Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | 1 | Accepted-AOC Accepted | |
| 2 | 2₹3.9 L+₹15,419.51 (4.17%)Rejected-AOC | 2 | Rejected-AOC Not Accepted | |
| 3 | 3₹4.8 L+₹1.1 L (29.6%)Rejected-AOC INDRA NAGAR COLONY DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | 3 | Rejected-AOC Not Accepted | |
| 4 | 4₹5.6 L+₹1.9 L (50.7%)Rejected-AOC H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | 4 | Rejected-AOC Not Accepted | |
| 5 | 5₹6.5 L+₹2.8 L (74.9%)Rejected-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | 5 | Rejected-AOC Not Accepted |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
1 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(OANDM) CR DEHRADUN
SUPERINTENDING ENGINEER, O and M CIRCLE OFFICE, PTCUL, Yamuna Colony, Dehradun
Work of Replacement of Damaged Legs and Tower Parts of Tower No. 116A and 119 B of 132 KV S/s Bindal under 220 KV (OandM) Division, Jhajhra, Dehradun against Tender specification No.T-02/SE (OandM)/CR/D.Dun/2022-23
2022_PTCUX_43778_2
02/SE(OANDM)CR/PTCUL/DDUN22-23
Open Tender
Miscellaneous Works
Lump-sum
30 days
DEHRADUN
as per bid
3 documents required · 3 mandatory
₹590
Executive Engineer (O and M), Division, PTCUL Dehr
₹15,700
8 Sept 2023
29 Apr 2022
2 Jul 2022
29 Apr 2022
1 Jul 2022
29 Apr 2022
180 days
Amount
Work of removing and making free conductor, disc insulators and accessories etc. between Tower No. 115A, 116A and 117A of 132 kV Bindal-Rishikesh Line and proper clamping to avoid shifting conductor towards next both side towers including labour and T&P etc. to complete the work. (Total Span Between Tower No. 115A to 117A =695 m)
Work of clearing the space under the tower and making the route for carrying required T&P by removing wild bushes.
Work of carrying required material and heavy T&P to complete the work by head loading to the working site and retured back to road side .
Work of erection and hoisting the conductor, disc insulators and accessories between Tower No. 115A, 116A and 117A of 132 kV Bindal-Rishikesh Line after jointing the conductor by mid san compression joints and compression repaire sleev where required of 132 kV Bindal-Rishikesh Line including labour, T&P and transport facility for labour, material and T&P etc. to complete the work. (Total Span Between Tower No. 115A to 117B =695 m)
Work of removing and making free earthwire and accessories etc. between Tower No. 115A, 116A and 117A of 132 kV Bindal-Rishikesh Line and proper clamping to avoid shifting earthwire towards next both side towers including labour and T&P etc. to complete the work. (Total Span Between Tower No. 115A to 117A =695 m)
Work of erection and hoisting the earthwire and accessories between Tower No. 115A, 116A and 117A of 132 kV Bindal-Rishikesh Line after jointing the earthwire by mid san compression joints and compression repaire sleev where required of 132 kV Bindal-Rishikesh Line including labour, T&P and transport facility for labour, material and T&P etc. to complete the work. (Total Span Between Tower No. 115A to 117B =695 m)
Work of fabrication of required tower parts, leg, bressing and members for extension section of A & B-Type tower including labour and T&P etc. to complete the work.
Work of dismentling of required tower, leg, bressing and members of A-Type tower No. 116A including labour and T&P etc. to complete the work.
Work of erection and fixing of required tower super structure, tower parts leg, bressing and members for extension section of Tower No. 116 &119B including labour and T&P etc. to complete the work.
Work of teg welding of tower bolts and nut of first section including labour and T&P etc. to complete the work.
Work of repairing of tilted stub by dismentling of CC of foundation including labour and T&P etc. to complete the work.
Work of stub setting all foundations work excluding CC including labour, Materail and T&P etc. to complete the work.
Work of CC in ratio (1:1.5:3) (Cement :sand and aggregate of size 10 mm) including labour, Materail and T&P etc. to complete the work.
Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work.
Earting pipe type (set of 2 No. for each tower)
Earting pipe type (set of 2 No. for each tower) (GST will be paid extra)
M/S SWASTIKA ENTERPRISES
HARIOM CONSTRUCTION
MSN CONSTRUCTION COMPANY
M/s Singhal and Co
KOTHARI ENTERPRISES
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .