| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist rank₹2.8 LAccepted-AOC PULININNA KALLAMPOTTA BUNGLOW PARANIYAM ARUMANOOR POOVAR P O | ₹2.8 L | Ist rank | Accepted-AOC 1st rank |
| 2 | Rejected-Technical | - | - | Rejected-Technical 2nd Rank |
| Sl No | Description | Qty | Unit | RAVIDAS M L2 | PRAKASH N V L1 |
|---|---|---|---|---|---|
| 1.00Leak prevention | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 250 | sqm | 16.15 ₹4,037.50 | 15.15 ₹3,787.50 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 6 | cum | 2,235.82 ₹13,414.92 | 2,096.59 ₹12,579.54 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 26.42 | cum | 319.55 ₹8,443.79 | 299.66 ₹7,918.22 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.42 | cum | 8,204.42 ₹1.4 L | 7,693.65 ₹1.3 L |
| 1.00 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 276 | sqm | 305.39 ₹84,287.64 | 286.38 ₹79,040.88 |
| 1.01 | OD17570/2025-2026:Engaging beldar/mazdoor for desilting the earth from pressure syphon small trees, vegetation,and those meterials that obstructing the free flow of water in the canal. | 43 | Day | 961.31 ₹41,336.33 | 901.46 ₹38,762.78 |
Tender Value
₹3.4 L
EMD Value
₹8,472
Closing Date
3 Nov 2025, 5:00 pmClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, Channel Sub Division, Neyyattinkara
GENERAL-NIP- Action plan-2025-26- Leak prevention near ch 32080m and earth protection face of cut ramp cover ch 32670m of LBC Main canal-General Civil Work
2025_Irrig_817181_1
IRR/IA/EST/4335/2025_5_1_1
Open Tender
Civil Works - Canal
Neyyattinkara
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
₹8,472
Yes
22 Jan 2026
30 Oct 2025
4 Nov 2025
30 Oct 2025
3 Nov 2025
30 Oct 2025
Amount
Leak prevention
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD17570/2025-2026:Engaging beldar/mazdoor for desilting the earth from pressure syphon small trees, vegetation,and those meterials that obstructing the free flow of water in the canal.
RAVIDAS M (BID ID -2425235)
Bidder Name
RAVIDAS M
PRAKASH N V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
bid4335.pdf
Tender Documents • 1.90 MB
BOQ_1369135.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid