Loading…
Loading…
Tender Value
₹30.7 L
EMD Value
₹61,400
Closing Date
28 Sept 2026, 4:00 pmDue tomorrow
Executive Engineer Construction Leh
Executive Engineer Construction Leh
Expansion of Existing room of CT Scan by way of construction new console room at SNM Hospital,Leh.
2026_PWD_19502_1
72 of CDL Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Leh
Please refer Tender documents.
5 documents required · 5 mandatory
₹307
Executive Engineer Construction Leh
₹61,400
7 Sept 2026
7 Sept 2026
29 Sept 2026
8 Sept 2026
28 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (notexceeding 1.5min width or10 sqmonplan), includingdressingof sides and ramming of bottoms, liftupto1.5m, including getting out the excavated soil and disposal of surplus excavated soilas directed, within a lead of 50 m.
All kinds of soil. | 38.17 | Cum | 278.09 | ₹10,614.7 |
| 2 | Ordinary rock | 9.54 | Cum | 504.48 | ₹4,812.74 |
| 3 | Dry stone pitching (any thickness) excluding cost of stones.
On Horizonta | 7.33 | Cum | 537.71 | ₹3,941.41 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.34 | Cum | 5,725.33 | ₹42,023.92 |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) | 19.87 | Cum | 5,730.39 | ₹1,13,862.85 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. upy floor five level excluding cost of centering, shuttering, finishing and reinforcement: (1:1.5:3) 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 8.91 | Cum | 11,102.31 | ₹98,921.58 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 11.74 | Cum | 11,551.66 | ₹1,35,616.49 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (Thermo-Mechanically treated bars.) | 2,478.25 | kg | 109.33 | ₹2,70,947.07 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete | 23.1 | sqm | 306.15 | ₹7,072.07 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts | 33.44 | sqm | 769.01 | ₹25,715.69 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_46180.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .