Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.4 L+₹1.0 L (12.0%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹11.2 L+₹2.8 L (33.2%)Rejected-Finance CB 67 RING ROAD NARAINA NEW DELHI DELHI 110028 | NEW DELHI | DELHI | 110028 | 3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical 56 6BAKSARA ROAD PO BAKSARA HOWRAH HOWRAH 711110 WEST BENGAL INDIA | HOWRAH | HOWRAH | WEST BENGAL | 711110 | - | Rejected-Technical All parameters not complied |
Tender Value
Refer Docs
EMD Value
₹27,500
Closing Date
23 Feb 2021, 4:00 pmClosed
DIG Cum Estate Officer
HQ NWS CRPF Hallomajra Chandigarh
Annual maintenance contract of 500 KLD STP for the period of 12 months.
2021_CRPF_615687_1
B.V-4(ARMO)/20-21-DA-2-BLDG
Open Tender
AMC/ Maintenance Contracts
Works
365 days
BCS CRPF hallomajra Chandigarh
As per tender documents(NIT)
2 documents required · 2 mandatory
₹0
₹27,500
Yes
24 Jun 2021
10 Feb 2021
24 Feb 2021
10 Feb 2021
23 Feb 2021
10 Feb 2021
Amount
Consumable items:- Ferric Chloride, Alum cationic polymers, anionic polymers ( used for coagulation enhancement ), Hydrogen Peroxide (odor control), Chlorine (Disinfectant), Sulpher Dioxide ( dechlorination before discharge to river or whatever ) Carbon Dioxide (pH ) and Sodium Hydroxide (pH control) including chlorine polyelectrolyte and reagents etc as required for the complete operation and maintenance as per requirements during the AMC.
Maintenance charges:- Bearing, shaft, Repair Overhauling of impeller, Fan Overhauling, over hauling of silencer and all type of repair/maintenance work in STP etc.
Sampling charges of treated sewage water from the MOEF/NABL approved lab once in a month.
Cleaning of STP outlet water storage Sump size (21’x13’x8’) at rear side of new T-III Qtr, 3 meter dia depth 5 meter underground sump near type v 02 no. at old campus and sump of STP premises twice in year with prior intimation to this office before start of work .
Visit of STP By an Engineer (Half yearly)
01 No. of supervisor/plant manager required for plant operation (general shift only)
03 No. of operator required for plant operation: (First shift ,Second shift, Third shift )
mohit kumar contractor
EMPERIA ENERGY PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .