| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC M K ENGINEERS AND CONTRACTORS PARASSALA TVPM | PARASSALA | THIRUVANANTHAPURAM | KERALA | L1 | Accepted-AOC The selected contractor has executed agreement | |
| 2 | L2₹7.5 L+₹47,336.55 (6.78%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.5 L+₹49,280.95 (7.05%)Rejected-Finance AMARAVILA KERALA | THIRUVANANTHAPURAM | KERALA | 695001 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | LIBIN.T L2 | MANOJ KUMAR S (M.K.Engineers And Contractor) L1 | MANU S S L3 |
|---|---|---|---|---|---|---|
| 1.00Septic tank and pipe line work | ||||||
| 1.00 | OD247869/2025-2026:Removing the existing factory made coloured chamfered edge Cement Concrete paver blocks and relaying the same after levelling the bed of metal chips, compacting and filling the joints and cutting of paver blocks as per required size and pattern, finishing etc. complete as per manufacturer's specifications & direction of Engineerin-Charge. | 87.5 | sqm | 94 ₹8,225 Lowest | 150 ₹13,125 | 120.36 ₹10,531.5 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 87.1 | cum | 248 ₹21,600.8 | 175 ₹15,242.5 Lowest | 232.75 ₹20,272.53 |
| 1.00 | 2.20.2:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth exceeding 1.5 m but not exceeding 3 m | 37.8 | sqm | 19 ₹718.2 Lowest | 300 ₹11,340 | 85.84 ₹3,244.75 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.15 | cum | 7,623 ₹69,750.45 | 5,750 ₹52,612.5 Lowest | 7,176.46 ₹65,664.61 |
| 1.00 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 63.6 | sqm | 451 ₹28,683.6 | 400 ₹25,440 Lowest | 423.91 ₹26,960.68 |
| 1.01 | OD248393/2025-2026:Sinking of 120 cm dia concrete ring in ordinary soil including cost of all materials, labour charge necessary scooping etc. all complete as per direction of engineer in charge | 16 | each | 742 ₹11,872 Lowest | 2,450 ₹39,200 | 1,814.25 ₹29,028 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 84.6 | sqm | 807 ₹68,272.2 | 475 ₹40,185 Lowest | 759.33 ₹64,239.32 |
| 1.01 | OD248261/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement cost shall not be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth level: Concrete of M30 grade with minimum cement content of 340 kg /cum | 15.64 | cum | 8,930 ₹1,39,665.2 Lowest | 9,000 ₹1,40,760 | 9,931.47 ₹1,55,328.19 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,267.8 | kilogram | 108 ₹2,44,922.4 | 88 ₹1,99,566.4 Lowest | 100.89 ₹2,28,798.34 |
Tender Value
₹8.5 L
EMD Value
₹21,186
Closing Date
27 Jun 2026, 11:00 amClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram.
DEPOSIT-Relocation of Septic tank at ITI Chackai-Work-General Civil Work
2026_PWD_856017_1
PWD/BLDG/TR/22967/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thirunananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,186
Yes
14 Aug 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Septic tank and pipe line work | |||||
| 1.001 | OD247869/2025-2026:Removing the existing factory made coloured chamfered edge Cement Concrete paver blocks and relaying the same after levelling the bed of metal chips, compacting and filling the joints and cutting of paver blocks as per required size and pattern, finishing etc. complete as per manufacturer's specifications & direction of Engineerin-Charge. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.003 | 2.20.2:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth exceeding 1.5 m but not exceeding 3 m | 1 | sqm | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | - | sqm | - | - |
| 1.006 | OD248393/2025-2026:Sinking of 120 cm dia concrete ring in ordinary soil including cost of all materials, labour charge necessary scooping etc. all complete as per direction of engineer in charge | - | each | - | - |
| 1.007 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1 | sqm | - | - |
| 1.008 | OD248261/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement cost shall not be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth level: Concrete of M30 grade with minimum cement content of 340 kg /cum | - | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
BOQ_1446797.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
epayment.pdf
Tender Documents • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
declaration.pdf
Tender Documents • 0.00 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .