Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.3 LRejected-Finance | ₹8.3 L | L2 | Rejected-Finance L2 |
| Rank | Bidder | Total Amount |
|---|---|---|
| L2 | NIBU PRABHA Bid ID 2519957 | ₹8,28,830.1 |
| L1 | ROY M.T Bid ID 2519348 | ₹7,92,482.01 |
| Sl No | Description | Qty | Unit | NIBU PRABHA L2 | ROY M.T L1 |
|---|---|---|---|---|---|
| 1.00Toilet construction | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 70 | sqm | 12 ₹840 | 9 ₹630 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 17.64 | cum | 380 ₹6,704.34 | 359 ₹6,333.84 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.7 | cum | 8,000 ₹29,616 | 7,932 ₹29,364.26 |
| 1.00 | OD409997/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 8.34 | cum | 4,000 ₹33,360 | 3,993 ₹33,301.62 |
| 1.00 | OD522490/2025-2026:od1590278/2021_2022 : Random rubble masonry in Cement mortar1:6(1 cement: 6 coarse sand) with hard stone in foundation and plinth as per direction of engineer in charge at site. Modified 7.1.1 | 3.77 | cum | 6,750 ₹25,481.25 | 6,722 ₹25,375.55 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8.76 | sqm | 800 ₹7,008 | 762 ₹6,675.12 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.75 | sqm | 400 ₹300 | 386 ₹289.5 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.5 | cum | 10,500 ₹15,781.5 | 10,488 ₹15,763.46 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 128.88 | kilogram | 120 ₹15,465.96 | 112 ₹14,434.9 |
Tender Value
₹7.9 L
EMD Value
₹19,830
Closing Date
12 Mar 2026, 3:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER PIRAVOM MUNICIPALITY
186/2025-2026-Construction and Maintenance of Toilet Complex at Higher Secondary School Piravom in Ward No.8 in Piravom Municipality
2026_LSGD_844749_1
ET12/AE/LIDEW/PVM/25-26_4
Open Tender
Civil Works - Buildings
PIRAVOM
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,750
₹19,830
29 Jun 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Toilet construction | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | OD409997/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.005 | OD522490/2025-2026:od1590278/2021_2022 : Random rubble masonry in Cement mortar1:6(1 cement: 6 coarse sand) with hard stone in foundation and plinth as per direction of engineer in charge at site. Modified 7.1.1 | 1 | cum | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.008 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1426316.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 2.49 MB
Tendernotice_4.pdf
PDF • 0.11 MB
Tendernotice_5.pdf
PDF • 0.10 MB
Tendernotice_6.pdf
PDF • 0.09 MB
Tendernotice_7.pdf
PDF • 0.09 MB
BOQ_1426316.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid