| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.2 LAccepted-AOC SOLMARA BHAIRA P O P S BELSOR DIST NALBARI ASSAM | BELSOR | NALBARI | ASSAM | ₹38.2 L | 1 | Accepted-AOC admitted |
| 2 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | FARUK AHMED L1 |
|---|---|---|---|---|
| 1.00 | 15.2 Demolishing cement concrete manually/ by mechanical meansincluding disposal of material within 50 metres lead as per directionof Engineer - in - charge.15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalentdesign mix) | 13.44 | cum | 1,826.46 ₹24,547.62 |
| 2.00 | 15.28 Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:15.28.1 G.S. Sheet | 136.07 | sqm | 123.76 ₹16,840.02 |
| 3.00 | 15.41 Dismantling cement asbestos or other hard board ceiling or partitionwalls including stacking of serviceable materials and disposal ofunserviceable materials within 50 metres lead. | 165.6 | sqm | 42.32 ₹7,008.19 |
| 4.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :5.12.2 Of area beyond 3 sq. metres | 48 | each | 377.24 ₹18,107.52 |
| 5.00 | 9.3 Providing wood work in frames of false ceiling, partitions etc. sawn andfixed in position with necessary stainless steel screws etc.9.3.2 Kiln seasoned and chemically treated hollock wood cum 64332.20 | 2.04 | cum | 58,542.3 ₹1.2 L |
| 6.00 | Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).6 mm thick Cement fiber board as per IS: 14862 | 284.4 | sqm | 703.79 ₹2.0 L |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone
aggregate 20 mm nominal size) | 21.6 | m3 | 6,218.39 ₹1.3 L |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to
floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 8.52 | m3 | 9,754.56 ₹83,108.85 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for :5.9.3 Suspended floors, roofs, landings, balconies and access | 108 | m2 | 697.52 ₹75,332.16 |
| 10.00 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 840.36 | KG | 81.58 ₹68,556.57 |
Tender Value
₹42.0 L
EMD Value
₹83,992
Closing Date
26 Aug 2025, 2:00 pmClosed
MD NHM, Assam
Office of the MD NHM, Assam
Infrastructure Development of Ayush Health and Wellness Centers (AHWC) under Ayushman Bharat for the FY 2023-2024, group. 1 (12 nos. of scheme in Sonitpur and Biswanath District.
2025_NHM_46164_1
NHM/I/1187217/2025
Open Tender
Civil Works - Building
Sonitpur and Biswanath
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹83,992
Yes
16 Mar 2026
5 Aug 2025
27 Aug 2025
5 Aug 2025
26 Aug 2025
5 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid