| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Finance 0 GRAM AMBADI TEHSIL VIKASHNAGAR DEHRADUN DEHRADUN UTTARAKHAND 248198 UDYAM UK 05 0031363 | DEHRADUN | UTTARAKHAND | 248198 | +9.11% | ₹11.8 L | L1 | Admitted-Finance |
Tender Value
₹10.8 L
EMD Value
₹21,680
Closing Date
25 Mar 2026, 3:00 pmClosed
Executive Engineer PWD Elect Division II Jodhpur
Executive Engineer PWD Elect Division II Jodhpur
SITC of DG Set in Devnarayan boys residential school raas Jaitaran pali.
2026_CEPWD_547924_9
NIT No.60 of 2025-26 of E.E. PWD Elect.Dn.II Jodhpur
Open Tender
Electrical Works
60 days
Jodhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer PWD Elect Division II Jodhpur
₹21,680
Yes
Executive Engineer PWD Elect Division II Jodhpur
27 Mar 2026
22 Mar 2026
25 Mar 2026
22 Mar 2026
25 Mar 2026
22 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SITC of Radiator Cooled and Turbo charged Silent DG Set (As per latest CPCB emission norms) having specifications as per A, B, C, D, E, F,G,H & I | |||||
| 2A) 1500 RPM Diesel Engine conforming to BS:649/5514 of suitable BHP (up to 82.5 kVA 6 cylinder or Below required, 125 kVA & Above ratings 6 cylinder or above required ) capable of taking 10% over loading for one hour after 12 hours of continuous operation., Dry exhaust mainfold with Hospital grade silencer and catalytic convertor(isolated from main DG chamber), up to 3 M exhaust piping (with LRB insulation & Alum. cladding ) as required . | |||||
| 3B) AC Brush less SPDP Alternator conform to BS 5000 (part 99) or IS/IEC 60034-1. . Alternator shall be self regulated with standard Alternator Protection( Over voltage , over speed & under voltage, under speed warning & shutdown).Engine & Alternator mounted on a common base Frame & coupled through a flexible coupling or close coupled | |||||
| 4C) CPCB / ARAI approved Standard canopy with Weatherproof, powdercoated Accoustic enclosure for DG set for sound attenuation fabricated from 1.6 mm CRCA sheet steel (structure) with sidewall fabricated from 1.6 mm CRCA sheet & filled with glasswool (96Kg/m3) / Foam. as per IS8183 the doors of 28/40/50/85mm thick as perrating and fabricated from 1.6mm CRCA sheet packed with accoustic material, All doors/opening are sealed with neoprene /EPDNgaskets. The DG Set has Inbuilt / External in fuel tank to run 6 to 8 Hrs as per OEM standard, with protection and tripping of DG set against temperature of more than 50 degree centigrade. | |||||
| 5D) Electronic / Mechanical governor, Manual & electric Start ,Batteries with battry charger, Engine instruments panel,AVM pads All controls for operation of DG set are from outside the enclosure with DG control panel having Microprocessor based Genset monitoring like Running Hour, RPM, Low Lube Oil tripping & control system, Panel mounted MCCB/ACB of suitable rating, Ammeter, Voltmeter, PF meter, frequency meter, KWH meter,digital fuel display meter, Ind.lamps etc. mounted inside enclosure , visible and accessible from outside. The enclosure should be suitable for following capacity DG sets and alternator. Noise level shall be less than 75 dB at a distance of 1 Mtrs. duly certified by authorised agency etc. complete in all respect of following capacity : | |||||
| 6E) (i) Accoustic glass wool wall thickness should not be less then 40mm and not less then 20mm PU foam upto rating 100 KVA. (ii).Accoustic glass wool wall thickness should not be less then 65mm and not less then 50mm PU foam upto rating 250 KVA. (iii)Accoustic glass wool wall thickness should not be less then 100mm for rating above 250 KVA. | |||||
| 7F) First filling of the fuel tank shall be done by contractor and the prevailing fuel cost at that time shall be reimbursed to the contactor by department. | |||||
| 8G) Servicing Contract of DG Set from OEM's Authorised Service Dealer as per OEM guidelines during the DLP period shall be done by contractor including all consumables, actual charges shall be reimbursed to the contractor by End User Department. | |||||
| 9H) Manufacturer / OEM must have its authorized service dealer in Rajasthan. Which can provide service within 6 Hours of compalint registration. | |||||
| 10I) DG set will be offered for Inspection and Testing at Manufacturer's Works in presence of Departmental Engineers. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR . | |||||
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.58 MB
Tendernotice_2.pdf
PDF • 0.28 MB
Tendernotice_3.pdf
PDF • 0.19 MB
Tendernotice_4.pdf
PDF • 1.79 MB
BOQ_976997.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid