| 1 | 1₹5.2 LAccepted-AOC | 1 | Accepted-AOC Ist lowest | |
| 2 | 2₹6.4 L+₹1.1 L (21.8%)Rejected-Finance | 2 | Rejected-Finance IInd lowest | |
| 3 | 3₹6.6 L+₹1.4 L (27.2%)Rejected-Finance | 3 | Rejected-Finance IIIrd lowest |
Tender Value
₹6.4 L
EMD Value
₹9,600
Closing Date
31 Jan 2023, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer WW Sub Division Kochi 17
DW lmproving water suppry service at Mangattu road repracing old damaged of work 100mm AC pipe with 160mm PVC pipe 6kg per cm for a length 330m in Div 34 old of Kochi Corporation area Pipeline Work
2023_KWA_552388_1
E-19/2022-23/AEE/WWSUBDN/CHN
Open Tender
Civil Works - Water Works
Percentage
30 days
Division 34
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,550
₹9,600
12 Apr 2023
24 Jan 2023
2 Feb 2023
24 Jan 2023
31 Jan 2023
24 Jan 2023
24 Jan 2023 - 31 Jan 2023
Amount
Working Charges
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes.
OD128245/2022-2023:Interconnecting the existing 300 CI pipe with newly laid 160mm PVC using 300x80MS clamp & specials required supplied by the contractor and the charges for earth work excavation etc complete as per direction.
OD128269/2022-2023:Changing water supply connection /PH connections after disconnecting the existing line using 160/140/125/110/90/75/63 mm PVC saddle, 20mm PVC adapter,20mm PVC bend,20mm PVC pipe etc including charges for earth work excavation and refilling the trenches etc complete as per directions.
OD128312/2022-2023:Interconnecting with newly laid 160mm PVC pipe with existing 63mm PVC pipe using the specials supplied by the contractor and the charge for earth work excavation etc.complete as per the direction.
OD128350/2022-2023:Interconnecting with the newly laid 160mm PVC pipe with existing 100mm AC pipes using the specials supplied by the contractor and the charges for earth work excavation etc complete as per the direction
100.31.1.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class I.
Material charges
100.98.216:Supply of PVC Pipe, 6kg/cm2, 160mm Dia.
100.98.472:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.0, Size 150mm.
Valve chamber
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
udayakumar
Contract
Bidder Name
Contract
ANTONY K G
udayakumar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_810628.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .