| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-Finance | L1 | Accepted-Finance L1 In Financial Bid | |
| 2 | L2₹14.7 L+₹24,420.52 (1.69%)Rejected-Finance | L2 | Rejected-Finance L2 In Financial Bid | |
| 3 | Rejected-Technical | - | Rejected-Technical Check List point 18 is wrong |
| Sl No | Description | Qty | Unit | PIYUSH CONTRACTORS L1 | M/S SAVERA BUILDCON L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. | 130.52 | M3 | 63 ₹8,222.76 Lowest | 64 ₹8,353.28 |
| 2.00 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 23.71 | M2 | 230 ₹5,453.3 Lowest | 235 ₹5,571.85 |
| 3.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 18.65 | M3 | 5,800 ₹1,08,170 Lowest | 5,850 ₹1,09,102.5 |
| 4.00 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 84.02 | M3 | 5,300 ₹4,45,306 Lowest | 5,350 ₹4,49,507 |
| 5.00 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | 40.65 | M2 | 645 ₹26,219.25 Lowest | 650 ₹26,422.5 |
| 6.00 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | 16.96 | M3 | 7,000 ₹1,18,720 Lowest | 7,100 ₹1,20,416 |
| 7.00 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 1.4 | MT | 94,000 ₹1,31,600 Lowest | 95,000 ₹1,33,000 |
| 8.00 | P.C.C.1:6:12 in back filling of Abutment including all cost of material, labour and T&P etccomplete. | 10.47 | M3 | 5,350 ₹56,014.5 Lowest | 5,450 ₹57,061.5 |
| 9.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 87.22 | M2 | 95 ₹8,285.9 Lowest | 100 ₹8,722 |
| 10.00 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | 4 | No | 220 ₹880 Lowest | 225 ₹900 |
Tender Value
₹15.5 L
EMD Value
₹31,000
Closing Date
30 May 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 02 CONSTRUCTION OF D.R.B AT KM 2.256 OF HUSSAINPUR MINOR OF MGC-II
2026_UPIDC_1151892_2
01/EE2026-27
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹31,000
10 Jun 2026
25 May 2026
30 May 2026
25 May 2026
30 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. | 130.52 | M3 | - | - |
| 2 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 23.71 | M2 | - | - |
| 3 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 18.65 | M3 | - | - |
| 4 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 84.02 | M3 | - | - |
| 5 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | 40.65 | M2 | - | - |
| 6 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | 16.96 | M3 | - | - |
| 7 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 1.4 | MT | - | - |
| 8 | P.C.C.1:6:12 in back filling of Abutment including all cost of material, labour and T&P etccomplete. | 10.47 | M3 | - | - |
| 9 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 87.22 | M2 | - | - |
| 10 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | 4 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
lot02.pdf
Tender Documents • 2.98 MB
BOQ_2157769.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .