Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC WARD NO 19 BRAHMNAGAR GAFI NO 2 ROBERTSGANJ DIST SONBHADRA | ROBERTSGANJ | SONBHADRA | UTTAR PRADESH | L1 | Accepted-AOC l1 | |
| 2 | L3₹2.8 Cr+₹48.7 L (21.2%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 3 | L₹2.4 CrRejected-Finance 50 B SEC A SUBASH NAGAR JAMMU J K 180005 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180005 | L | Rejected-Finance L2 | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.5 Cr
EMD Value
₹5 L
Closing Date
19 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of Superintending Engineer, Construction Circle, UKPJN Dehradun
Construction of 0.42 MLD Sewage Pumping Station in Direct in line pumping DIP Technology including design Supply transportation installation commissioning and testing at Doon Vihar Jakhan, Dehradun
2022_MDPEY_46078_4
Letter No. 2415/NIVIDA/573, dated 20.06.2022
Open Tender
Civil Works
Item Rate
240 days
Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer Dehradun Division UKPJN
₹5 L
Dehardun
27 Sept 2023
27 Aug 2022
20 Sept 2022
27 Aug 2022
19 Sept 2022
5 Sept 2022
3 Sept 2022
Amount
Construction of Sewage Pumping Station in Direct in line pumping (DIP) Technology which shall include Design, development, supply, transportation, installation, commissioning & testing of all mechanical, electrical, instrumentation & all Civil works of Doon Vihar Jakhan SPS with a design capacity of 0.42 MLD average discharge with a peak factor 3 including Rising Main works and Connection of SPS to existing incoming gravity sewer line, Construction of RCC (M-30) sump, Inlet Chamber, Manholes, Internal drainage, Coarse screen channel, Panel/DG Room, Supply of DG Set etc complete in all respect as per Bid Document. The construction period is 8 months including 3 months trial and run and defect liability period 12 months after the commissioning and completion of the project.
Civil Works
Electrical Mechanical & Instrumentation works
Annual O&M Price (Without Electricity & Fuel)
1st Year
2nd Year
3rd Year
4th Year
5th Year
R K GUPTA AND CO
M/s Naresh Singhals And Co
stage.html
html • 0.05 MB
technical_57736.pdf
PDF • 0.57 MB
techsummary_57736.pdf
PDF • 0.33 MB
finance_57736.pdf
PDF • 0.33 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_57736.pdf
PDF • 0.41 MB
doon_vihar_dos.pdf
PDF • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .