85 | 14.99 ₹3,672.55 | 17.24 ₹4,223.80 | 16.63 ₹4,074.35 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 4 | each | 2,364.98 ₹9,459.92 | 2,101.2 ₹8,404.80 | 2,326.69 ₹9,306.76 | 2,243.25 ₹8,973 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 6 | each | 363.9 ₹2,183.40 | 254.86 ₹1,529.16 | 358 ₹2,148 | 345.17 ₹2,071.02 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 301.78 | cum | 248.25 ₹74,916.89 | 212.29 ₹64,064.88 | 244.23 ₹73,703.73 | 235.47 ₹71,060.14 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 241.32 | cum | 2,859.18 ₹6.9 L | 2,444.96 ₹5.9 L | 2,812.9 ₹6.8 L | 2,712.01 ₹6.5 L |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 389.5 | cum | 3,848.1 ₹15.0 L | 3,290.61 ₹12.8 L | 3,785.8 ₹14.7 L | 3,650.02 ₹14.2 L |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 33.46 | cum | 9,405.53 ₹3.1 L | 8,042.92 ₹2.7 L | 9,253.28 ₹3.1 L | 8,921.39 ₹3.0 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 29.57 | cum | 8,899.78 ₹2.6 L | 7,610.44 ₹2.3 L | 8,755.7 ₹2.6 L | 8,441.68 ₹2.5 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 183.38 | sqm | 372.1 ₹68,235.70 | 318.2 ₹58,351.52 | 366.08 ₹67,131.75 | 352.95 ₹64,723.97 |
Tender Value
₹33.3 L
EMD Value
₹50,000
Closing Date
4 Mar 2026, 2:00 pmClosed
Executive Engineer Irrigation Division Kottayam
O/O Executive Engineer Irrigation Division Kottayam
GENERAL Urgent Protection works Protection works to the eroded left bank of Meenachil river at ds of Cherpunkal bridge near Cherpunkal church in Kozhuvanal Panchayath General Civil Work 1
2026_Irrig_835883_2
IRR/IA/TR/8114/2022_5_1_1/1
Open Tender
Civil Works - Others
240 days
kozhuvanal panchayath
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
18 May 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
Side protection works
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 5.09 MB
NIT8114.pdf
Tender Documents • 0.03 MB
SBD8114.pdf
Tender Documents • 5.08 MB
BOQ_1415558.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid