Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.4 CrAdmitted-Finance | Admitted-Finance | |
| 2 | ₹8.7 CrAdmitted-Finance | Admitted-Finance | |
| 3 | ₹9.8 CrAdmitted-Finance 377 RAJARAM SALAI RAJARAM SALAI KK NAGAR TIRUCHIRAPPALLI TAMIL NADU 620021 | TIRUCHIRAPPALLI | TAMIL NADU | 620021 | Admitted-Finance | |
| 4 | ₹26.3 CrAdmitted-Finance HEAD OFFICE 8TH FLOOR EXPRESS CORPORATE PARK SECTOR 16A FILM CITY NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Finance | |
| 5 | ₹30.7 CrAdmitted-Finance NO 2019 GROUND FLOOR BLOCK B ARDENTE OFFICE ONE HOODI CIRCLE BEHIND HOODI BUS STOP ITPL MAIN ROAD MAHADEVAPURA BANGALORE KARNATAKA 560048 | BENGALURU URBAN | KARNATAKA | 560048 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PSR INDUSTRIES | DIGILOGIC SYSTEMS PRIVATE LIMITED | SAFRAN DATA SYSTEMS INDIA PVT LTD | TRIVENI ENGINEERING AND INDUSTRIES LTD | SISCO Energy Private Limited | sm engineering |
|---|---|---|---|---|---|---|---|---|---|
| 0.00Item | |||||||||
| 1.00Module I | |||||||||
| 1.01 | Power Train Induction Motor, 2.2MW with Transformer, VFD, PLC and Control Drive Units & Accessories | 1 | Unit | - | - | - | 9,80,00,000 ₹11,56,40,000 Lowest | - | - |
| 1.02 | Step up Gear Box, 2.2MW with Lube Oil System, Dummy Rotor Shaft and Accessories | 1 | Unit | - | - | - | 2,20,00,000 ₹2,59,60,000 Lowest | - | - |
| 1.03 | Drive System Output Coupling and Torque Meter | 2 | Set | - | - | - | 1,55,00,000 ₹1,82,90,000 Lowest | - | - |
| 1.04 | Design, Engineering and Torsional Analysis for Power Train | 1 | Job | - | - | - | 10,00,000 ₹11,80,000 Lowest | - | - |
| 1.05 | Integration, Supervision & Commissioning of Motor and Gearbox | 1 | Job | - | - | - | 20,00,000 ₹23,60,000 Lowest | - | - |
| 1.06 | Standard waranty cost for a period of one year | 1 | Job | - | - | - | 90,00,000 ₹1,06,20,000 Lowest | - | - |
| 1.07 | Cost of comprehensive extended warranty for 2 subsequent years (Not considered for L 1) | 1 | Job | - | - | - | 6,00,00,000 ₹7,08,00,000 Lowest | - | - |
| 1.08 | Cost of Non comprehensive AMC for next 5 years (Not considered for L 1) | 1 | Job | - | - | - | 1,50,00,000 ₹1,77,00,000 Lowest | - | - |
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
8 Jul 2025, 12:30 pmClosed
DIRECTOR GTRE
GTRE DRDO MOD GoI C V Raman Nagar Bangalore - 93
Small Compressor Test Facility
2025_DRDO_703454_1
GTRE/25ATT043/CMS II
Open Tender
Miscellaneous Services
Fixed-rate
480 days
GTRE DRDO
s per Part IV of RFP
6 documents required · 6 mandatory
₹0
₹1.8 Cr
MMG Conference Hall GTRE
11 Mar 2026
3 Apr 2025
9 Jul 2025
3 Apr 2025
8 Jul 2025
24 Apr 2025
23 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.36 MB
Tenderdocument.pdf
Tender Documents • 1.74 MB
Tenderdocument_2.pdf
Tender Documents • 0.39 MB
Tenderdocument_3.pdf
Tender Documents • 4.57 MB
Tenderdocument_4.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .