Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25,321Accepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹26,600+₹1,279 (5.05%)Accepted-Finance | 2 | Accepted-Finance L2 |
Tender Value
₹32,300
Closing Date
9 Mar 2022, 6:55 pmClosed
Executive Engineer
THE EXECUTIVE ENGINEER MECHANICAL DIVISION DEWAN BAGH BARAMULLA
Refurbishment Works Required for Various Snow Clearance machines Pertaining to Snow Clearance Control Room Bandipora/Gurez and Sumbal of field sub division Baramulla.
2022_PWDJK_161715_2
MDB/TS/e-TENDER/2021-22/184
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
EXECUTIVE ENGINEER MECHANICAL DIVISION BARAMULLA
Yes
24 Mar 2022
22 Feb 2022
10 Mar 2022
22 Feb 2022
9 Mar 2022
22 Feb 2022
Amount
Repairs and Modification of Back Wheel non Skid Chains for Snow Cat 75 Hp (Tyre Size 18.4-30) and Snow Cat 90Hp Preet (Tyre Size 18.4-30) .The Non Skid Chain Damaged during Snow Clearance at Achoora Chorvan Road and Tulail Road Gurez. This is to be carried out at snow clearance control room Gurez
Door Setting and repairs to glass regulating machine of Snow Clearance Machine 58 on both Left and right hand sides of the machine. The job includes dismantling of doors from the machine and repairing of regulating machine locking arrangement fitting of handles and refitting of doors back to the machines. This is to be carried out at snow clearance control room Bandipora
Repairs to self starter of Machine 68 by way of providing and fitting of solenoid switch, carbon brush set, carbon brush rocker and armature Bush. The Job Also includes washing of Self by Petrol. This is to be carried out at snow clearance control room Sumbal.
Repairs to Hydraulic Tank of M/C No. 68 by way of removal of inlet and out let of hydraulic hose connections from the hydraulic tank and isolating the tank from the hydraulic manifold and then carrying out repairs to hydraulic tank damaged at various portions by way of gas welding and refitting the inlet and outlet hydraulic connections to the hydraulic tank and testing for leakages after successful completion of job. This is to be carried out at snow clearance control room Sumbal
Repair to Non skid chains by way of Fabrication of broken new joints at the broken lock joints through electric arch welding to be carried out at snow clearance control unit Sumbal Sizes of:- 3.11.2-24=02NOs (Snow cat 03) 4.1200X20=04Nos (Clearance machine 68 and 28) This is to be carried out at snow clearance control room Sumbal
Repairs to self starter of Snow Cutter Rolba 1500 by way of providing and fitting of, carbon brush set, carbon brush rocker and armature Bush. The Job Also includes washing of Self by Petrol. This is to be carried out at snow clearance control room Gurez
HIMALAYA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .