Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47 LAccepted-AOC | L1 | Accepted-AOC . | |
| 2 | L2₹54.6 L+₹7.6 L (16.1%)Rejected-Finance | L2 | Rejected-Finance . | |
| 3 | L3₹55.6 L+₹8.6 L (18.3%)Rejected-Finance GROUND FLOOR OFFICE NO 3 TOWER 2 SHRIRAM HEIGHTS RAJ NAGAR EXT GHAZIABAD 201017 | GHAZIABAD | UTTAR PRADESH | 201017 | L3 | Rejected-Finance . |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
21 Sept 2021, 9:00 amClosed
MANAGING DIRECTOR
SUGAR MILL SONIPAT
.
2021_HBC_188182_1
SMS/23092021/18
Open Tender
Miscellaneous
Works
165 days
SUGAR MILL SONIPAT
.
2 documents required · 2 mandatory
₹100
₹1 L
20 Dec 2021
14 Sept 2021
21 Sept 2021
14 Sept 2021
21 Sept 2021
14 Sept 2021
Complete repair, maintenance and operation from cane unloader to R.B.C. during crushing season 2021-22. (B) Complete operation of FFE’s, evaporators, juice heaters and pan station. .:
(During complete crushing season 2021-22) (i) Operation, Repair and maintenance for smooth functioning of mill house from Cane carrier to RBC along with all type fabrication and erection jobs etc. complete within all respect i.e. Both cane unloaders, cane carrier 1 & 2, cane leveler, both cane cutters, Fibrizer, rack carrier, inter rack carrier 1,2 & 3 with donally chutes, belt conveyor, bagasse elevator chain, main bagasse carrier, all return bagasse belt conveyors, Mill house along with alignment of all rollers, transmission pinion gears, crown pinion, tail bar, C.S coupling etc., both mill turbines, all mill house pumps, hydraulic systems, lubricators, D.S.M screen, all valves, all pipelines, all reduction gear boxes and driving arrangements etc. (ii) Operation, Repair and maintenance work of both boilers with its all accessories i.e. I.D Fans, F.D. Fans, ducting’s, S.A. Fans, P.A. Fan, Bagasse feeders, Reduction Gear Boxes, R.O plant, All feed pumps, All High Pressure Valves, Economizer, Air Heater, Super Heater, wet scrubber plant system complete with pumps, chimney and cleaning work etc. Air Pollution control system is the sole responsibility of the party.
(During complete crushing season 2021-22) Complete operation of FFE’s, evaporators, juice heaters and pan station
Integrated Casetech Consultants Private Limited
Leaning Security Service
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .