| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance AT MALDA PO UDAYAPUR DIST JAJPUR PIN 755017 | JAJAPUR | ODISHA | 755017 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance AT BALIKERA P O BALADMALIA P S PURI SADAR DIST PURI PIN 752013 | PURI | PURI | ODISHA | 752013 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹5,038
Closing Date
18 Jul 2026, 5:00 pmClosed
Executive Engineer
RURAL WORKS DIVISION, PURI
Siruli Project To Golappada Road_Road_ Pot hole Repair and PMC and Seal coat,fixing of Km stone0.500 to 1.000
2026_CERWI_135409_1
Online-01 of 2026-27
National Competitive Bid
Civil Works - Roads
Percentage
30 days
Puri
2 documents required · 2 mandatory
₹4,000
₹5,038
Yes
22 Aug 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
10 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing & grubbing road land including uprooting rank vegetation , grass, bushes,shrubs, saplings & trees girth upto 300 mm, removal of stumps of such trees cut earlier & disposal of unserviceable materials by manual means & stacking of serviciable materials to be used or acutioned, upto a lead of 1000 m including removal & disposal of top organic soils not exceeding 150 mm in thickness as per technical specification clause 210 & as per direction of the Engineer-in-Charge. | 3,450 | sqm | 8.63 | ₹29,773.5 |
| 2 | Clearing the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and /or compressed air to receive bituminous items etc complete as per specification and direction of the Engineer-in-Charge. | 1,181.25 | sqm | 5.6 | ₹6,615 |
| 3 | Providing and applying tack coat using bitumen @0.2kg per sqm on the prepared bitumenous surface/granular base treated with primer/ granular base (not primed) cleaned surface including cost of all materials, labour , T&P etc. complete as per the specification and direction of the Engineer-in-Charge. | 1,181.25 | sqm | 12.4 | ₹14,647.5 |
| 4 | Labour for scraping cleaning the road suface applying tack coat using 3.0 kg of bitumen for 10 Sqm and laying 75 mm thick built up spray grouting in two layers 37.5mm thick in each layer using 0.45 cum of 25 mm to 40 mm size hard granite metal and 12.00 kg penetration grade of bitumen for 10 sqm with 0.12 Cum of 12 mm size hard granite chips as key stone for 10 sqm spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with PRR including hire and running charges of PRR and all other machineries but excluding cost and conveyance of bitumen ,metal and chips complete as per specification and direction of Engineer in charge. | 131.56 | sqm | 579.3 | ₹76,212.71 |
| 5 | Labour for scraping cleaning the road suface applying tack coat using 3.0 kg of bitumen for 10 Sqm and laying 37.5 mm thick built up spray grouting in one layer using 0.45 cum of 25 mm to 40 mm size hard granite metal and 12.00 kg penetration grade of bitumen for 10 sqm with 0.12 Cum of 12 mm size hard granite chips as key stone for 10 sqm spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with PRR including hire and running charges of PRR and all other machineries but excluding cost and conveyance of bitumen ,metal and chips complete as per specification and direction of Engineer in charge. | 59.97 | sqm | 334.2 | ₹20,041.97 |
| 6 | Providing and laying 20 mm thick premix carpet using 0.27 cum of 13.2 mm to 5.6 mm size crushed stone chipping & 14.60 kg. penetration grade of bitumen per 10 sqm including hand packing to proper camber and consolidation with PRR including hire and running charges of PRR, hot mix plant, bitumen boilers and other T&P articles but excluding cost & conveyance of chips & bitumen complete as per specification & direction of the Engineer-in-charge | 1,240.31 | sqm | 197 | ₹2,44,341.07 |
| 7 | Providing and laying 6 mm thick precoated seal coat Type - B using 0.06 cum of 6.7 mm size chips and down graded as per sieve analysis and 6.8 kg. of bitumen per 10 sqm including hire and running charges of PRR, hot mix plant, tar boiler & all other T&P articles but excluding cost & conveyance of chips & bitumen. | 1,181.25 | sqm | 82.9 | ₹97,925.63 |
| 8 | Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site by mechanical means within a lead of 5 kms, spreading, grading to required slope & compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H specifications forRoad & Bridge works (4th Revision) | 70.88 | cum | 201.12 | ₹14,255.39 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.38 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_601014.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .