Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹61,063Accepted-AOC | ₹61,063 | 1 | Accepted-AOC LOWEST |
| 2 | 2₹66,503Rejected-Finance | ₹66,503 | 2 | Rejected-Finance HIGHER BID |
| 3 | 3₹77,169Rejected-Finance | ₹77,169 | 3 | Rejected-Finance HIGHER BID |
| Sl No | Description | Qty | Unit | kutubudeen contractor L1 | SUEAIB CONTRACTOR L2 | MOHD FURKAN CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00Maintenance Job Work | ||||||
| 1.01 | M-40 & M-80 Maintenance | 1 | Nos | 1,150 ₹1,357 | 1,150 ₹1,357 | 1,300 ₹1,534 |
| 1.02 | General Checking | 1 | Nos | 80 ₹94.40 | 46 ₹54.28 | 60 ₹70.80 |
| 1.03 | Greesing Per Bus | 1 | Nos | 125 ₹147.50 | 125 ₹147.50 | 150 ₹177 |
| 1.04 | King Pin Work Per King Pin | 1 | Nos | 425 ₹501.50 | 425 ₹501.50 | 450 ₹531 |
| 1.05 | Diesel Tank Dismantling, Cleaning Repairing & Mounting | 1 | Nos | 350 ₹413 | 448 ₹528.64 | 500 ₹590 |
| 1.06 | After Trearnent (ATS) system Dismantling, Cleaning Repairing & Mounting | 1 | Nos | 1,150 ₹1,357 | 1,380 ₹1,628.40 | 1,450 ₹1,711 |
| 1.07 | Urea tank Dismantling, Cleaning | 1 | Nos | 560 ₹660.80 | 700 ₹826 | 810 ₹955.80 |
| 2.00Engine Job Work | ||||||
| 2.01 | Engine Job Work:- Change Of Engine Oil And Oil Filter | 1 | Nos | 110 ₹129.80 | 50 ₹59 | 70 ₹82.60 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
3 Dec 2025, 12:00 pmClosed
SERVICE MANAGER UPSRTC GKP
SERVICE MANAGER OFFICE UPSRTC GKP
PADRAUNA DEPOT BUS MAINTENANCE JOB WISE
2025_UPSRT_1091993_1
GR/SM/GKP/2389
Open Tender
Repair and Maintenance Services
SM OFFICE UPSRTC GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SERVICE MANAGER UPSRTC GORAKHPUR
₹25,000
23 Dec 2025
19 Nov 2025
3 Dec 2025
19 Nov 2025
3 Dec 2025
19 Nov 2025
Amount
Maintenance Job Work
M-40 & M-80 Maintenance
General Checking
Greesing Per Bus
King Pin Work Per King Pin
Diesel Tank Dismantling, Cleaning Repairing & Mounting
After Trearnent (ATS) system Dismantling, Cleaning Repairing & Mounting
Urea tank Dismantling, Cleaning
Engine Job Work
Engine Job Work:- Change Of Engine Oil And Oil Filter
Engine Head Dismantling & Mounting
Radiator opening & washing & fitting
Inter cooler opening & cleaning
Air compressor opening & fitting
Water pump opening & fitting
Engine oil chamber opening & fitting
Air dryer and system protection valve opening & fitting
Engine oil cooling plate opening & fitting
Engine Change Uro-3 BS-III,BS-IV& BS-6
Engine Change Uro-4
Diesel Filter Change
Air Filter Change
Air Filter Assembly Change
Piston Ring Job Work
Change Of Radiator Assembly
Air Filter Assembly
Head Tighting
Tapid Matching
Change Of Accelarator Cable
Change Of Turbo Charger
Change Of Engine Main Oil Seal
Change Of Timing Cover Oil Seal
Change Of Fan Belt
Change Of Engine Flywheel
Change Of Engine Flywheel cam Shaft
Change Of Engine Front Maunting Pad
Change Of Engine Rear Maunting Pad
Cross Member Dismantling & Fitting
Change Of Flywheel Bearing
F.I.P. & Injector Job Work
Dismantling & Fitting Of F.I. Pump
Air Lock Removal
Dismantling Of Injectors
Fitting Of Injectors
Change Of F.I.P. Lever & Bush
Transmisson Job Work
Accelerator pedal change
Gear lever wire opening, cleaning with WD-40, & refitting/ Chaing
Clutch oil pipe replacement (per pipe)
Clutch Plate Setting
Gear Lever Setting
Clutch Plate 352 Dia Change
Pressure Plate 352 Dia Change
Clutch Plate 330 Dia Change
Pressure Plate 330 Dia Change
G.B. 40 Change
G.B. 60 Change
G.Box G.B. 40 Overhauling
G.Box G.B. 60 Ovehauling
Clutch Release Bearing Change
Clutch Sleeve Cylinder Change
Clutch Master Cylinder Change
P. Shaft Dismantling & Mounting
Rubber Cushion With Center Bearing Change
With draawl Plate Dismantling & Fitting
Front Axle Job Work
Change Of Front Spring Per Nos
Change Of Front Chasis Bracket Per Nos
Change Of Front Brake Drum
Change Of Front Diaphram
Change Of Diaphram Washer
Repairing Of Kamani
Repair Of Tierod
Repair Of Push & Pull Rod
Wheel Alignment
Rear Axle Job Work
Change Of Rear Spring Per Nos
Change Of Rear Chasis Bracket Per Nos
Repairing Of Kamani
Change Of Crown Cage
Change Of Rear Diaphram
Change Of Hub Shaft
Change Of Tail Pinion Oil Seal
Change Of Rear Brake Drum
Change Of Brake Rachet Per Wheel
Steering Job Work
Change Of Steering Box
Change Of Steering Rod & Steering Wheel
Change Of Power Steering Pump
Steering Box Ovehauling
Change Of Steering Cross
Steering oil pipe replacement (per pipe)
Power steering tank cleaning (per job)
Brake Job Work
Repairing Of Air Pressure Head
Change Of Air Pressure Head
Fitting Of Air Governor
Change Of Pressure Pipe
Repair Of D.D. Unit
Change Of D.D. Unit
Brake Valve Repair & Fitting
Electric Job Work
Self Starter Repairing
Alternator Repairing
Change Of Self Starter
Change Of Alternator
Change Of Battery
Head Light Fitting
Fitting Of Roof Light
Fitting Of Indicator Light
Fitting Of Back Light
Fitting Of Head Light Bulb / All Weather Bulb
Fitting Of Roof Light Bulb
Fitting Of Back Light Bulb
Horn Fitting
Complete Repairing Of Wiring
Wiper Arm & Blade Fitting
Change Of Electric Switch
Change Of Meter Light Bulb
Horn Repairing
Wiper machine opening & fitting Work
Body Job Work
Front Wind Screen Glass Fitting Per Glass
Side Window Glass Fitting Per Glass
Seat Fitting Per Seat
Upholstery Repair Per Inch
Electric Welding Per Inch
Tubular Straightehing & Fitting
Angle Straightehing & Fitting
Repairing & Fitting Of Battery Box
Straightening Of Chasis Per Inch
Change Of Seat Cushion & Rexine Per Seat
Change Of Mazda Rubber Per Window
Fitting Of Window Catcher Lock Per Window
Fitting & Tightening Of U Bolt
Fitting Of Wind Screen Per Glass
Front Show Repair
Front Show Grill Repair
Front Wind Screen Frame Repair
Side Window Frame Repair
Panel Fitting Per Sq. Feet
Floor Repair Per Sq. Feet
Frist Aid Box Fitting
Complaint Box Fitting
Seat Repairing (Welding Or Bolt)
Mud Guard Repairing
Passenger Gate Repairing
Floor Repairing
Painting Job Work
Painting Per Sq. Fit Plain
Letter Writing (1" X 1')
Letter Writing (2" X 1')
Letter Writing (3" X 1')
Letter Writing (4" X 1')
Letter Writing (5" X 1')
Full Body Paint
Show Painting
Number Plate Writing Per Plate
Destination Board Writing
Miscllaneous Job Work
Tyre Dismantling & Mounting Per Tyre
Per Tyre Puncture Repair
Air Pressure Checking & Filling Per Bus
Wheel Alignment Per Bus
Turbo Packing Change
Exhaust Manifold Packing Change
Diesel P.V.C. Pipe Change
Scilencer Dismantling & Fitting
Fly Wheel Dismantling & Fitting
Dismantling & Fitting Of Bs-4 Injectors
Dismantling & Fitting Of Common Rail
B/D Per Person ( For More Then 40 K.M.)
Skilled Labour ( Per Person Per Day)
Letter Writing Per Fit
Engine & Pump Work Of Bs-6 Buses
Injector Fitting And Opening
Comman Rail Fitting And Opening
BS-6 BUS WORK
Complete vehicle wiring repair
Engine wiring repair
Injector Wiring repair
Speed sensor wiring repair
Accelerator pedal wiring repair
Complet Cleaning Of DEF Tank Filter Off All Fiting & Regenesarin
Close Check Light Throught Software
Full Wiring Was Of Accidental Vehicle
Wiring Reparing Work Of Doser Pump & UPS Pump
Engine ECU & ECM Checking Opping & Fitting
ECU and ECM wiring repair
EGR system opening & cleaning Fiting
DPF opening, air pressure cleaning and regeneration
Clutch plate & pressure plate opening fitting
EGR & ETV valve cleaning with WD-40 and refitting
R.G.U valve opening & fitting
Company shocks repair or replacement (per shock
Spring Rubber Pad Changer Per Loy Spring
SUEAIB CONTRACTOR (BID ID -5710558)
MOHD FURKAN CONTRACTOR (BID ID -5712935)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
ETENDERPADRAUNA.pdf
Tender Documents • 5.74 MB
BOQ_2006300.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid