Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAdmitted-Finance GRAM TITOLI POST O KUHEEL DISTRICT ALMORA | L1 | Admitted-Finance | |
| 2 | L2₹46.5 L+₹8.9 L (23.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹47.2 L+₹9.6 L (25.4%)Admitted-Finance 2 58 CIVIL LINE BHOTIYA PADAV HALDWANI NAINITAL | UDAM SINGH NAGAR | UTTARAKHAND | 244713 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Yogesh Tewari Contractor L3 | BORA CONSTRUCTION L1 | G.D Construction L2 |
|---|---|---|---|---|---|---|
| 1.00ekuuh; eq[;ea=h dh ?kks"k.kk la[;k& 226@2022 ds vUarxZr ftyk vYeksM+k dh fo/kkulHkk {ks= lYV ds fodkl[k.M L;kYns esa dqykUVs'oj egknso efUnj ds esyk LFky dk lkSUn;Zdj.k dk;ZA | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including etting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock/ SOIL | 57.28 | Cum | 297 ₹17,012.16 | 250 ₹14,320 Lowest | 297 ₹17,012.16 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 37.28 | Cum | 7,173 ₹2,67,409.44 | 6,000 ₹2,23,680 Lowest | 7,173 ₹2,67,409.44 |
| 1.03 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 13.64 | Cum | 7,629 ₹1,04,059.56 | 6,300 ₹85,932 Lowest | 7,629 ₹1,04,059.56 |
| 1.04 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6coarse sand) | 28.57 | Cum | 9,404 ₹2,68,672.28 | 7,500 ₹2,14,275 Lowest | 9,404 ₹2,68,672.28 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) for column footing | 14.39 | Cum | 9,562 ₹1,37,597.18 | 7,600 ₹1,09,364 Lowest | 9,562 ₹1,37,597.18 |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 2.82 | Cum | 11,530 ₹32,514.6 | 9,200 ₹25,944 Lowest | 11,530 ₹32,514.6 |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 5.67 | Cum | 12,097 ₹68,589.99 | 10,000 ₹56,700 Lowest | 12,097 ₹68,589.99 |
| 1.08 | Centring and shuttring includings, ropng , etc and removel from foundation footing bases of columns. | 19.09 | sqm | 352 ₹6,719.68 | 280 ₹5,345.2 Lowest | 352 ₹6,719.68 |
| 1.09 | Centring and shuttring includings, ropng , etc and removel from columns piller, piers ,abutments, post and struts. | 24.77 | sqm | 909 ₹22,515.93 | 400 ₹9,908 Lowest | 909 ₹22,515.93 |
Tender Value
₹50.1 L
Closing Date
9 Sept 2026, 5:00 pmClosed
Executive Engineer
Office of The Executive Engineer Irrigation Division Ranikhet
Under Cm Ghoshna 26 2022 work of Beautification of Mela Sthal of Kulanteshwar Mahadev Mandir at Block Syaldey
2026_IRDCE_99488_1
04/EE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Syaldey
Refer to SBD and NIT
3 documents required · 3 mandatory
₹4,000
Executive Engineer Irrigation Division Ranikhet
Office Irrigation Division Ranikhet
1 Oct 2026
28 Aug 2026
10 Sept 2026
28 Aug 2026
9 Sept 2026
28 Aug 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ekuuh; eq[;ea=h dh ?kks"k.kk la[;k& 226@2022 ds vUarxZr ftyk vYeksM+k dh fo/kkulHkk {ks= lYV ds fodkl[k.M L;kYns esa dqykUVs'oj egknso efUnj ds esyk LFky dk lkSUn;Zdj.k dk;ZA | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including etting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock/ SOIL | 57.28 | Cum | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 37.28 | Cum | - | - |
| 1.03 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 13.64 | Cum | - | - |
| 1.04 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6coarse sand) | 28.57 | Cum | - | - |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) for column footing | 14.39 | Cum | - | - |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 2.82 | Cum | - | - |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 5.67 | Cum | - | - |
| 1.08 | Centring and shuttring includings, ropng , etc and removel from foundation footing bases of columns. | 19.09 | sqm | - | - |
| 1.09 | Centring and shuttring includings, ropng , etc and removel from columns piller, piers ,abutments, post and struts. | 24.77 | sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 2.94 MB
BOQ_117316.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .