Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC | ₹2.4 L | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹2.5 LRejected-AOC | ₹2.5 L | 2 | Rejected-AOC 2nd lowest |
Updated dates
Tender Value
₹4.7 L
EMD Value
₹11,632
Closing Date
27 Jan 2026, 3:00 pmClosed
Assistant Executive Engineer
WS Sub Division KWA Choondy Puthencruz
OandM - Water Supply Schemes-Mace of Vadavucode Puthencruz panchayath -Demolishing RCC Overhead Tank at Rajarshi-General Civil Work
2026_KWA_826839_1
WSS PTCZ/4/2025-26
Open Tender
Civil Works - Others
Vadavukode Puthencruz
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,030
₹11,632
23 Apr 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
27 Jan 2026
12 Jan 2026
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
OD32886/2024-2025:Charges for covering around the OHSR compound for the protection from the noise and dust pollution during the demolishing work using plastic sheet (silpaulin sheet) or any other materials tied to the scaffolding work including all charges etc complete.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.45.1:Dismantling C.I pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer - in- Charge:Up to 150 mm diameter
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
OD33731/2024-2025:Deduction for cost of reinforcement ( for scrap )
15.53.1:Dismantling of C. I sluice valve including stacking of useful materials within a lead of 50 metres.Upto 150 mm diameter
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1387150.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Conditions.pdf
Tender Documents • 1.36 MB
BOQ_1387150.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid